HomeMy WebLinkAboutFinal Inspection ChecklistDATE:
TO:
FROM:
RE:
(tr ff"'
11/29/2011
Israel Koite
Checklist for Final Inspection for:
CITY ()I Coi.LI:GIi STATION
Home of texas Ac M University"
The following items need to be repaired or replaced before a Letter of Completion on the above -
mentioned project would be issued.
1. Install "Emergency Access Only" signs
2. Establish vegetation in all disturbed areas.
3. Submit certified results of fire flow test
4. Submit Bac -t results
5. Seal all expansion joints in curb with NP -1
6. Seal all expansion joints in sidewalk with NP -1
7. Test tracer wire.
8. Verify road core results.
9. Install and energize street lights
10. Verify that BTU has completed installing and energized all
conductor.
11. *Establish 70% vegetation coverage or install rolled degradable
socks with seeds, which are acceptable in lieu of achieving 70%
vegetation coverage now for general disturbed areas.
12. Dedicate specific easements for the proposed infrastructure
Creek Meadows Section 2 Ph. 3
Contractor
tt
Note: Punch list is subject to change if and when other issues arise that require correction.
Planning & Development Services
PO Box 9960, College Station, Texas 77840 • 979.764.3570 • www.cstx.gov
City