Loading...
HomeMy WebLinkAboutFinal Inspection ChecklistDATE: TO: FROM: RE: (tr ff"' 11/29/2011 Israel Koite Checklist for Final Inspection for: CITY ()I Coi.LI:GIi STATION Home of texas Ac M University" The following items need to be repaired or replaced before a Letter of Completion on the above - mentioned project would be issued. 1. Install "Emergency Access Only" signs 2. Establish vegetation in all disturbed areas. 3. Submit certified results of fire flow test 4. Submit Bac -t results 5. Seal all expansion joints in curb with NP -1 6. Seal all expansion joints in sidewalk with NP -1 7. Test tracer wire. 8. Verify road core results. 9. Install and energize street lights 10. Verify that BTU has completed installing and energized all conductor. 11. *Establish 70% vegetation coverage or install rolled degradable socks with seeds, which are acceptable in lieu of achieving 70% vegetation coverage now for general disturbed areas. 12. Dedicate specific easements for the proposed infrastructure Creek Meadows Section 2 Ph. 3 Contractor tt Note: Punch list is subject to change if and when other issues arise that require correction. Planning & Development Services PO Box 9960, College Station, Texas 77840 • 979.764.3570 • www.cstx.gov City