HomeMy WebLinkAboutTCEQ Exception Letter for Utility ImprovementsJ@ 5, 2011
David Loflin
Texas Commission of Environmental Quality
Water Supply Division
MC 153
P.O. Box 13087
Austin, TX 78711
RE: Creek Meadows (Section 2, Phase 3) — College Station, TX
TCEQ Exception Letter for Utility Improvements
RME No. 260 -0430
Mr. David Loflin:
7607 Eastmark Drive, Ste. 250 -F <77840>
P.O. Box 9253, College Station, TX 77842
Off /Fax: (979) 764 -0704
email: civil @rmengineer.com
The above referenced project will install the following improvements within the distribution
system of the Wellborn S.U.D.:
❖ Approximately 1,107 linear feet of 6 ", and 8" PVC (C -909, Class 200) water line;
❖ Applicable fire hydrants, services, valves & fittings.
Design and construction of these improvements will be in accordance with the latest
Bryan/College Station Unified Water & Sewer Design Guideline Manual, Standard Details, and
Specifications and Chapter 290 of the TCEQ Rules & Regulations. This quantity of water line is
less than 10% of the total length of water line within the City's current distribution system.
Therefore, an exception for plan review is being requested for this project and its water system
improvements.
Please call should you have any questions or require assistance.
Sincerely,
Rabon A. Metcalf, P.E.
Texas Firm Registration No. F- 004695
rabon@rmengineer.com
xc: Erika Bridges, E.I.T.
Graduate Civil Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77840
of rE�
•. • .0.N..7.1:1;.,11-
�... • s ��1
ro
885
CD1- 260- 0430 -L04 Page 1 of 1
PUBLIC WATER SYSTEM PLAN REVIEW SUBMITTAL FORM
(Complete and Attach to Submittal Package)
Date: September 08, 2009
TCEQ PWS Identification No. *: 0210016 CCN No. or Application No.* *:11340
Water System Name: Wellborn S.U.D.
Water System Owner: Wellborn S.U.D. Type of Entity: S.U.D.
Address: P.O. Box 250, Wellborn, TX 77881 Phone: (979) 690 -9799
Responsible Official: Steven Cast Title: Manager
County (system location) : Brazos County Subdivision Sec., Phase, Unit, etc. Creek Meadows — Section 2, Ph 3
Mechanism & Source of Financing: Private
Engineer: Rabon A. Metcalf, P.E. Registration Number: 88583
Firm Name: RME Consulting Engineers Phone: (979) 764 -0704
Firm Address: P.O. Box 9253, College Station, TX 77842 Fax: (979) 764 -0704
* If no PWS Number exists, the owner must submit a business plan, if required, in accordance with §290.39(f) and (g).
** If a required CCN number does not exist, an acceptable application to obtain a CCN number must be made before a project submittal can be
technically reviewed. In addition, if a submittal is for a project located outside the CCN area, a CCN amendment application must be submitted before a
project may be reviewed for construction approval. Please refer to 30 TAC Chapter 291 for additional information regarding CCNs.
If this is a new (proposed) system, you must attach the following with this submittal: NOT APPLICABLE
❑ Attach a list of all water utilities within /2 mile of the proposed service area boundaries
❑ Copies of formal applications for service from each of the following
❑ any municipality if the system is within its ETJ;
❑ any district or other political subdivision whose corporate boundaries are within IA mile of the proposed
service area boundaries
❑ any other water service provider whose certificated service area boundary is within 'A mile of the proposed
service area boundaries
❑ Documentation that all application requirements including payment of fees were complied with.
❑ Copies of written responses from each of the entities listed above.
❑ Business plan, if required by 30 TAC 290.39(f) & (g). The business plan financial requirements for non - community
water systems must confirm capital availability to construct the system according to TCEQ requirements. This
would consist of a balance sheet that shows liabilities as well as assets, not just a bank confirmation of a deposit
account. Alternatively, if the project is being constructed with loan funds, then a loan commitment letter from the
lender specific to that project will suffice.
❑ Justification for constructing a separate system (unless none of the entities listed above exist)
❑ Plans and specifications with an engineering report all sealed by design engineer.
Type of Project (please check the appropriate boxes):
❑ Distribution System Modifications
❑ Well completion data on previously approved well
❑ Pressure Maintenance Facilities Modifications
❑ Disinfection Facilities or Other Modifications
❑ Preliminary Engineering Report w/o plans
❑ Modification of Surface Water Treatment Plant
0
Rabon A. Metcalf, P.E.
Printed Engineer's Name
July 5, 2011
Date
❑ Storage Capacity Modifications
❑ Water Well Construction, Proposed
❑ Proposed Innovative Process Study
❑ Ground Water Treatment Plant, New
❑ Surface Water Treatment Plant, New
❑ Tex. Water Dev. Board Proj. No.
Other(PleaseExplain)
IF THIS SUBMITTAL IS A REVISION OF PREVIOUSLY SUBMITTED PLANS, PLEASE ENTER THE ASSIGNED TCEQ
LOG NUMBER: . Please call (512) 239 -6960 if you have questions regarding this form. Your
cooperation will help us provide better service. Additional helpful information and rules are available at our website:
http: //www. tceq. state. tx. us/ permitting /waterperm /ud /planrev. html
I hereby certify that the above information is to the best of my knowledge, true and correct. ' Cr E
•2
Revised 9/12/02
C:\ USERS \RABON \RME \PROJECTS \202 -0413 CMP- SECTION 2 -PH 3 \ENGINEERING \TCEQ FORM 1023.311 APPROVAL,
6(S