Loading...
HomeMy WebLinkAboutTCEQ Exception Letter for Utility ImprovementsJ@ 5, 2011 David Loflin Texas Commission of Environmental Quality Water Supply Division MC 153 P.O. Box 13087 Austin, TX 78711 RE: Creek Meadows (Section 2, Phase 3) — College Station, TX TCEQ Exception Letter for Utility Improvements RME No. 260 -0430 Mr. David Loflin: 7607 Eastmark Drive, Ste. 250 -F <77840> P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 764 -0704 email: civil @rmengineer.com The above referenced project will install the following improvements within the distribution system of the Wellborn S.U.D.: ❖ Approximately 1,107 linear feet of 6 ", and 8" PVC (C -909, Class 200) water line; ❖ Applicable fire hydrants, services, valves & fittings. Design and construction of these improvements will be in accordance with the latest Bryan/College Station Unified Water & Sewer Design Guideline Manual, Standard Details, and Specifications and Chapter 290 of the TCEQ Rules & Regulations. This quantity of water line is less than 10% of the total length of water line within the City's current distribution system. Therefore, an exception for plan review is being requested for this project and its water system improvements. Please call should you have any questions or require assistance. Sincerely, Rabon A. Metcalf, P.E. Texas Firm Registration No. F- 004695 rabon@rmengineer.com xc: Erika Bridges, E.I.T. Graduate Civil Engineer City of College Station 1101 Texas Avenue South College Station, TX 77840 of rE� •. • .0.N..7.1:1;.,11- �... • s ��1 ro 885 CD1- 260- 0430 -L04 Page 1 of 1 PUBLIC WATER SYSTEM PLAN REVIEW SUBMITTAL FORM (Complete and Attach to Submittal Package) Date: September 08, 2009 TCEQ PWS Identification No. *: 0210016 CCN No. or Application No.* *:11340 Water System Name: Wellborn S.U.D. Water System Owner: Wellborn S.U.D. Type of Entity: S.U.D. Address: P.O. Box 250, Wellborn, TX 77881 Phone: (979) 690 -9799 Responsible Official: Steven Cast Title: Manager County (system location) : Brazos County Subdivision Sec., Phase, Unit, etc. Creek Meadows — Section 2, Ph 3 Mechanism & Source of Financing: Private Engineer: Rabon A. Metcalf, P.E. Registration Number: 88583 Firm Name: RME Consulting Engineers Phone: (979) 764 -0704 Firm Address: P.O. Box 9253, College Station, TX 77842 Fax: (979) 764 -0704 * If no PWS Number exists, the owner must submit a business plan, if required, in accordance with §290.39(f) and (g). ** If a required CCN number does not exist, an acceptable application to obtain a CCN number must be made before a project submittal can be technically reviewed. In addition, if a submittal is for a project located outside the CCN area, a CCN amendment application must be submitted before a project may be reviewed for construction approval. Please refer to 30 TAC Chapter 291 for additional information regarding CCNs. If this is a new (proposed) system, you must attach the following with this submittal: NOT APPLICABLE ❑ Attach a list of all water utilities within /2 mile of the proposed service area boundaries ❑ Copies of formal applications for service from each of the following ❑ any municipality if the system is within its ETJ; ❑ any district or other political subdivision whose corporate boundaries are within IA mile of the proposed service area boundaries ❑ any other water service provider whose certificated service area boundary is within 'A mile of the proposed service area boundaries ❑ Documentation that all application requirements including payment of fees were complied with. ❑ Copies of written responses from each of the entities listed above. ❑ Business plan, if required by 30 TAC 290.39(f) & (g). The business plan financial requirements for non - community water systems must confirm capital availability to construct the system according to TCEQ requirements. This would consist of a balance sheet that shows liabilities as well as assets, not just a bank confirmation of a deposit account. Alternatively, if the project is being constructed with loan funds, then a loan commitment letter from the lender specific to that project will suffice. ❑ Justification for constructing a separate system (unless none of the entities listed above exist) ❑ Plans and specifications with an engineering report all sealed by design engineer. Type of Project (please check the appropriate boxes): ❑ Distribution System Modifications ❑ Well completion data on previously approved well ❑ Pressure Maintenance Facilities Modifications ❑ Disinfection Facilities or Other Modifications ❑ Preliminary Engineering Report w/o plans ❑ Modification of Surface Water Treatment Plant 0 Rabon A. Metcalf, P.E. Printed Engineer's Name July 5, 2011 Date ❑ Storage Capacity Modifications ❑ Water Well Construction, Proposed ❑ Proposed Innovative Process Study ❑ Ground Water Treatment Plant, New ❑ Surface Water Treatment Plant, New ❑ Tex. Water Dev. Board Proj. No. Other(PleaseExplain) IF THIS SUBMITTAL IS A REVISION OF PREVIOUSLY SUBMITTED PLANS, PLEASE ENTER THE ASSIGNED TCEQ LOG NUMBER: . Please call (512) 239 -6960 if you have questions regarding this form. Your cooperation will help us provide better service. Additional helpful information and rules are available at our website: http: //www. tceq. state. tx. us/ permitting /waterperm /ud /planrev. html I hereby certify that the above information is to the best of my knowledge, true and correct. ' Cr E •2 Revised 9/12/02 C:\ USERS \RABON \RME \PROJECTS \202 -0413 CMP- SECTION 2 -PH 3 \ENGINEERING \TCEQ FORM 1023.311 APPROVAL, 6(S