HomeMy WebLinkAboutLetter Acknowledging City Standards Hester Engineering Company
7607 Eastmark Drive, Suite 253 -B
College Station, Texas 77840
979- 693 -1100
mhester @hester- engr.com
May 10, 2011
Erika Bridges, EIT
College Station Development Services Department
City of College Station
P.O. Box 9960
College Station, Texas 77842
979 - 764 -3570
RE: LETTER ACKNOWLEDGING CITY STANDARDS
SPRING CREEK TERRACE PHASE ONE, COLLEGE STATION, TEXAS
Dear Ms. Bridges
The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer,
streets and drainage for the above referenced project, to the best of my knowledge, do not deviate from the
B /CS Design Guidelines Manual. Any alternate design or construction methodology that was used is listed below.
1. NA
I also acknowledge, to the best of my knowledge that the details provided in the construction plans are
in accordance with the Bryan /College Station Standard Details.
Sincerely,
C (454.,(0.4-e_2), ..111??
Michael G. Hester, P.E.