Loading...
HomeMy WebLinkAboutUtility Study Explanation Letterr July 14, 2011 Erika Bridges, E.I.T. Graduate Civil Engineer City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Creek Meadows — Section 2, Phase 3 Utility Study Explanation Letter RME No. 260 -0430 Erika Bridges: The Water & Sanitary Sewer Report, submitted for the above referenced project, includes modeling of future phases Section 1A, Phase 3, 4A, 4B & and Section 4, Phase 2A & 2C. These improvements are not proposed to be constructed with this phase of the development. However, the inclusion of these improvements in the models do not have any adverse or "beneficial" influences on sanitary sewer capacities or domestic /fire flow hydraulics within Section 2, Phase 3 utility improvements. Please do not hesitate to call if you have any questions. Sincerely, CD 1- 260 - 0430 -L06 .... CP�E OF 7C C � 1 1 i * * : ... 88583 1 i ( 'CCNS C) • ,• 1 ‘tI kW∎ O".. 7 Rabon A. Metcalf, P.E. No. 88583 Texas Firm Registration No. F -4695 rabon @rmengineer.com 7607 Eastmark Drive, Ste. 250 -F <77840> P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 764 -0704 email: civil @rmengineer.com Page 1 of 1