Loading...
HomeMy WebLinkAboutPlans and Specification ReviewJuly 5, 2011 Louis Heron III, P.E. Texas Commission of Environmental Quality Plans & Specification Review MC 148 P.O. Box 13087 Austin, TX 78711 -3087 RE: Chapter 217 Summary Transmittal Letter Permittee: City of College Station Permit Number: Lick Creek WWTP: WQ0010024 -006 Project Name: Creek Meadows (Section 2, Phase 3) — College Station, TX County: Brazos County Grant No.: N/A Mr. Louis Heron: The purpose of this letter is to provide the TCEQ with the information necessary to comply with the requirements of Chapter 217.8(c) of the TCEQ's rules entitled, Design Criteria for Sewerage Systems. The necessary information includes: 1. Engineering Firm: RME Consulting Engineers 1391 Seamist Lane <77845> P.O. Box 9253 College Station, TX 77842 2. Design Engineer: Rabon A. Metcalf, P.E. Off/Fax: (979) 764 -0704 3. Location: Brazos County, TX 4. Project Identifier: Creek Meadows: Section 2, Phase 3 — Paving, Drainage & Utility Improvements 5. Operator: City of College Station 6. Collection System: 7607 Eastmark Drive, Ste. 250 -F <77840> P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 764 -0704 email: civil @rmengineer.com CD1- 260 - 0430 -L05 Page 1 of 2 ' irtansmitikszt Eiraggsareerars City of College Station — Public Utilities Department 7607 Eastmark Drive, Ste. 250 -F <77840> P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 764 -0704 email: civil @rmengineer.com 7. Plan & Specification Compliance: Design and construction of these improvements are in accordance with the Bryan/College Station Unified Water & Sewer Specifications, Design Guidelines Manual, and Chapter 217 of the TCEQ Rules & Regulations. This sanitary sewer improvement project will be constructed with the City of College Station performing a technical review. The plans and specifications which describe the project identified in this letter are in substantial compliance with all the requirements of Chapter 217. 8. Variances: All segments of sanitary sewer line installed for this phase of construction, do not meet the minimum flow velocity of 2.0 ft/s at peak flow conditions. The design of these lines comply with minimum size, type and slope, however, the low number of dwelling units discharging to these lines prevent peak flows from reaching a flow velocity of 2.0 ft/s; 9. Project Scope: The above referenced project will install the following sanitary sewer improvements within the CCN of the City of College Station (CoCS): ❖ Approximately 974 linear feet of gravity sewer: 6" & 8" PVC (SDR 26, D3034); ❖ Applicable manholes, cleanouts, and service leads; If you have any questions regarding this project, please contact Mr. Rabon A. Metcalf, P.E. (Off /Fax: 979.764.0704 or rabon @rmengineer.com). Sincerely, � of . � l 1 � S' 1, • ...._ ....... . .. � * / • • ao Rabon A. Metcalf, P.E. " o. 88 �1 �� �' o + A L � r •. Texas Firm Registration No. F -4695 �'NA ■ - tl rabon @rmengineer.com xc: Erika Bridges, E.I.T. Graduate Civil Engineer City of College Station 1101 Texas Avenue South College Station, TX 77840 CD1- 260 - 0430 -L05 Page 2 of 2