HomeMy WebLinkAboutUtility Study Explanation Letterr
July 14, 2011
Erika Bridges, E.I.T.
Graduate Civil Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: Creek Meadows — Section 2, Phase 3
Utility Study Explanation Letter
RME No. 260 -0430
Erika Bridges:
The Water & Sanitary Sewer Report, submitted for the above referenced project, includes
modeling of future phases Section 1A, Phase 3, 4A, 4B & and Section 4, Phase 2A & 2C. These
improvements are not proposed to be constructed with this phase of the development. However,
the inclusion of these improvements in the models do not have any adverse or "beneficial"
influences on sanitary sewer capacities or domestic /fire flow hydraulics within Section 2, Phase
3 utility improvements.
Please do not hesitate to call if you have any questions.
Sincerely,
CD 1- 260 - 0430 -L06
....
CP�E OF 7C C � 1
1
i * *
:
...
88583 1 i
( 'CCNS C) • ,•
1 ‘tI kW∎ O".. 7
Rabon A. Metcalf, P.E. No. 88583
Texas Firm Registration No. F -4695
rabon @rmengineer.com
7607 Eastmark Drive, Ste. 250 -F <77840>
P.O. Box 9253, College Station, TX 77842
Off /Fax: (979) 764 -0704
email: civil @rmengineer.com
Page 1 of 1