HomeMy WebLinkAboutEngineer's Cost Estimate Engineer's Cost Estimate
UNIVERSITY OAKS - SECTION TWO
SIDEWALK IMPROVEMENTS
COLLEGE STATION, BRAZOS COUNTY, TEXAS
UNIT TOTAL
NO. DESCRIPTION - �' UNIT COST COST
PAVING IMPROVEMENTS
1 Mobilization, Construction Staking & All Required 1 LS $800.00 $800.00
Testing by Contractor
2 In -Place Earthwork Embankment Finishing (Topsoil 25 CY $4.75 $118.75
& Miscellaneous)
3 4" Thick Reinforced Concrete Sidewalk (Includes 1,588 SF $4.25 $6,749.00
H/C Ramps)
SUB -TOTAL = $7,667.75
. PEE oL ���, III ESTIMATED CONSTRUCTION COST = $7,667.75
—7 4 * : , 1 ..
* / � 10% CONTINGENCY = $766.78
, .. � LF GRAND TOTAL = $8,434.53
� 88583 #1
. C, , '• /CENS .� /�
�' • N 1\
is RME Consulting Engineers
TEXAS FIRM REGISTRATION No. F -4695
"���' POST OFFICE BOX 9253
_ COLLEGE STATION, TEXAS 77842
- OFF/FAX: (979) 764 -0704
r + E -mail: civil @rmengineer.com
Estimates and projections prepared by RME Consulting Engineers relating to construction costs and
schedules, operation and maintenance costs, equipment characteristics and performance, and operating
results are based on this office's experience, qualifications and judgment as a design professional. Since
RME has no control over weather, cost and availability of labor, material and equipment, labor
productivity, construction contractor's procedures and methods, unavoidable delays, construction
contractor's methods of determining prices, economic conditions, competitive bidding or market
conditions and other factors affecting such estimates or projections, this office does not guarantee that
actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by
the Engineer of record.
1 of 1
CD1- 220 - 0446 -E01
Engineer's Cost Estimate
UNIVERSITY OAKS — SECTION TWO
LOTS 14R1, 14R2, 15R1, 15R2, 16R1, 16112, 20R1, 20R2, 24R1 & 24112
SIDEWALK IMPROVEMENTS
COLLEGE STATION, BRAZOS COUNTY, TEXAS
h
i F 1 .M x � t `� 'P-',,L' .. $ _ �` a`
PAVING IMPROVEMENTS
1 Mobilization, Construction Staking & All Required 1 LS $500.00 $500.00
Testing by Contractor
2 In -Place Earthwork Embankment Finishing (Topsoil 30 CY $4.00 $120.00
& Miscellaneous)
3 4" Thick Reinforced Concrete Sidewalk (Includes 2,386 SF $4.00 $9,544.00
H/C Ramps)
SUB -TOTAL = $10,164.00
,E OF rFI
r •.4, I ESTIMATED CONSTRUCTION COST = $10,164.00
* : ••• �1� g• 10% CONTINGENCY = $210.53
i *: /'■ t 0
'AB�,v .. ; GRAND TOTAL = $10,374.53
r r✓ :s83 .
�% � o:•• '�F: NS ; °..
It �vt...::.:`fi 1 3
1
.:, RME Consulting Engineers
TEXAS FIRM REGISTRATION No F-4695
fws.. POST OFFICE BOX 9253
iCod a l6�iii�r e, i�e�s COLLEGE STATION, TEXAS 77842
OFF/FAX: (979) 764 -0704
r N E -mail: civil @rmengineer.com
Estimates and projections prepared by RME Consulting Engineers relating to construction costs and
schedules, operation and maintenance costs, equipment characteristics and performance, and operating
results are based on this office's experience, qualifications and judgment as a design professional. Since
RME has no control over weather, cost and availability of labor, material and equipment, labor
productivity, construction contractor's procedures and methods, unavoidable delays, construction
contractor's methods of determining prices, economic conditions, competitive bidding or market
conditions and other factors affecting such estimates or projections, this office does not guarantee that
actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by
the Engineer of record.
C D 1- 220 - 0446 -E02 1 of 1
Page l of l
• r
Brittany Caldwell - University Oaks Section 2 Replat: 11 -194
From: Josh Norton
To: Caldwell, Brittany
Date: 3/7/2012 9:47 AM
Subject: University Oaks Section 2 Replat: 11 -194
CC: Cotter, Carol; George, Bridgette; Gibbs, Alan
Please refund the sidewalk cash surety we are holding for this project. The applicant has provided us with a
new cash surety (check) to include additional linear footage of sidewalk.
Thanks - Josh
Joshua D. Norton, P.E., CFM
Assistant City Engineer
Planning & Development Services
City of College Station d (in V P. 0. Box 9960 L i �j NQVI tt k12...
College Station, Texas 77842 31 Ph: (979) 764 -3570 I 1 �l
Fx: (979) 764 -3496
City of College Station
Nome of Texas A &M University
PC o uuSc d 1V c1J Cktdij
CITY CF COLLEGE STATION
44* CUSTOMER RECEIPT *44
&per: RXRAUSE Type: CT Drayer: 1
Date: 3/07/12 98 Receipt no: 181689
Description Quantity Amount
2011 500194
PL PLANNING AND ZONING
1.00 $10374.53
BOND - SIDEWALK IMPROVEMENTS
UNIVERSITY OAKS SEC 2
LOTS 14,15,16,20,24
CK 12994
RAH
Tender detail
CK PERSONAL 12994 $10374.53
Total tendered $10374.53
Total payment $10374.53
Trans date: 3/07/12 Time: 10:05:48
THANK YOU
file: / /C: \Documents and Settings \bcaldwell \Local Settings \Temp \XPgrpwise \4F572ECECit... 3/7/2012