HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY RETAIL CENTER (SP) — 04- 00500022
FYI: This is a Stop Review due to additional information that is required: This
does not constitute a full site plan review.
PLANNING
)1. Provide a general note that all roof and ground- mounted mechanical equipment
shall be screened from view or isolated so as not to be visible from any public right -
of -way or residential district within 150' of the subject lot, measured from a point five
feet above grade. Such screening shall be coordinated with the building architecture
and scale to maintain a unified appearance.
j 1. Per Site Plan check list: Scale should be largest standard engineering scale
possible on sheet (please provide site, landscaping & striping on one 24x36 sheet
and the existing site on a sheet of its own. Key map does not need to be very large)
. Per Section 7.5.0 - A phase line is required 20 -ft. beyond any new amenity.
A. Parking spaces are required to be 9x18 with a two foot overhang, or 9x20 (the
current proposal shows w /wheel stops to only be 16 feet) If you would just extend
the lines to your fire lane the parking spaces will meet the 9x18 parking space
requirement with the two foot overhang. The wheel stops will have to remain due to
the side walk only being (4) foot in width.
Please provide in the parking legend: what parking is provided and what parking
j. requirement you used to get your requirement.
To get approval of Phase 2, the type of use will need to be provided. Please be
aware that even though this is divided up into two phases, the shopping center
definition still stands. This development is being considered as one building plot (ie:
three or more retail or restaurant uses; as previously discussed in the 8/11/03 pre -
application meeting) -
j7. Per section 7.2.D of the Unified Development Ordinance (UDO): A raised island,
7 � encompassing not less than 180 square feet in area, shall be located at both ends
of every parking row, regardless of the length of the row. The end island east as you
enter this site from the south entrance does not meet this area requirement. Please
adjust.
The eleven (11) proposed parking spaces adjacent to the Phase 2 building, are
shown as 18 -foot in length, however, the side walk is only (4) foot in width. (Please
refer to comment #4)
9. Please show all setbacks on the site plan (front being University drive).
10. The existing fire hydrant needs to be shown on the site plan to make sure it will
meet the distance requirements. (One of the reason for comment #2)
11. Will the building be sprinkled?
12. Signs are permitted separately. Please refer to Section 7.4 of the UDO.
13. The subject property is located in the (OV) Overlay District and all building /facade
materials must be reviewed and approved by staff prior to site plan approval for both
phases as it develops.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 4
14. This is not approval for Phase 2. Additional information will be needed for review and
approval of Phase 2.
LANDSCAPING /STREETSCAPING /BUFFER
15. Provide a general note that 100% coverage of groundcover, decorative paving,
decorative rock, or a perennial grass is required in parking lot islands, swales and
drainage areas, the parking lot setback, rights -of -way, and adjacent property
disturbed during construction.
16. The site area calculation for Phase 1 will need to be recalculated as the phase line
will be required to be adjusted to 20 feet out. (total area that is located within Phase
1 will need to be included in the calculation) Please adjust landscape legend
accordingly.
17. Please provide species of plantings as well as different symbols for the proposed
plantings. (See Sample Legend in Section 7.5.E in the UDO)
18. FYI: to receive 10- points for the proposed shrubs, they are required to be 5- gallon.
19. Please provide a note on the landscape plan that an approved irrigation plan is
required prior to C.O.
20. All plantings must be irrigated.
Reviewed by: Jennifer Reeves Date: 02 -02 -04
ENGINEERING
1. Provide water and 2. Show domestic and irrigation meter locations.
3. Show sizes of public and private water, sanitary and storm sewer services.
4. Provide detail showing how you will be tying into the public storm sewer inlet.
5. Curbing needs to be monolithic.
6. All paved areas are required to be surrounded by 6" curb. It appears that areas
adjacent to Phase 2 are not showing any curbing.
7. Sidewalks shall be #3 bars @ 12" OCEW.
8. Provide drainage report/letter to show that you are not impacting neighboring
properties and that you are meeting City Drainage Policy.
9. The drainage to the southern access drive will need to be tied in to the existing
storm sewer instead of discharged off -site.
Provide erosion control plan.
11. Show floodplain limits.
Reviewed by: Carol Cotter Date: February 3, 2004
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 3 of 4
CITY OF COLLEGE STATION
‘j DEVELOPMENT SERVICES
1 101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone 979764.3570 / Fax 979.764.3496
MEMORANDUM
February 6, 2004
TO: Todd Carnes, TC Homes, Via fax 693.7839
FROM: Bridgette George, Assistant Development Manager
SUBJECT: GATEWAY RETAIL CENTER (SP) - Site Plan
Staff reviewed the above - mentioned site plan as requested but had to stop review due
to an incomplete submittal. The following page is a preliminary list of staff review
comments detailing items that need to be addressed. Please address the comments
and submit the following information by any Monday at 10:00 a.m. for further staff
review:
One (1) complete set of construction documents for the proposed
development with the revised site and landscaping plans attached
Easement Dedication Sheet and required documents.
Please note that the Easement Dedication Sheet and the necessary documents are
required prior to the issuance of a building permit. If there are comments that you are
not addressing with the revised site plan, please attach a letter explaining the details. If
you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
Easement Dedication Sheet
cc: Baker & Carnes Investments, LLC, Via 693.7839 ✓
RAI Design, Via fax 693.5400 ✓
Case file #04- 00500022
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 1 of 4
STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY RETAIL CENTER (SP) — 04- 00500022
FYI: This is a Stop Review due to additional information that is required: This
does not constitute a full site plan review.
PLANNING
1. Provide a general note that all roof and ground- mounted mechanical equipment
shall be screened from view or isolated so as not to be visible from any public right -
of -way or residential district within 150' of the subject lot, measured from a point five
feet above grade. Such screening shall be coordinated with the building architecture
and scale to maintain a unified appearance.
2. Per Site Plan check list: Scale should be largest standard engineering scale
possible on sheet (please provide site, landscaping & striping on one 24x36 sheet
and the existing site on a sheet of its own. Key map does not need to be very large)
3. Per Section 7.5.0 - A phase line is required 20 -ft. beyond any new amenity.
4. Parking spaces are required to be 9x18 with a two foot overhang, or 9x20 (the
current proposal shows w /wheel stops to only be 16 feet) If you would just extend
the lines to your fire lane the parking spaces will meet the 9x18 parking space
requirement with the two foot overhang. The wheel stops will have to remain due to
the side walk only being (4) foot in width.
5. Please provide in the parking legend: what parking is provided and what parking
requirement you used to get your requirement.
6. To get approval of Phase 2, the type of use will need to be provided. Please be
aware that even though this is divided up into two phases, the shopping center
definition still stands. This development is being considered as one building plot (ie:
three or more retail or restaurant uses; as previously discussed in the 8/11/03 pre -
application meeting)
7. Per section 7.2.D of the Unified Development Ordinance (UDO): A raised island,
encompassing not less than 180 square feet in area, shall be located at both ends
of every parking row, regardless of the length of the row. The end island east as you
enter this site from the south entrance does not meet this area requirement. Please
adjust.
8. The eleven (11) proposed parking spaces adjacent to the Phase 2 building, are
shown as 18 -foot in length, however, the side walk is only (4) foot in width. (Please
refer to comment #4)
9. Please show all setbacks on the site plan (front being University drive).
10. The existing fire hydrant needs to be shown on the site plan to make sure it will
meet the distance requirements. (One of the reason for comment #2)
11. Will the building be sprinkled?
12. Signs are permitted separately. Please refer to Section 7.4 of the UDO.
13. The subject property is located in the (OV) Overlay District and all building /facade
materials must be reviewed and approved by staff prior to site plan approval for both
phases as it develops.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 4
•
14. This is not approval for Phase 2. Additional information will be needed for review and
approval of Phase 2.
LANDSCAPING /STREETSCAPING /BUFFER
15. Provide a general note that 100% coverage of groundcover, decorative paving,
decorative rock, or a perennial grass is required in parking lot islands, swales and
drainage areas, the parking lot setback, rights -of -way, and adjacent property
disturbed during construction.
16. The site area calculation for Phase 1 will need to be recalculated as the phase line
will be required to be adjusted to 20 feet out. (total area that is located within Phase
1 will need to be included in the calculation) Please adjust landscape legend
accordingly.
17. Please provide species of plantings as well as different symbols for the proposed
plantings. (See Sample Legend in Section 7.5.E in the UDO)
18. FYI: to receive 10- points for the proposed shrubs, they are required to be 5- gallon.
19. Please provide a note on the landscape plan that an approved irrigation plan is
required prior to C.O.
20. All plantings must be irrigated.
Reviewed by: Jennifer Reeves Date: 02 -02 -04
ENGINEERING
1. Provide water and sewer demands.
2. Show domestic and irrigation meter locations.
3. Show sizes of public and private water, sanitary and storm sewer services.
4. Provide detail showing how you will be tying into the public storm sewer inlet.
5. Curbing needs to be monolithic.
6. All paved areas are required to be surrounded by 6" curb. It appears that areas
adjacent to Phase 2 are not showing any curbing.
7. Sidewalks shall be #3 bars @ 12" OCEW.
8. Provide drainage report/letter to show that you are not impacting neighboring
properties and that you are meeting City Drainage Policy.
9. The drainage to the southern access drive will need to be tied in to the existing
storm sewer instead of discharged off -site.
10. Provide erosion control plan.
11. Show floodplain limits.
Reviewed by: Carol Cotter Date: February 3, 2004
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 3 of 4
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2002 version of plat and /or site plan.
email to rbolin(cc�cstx.com
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date: 2 -3 -04
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a
Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow
Device, and installed as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 4 of 4
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
March 18, 2004
TO: Todd Carnes, T.C. Homes, Via fax 693 -78
FROM: Natalie Thomas Ruiz, Development Man A
SUBJECT: GATEWAY RETAIL CENTER (SP) - Site Plan
Staff reviewed the above - mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review:
$200 processing fee for the next round of three (3) staff reviews;
Two (2) copies of building elevations including material and color samples
for the proposed building; and,
Six (6) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached;
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764 -3570.
Attachments: Staff review comments
cc: RAI Design, Via fax 693 -5400
Case file #04- 00500022
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 3
Project: GATEWAY RETAIL CENTER (SP) - 04- 00500022
PLANNING
1. FYI: This is not Site Plan approval for phase 11.
2. Please be aware that this building site is located in the Overlay District. Material
samples, colors and building elevations are required to be reviewed and approved
prior to final site plan approval. (See Section 5.8 Overlay District)
3. Signs are permitted separately. (Please see Section 5.8.A.2 Signs)
Reviewed by: Jennifer Reeves Date: 03 -16 -04
ENGINEERING
1. Provide water and sewer demands as previously requested.
2. Regarding the water meter manifold: It would appear that 2 double services would
work. Otherwise, please show that the 2" line will support the demand for the 4
meters.
3. How will you be handling erosion caused by the concentrated runoff from the
parking lots to the storm inlet? You will need concrete pilot channels, rip rap, or
some other method of permanent erosion control.
Reviewed by: Carol Cotter Date: 03 -16 -04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 2
Ckff "41"
CITY OF COLLEGE STATION
Planning d Deuelopmeat Services
1101 Texas Avenue, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
February 16, 2009
TO: James Lloyd, Gateway Crossing, via fax 586 - 261 -0855
FROM: Jason Schubert, AICP, Staff Planner
SUBJECT: GATEWAY RETAIL CENTER — PARKING REQUIREMENTS
As requested, this memo is to describe the current parking requirements for the property
located at 1721 University Drive East (Lot 2RA, Block 1 of The Gateway #1 subdivision).
You have been previously copied on a letter dated November 13, 2006 that was issued
by Grant Wencel regarding parking requirements and the calculation of "intense uses"
for shopping centers. Intense uses are those uses that have a greater parking
requirement than that of a shopping center (1 space : 250 gross square feet ratio). Once
a shopping center consists of more than 25% of intense uses, the area above that
percentage requires additional parking at the ratio of the type of use proposed. The
general parking requirements and ratios can be found in the Unified Development
Ordinance (UDO) Section 7.2.1 Number of Off - Street Parking Spaces Required.
Based on the nature of the existing uses on this property, Winestyles is classified as a
night club at a 1:50 ratio and Lazersmooth is a Medical Clinic at a 1:200 ratio.
Winestyles was the first intense use and has 1,977 interior square feet and 153 square
feet of outdoor patio and Lazersmooth consists of 1,977 square feet. The building totals
7,510 interior square feet and when the outdoor patio area is included, it totals 7,663
square feet. As stated in the previous letter, based on these figures 46 parking spaces
are required. The property has a joint parking agreement with the neighboring property
(Lot 2RC) which has recently developed as a car wash facility. With its associated office
and storage area, the car wash requires 6 parking spaces. Between the two properties,
52 parking spaces have been provided, thus fulfilling the 46 spaces required for this
property and the 6 spaces for Lot 2RC as currently developed.
It is my understanding that you would like to verify that Winestyles can be replaced with
a restaurant without a drive - through and meet City parking requirements. 1 can confirm
this fact for you. If Winestyles and its patio were removed, a restaurant without a drive -
through could have as much as 2,203 square feet. If the patio were retained, the
restaurant could have an interior area of 2. ,088 square feet plus the patio. These
calculations assume that Lazersmooth remains and that the remaining area consists of
non - intense use(s). I hope this information is helpful to you, let me know if you have any
questions.
pc: Case file #04- 00500022
Home of Texas A &M University
RESPONSES TO STAFF REVIEW COMMENTS NO.2
"Gateway" Retail Center
College Station, Texas
Case File #04- 00500022
These comments addressed by John Rhodes of R.A.I..
March 3, 2004
RESPONSES TO STAFF REVIEW COMMENTS NO.2
PLANNING
1. The parking space details themselves were dimensioned on sheet S -5. I added a
typical dimension on sheet S -4.
2. Sheet S -3 and S -4 were labeled at 1:30 and actually were at 1:20. They have now
been changed. The request for changing scale of sheet S -5 seems to be a personal
preference and not a requirement. Engineering scales are to read 1:10, 1:20, etc.
by changing to these no details would be legible.
3. Island is altered had to remove one parking space and added it back on adjacent
side.
4. Crepe myrtle note is changed to read 1.25 cal.
5. Will choose different species and add it to landscaping.
6. You receive the number 47 when you multiply numbers out and round them
separately. Why would you calculate one building with two classifications
separately? Need to discuss this item.
7. In the original pre- development meeting we had with the city the traffic engineer
stated that there was no problem with us having those 7 spaces with off street
parking. Due to our many lot restraints and the current chaotic use of the existing
space. This is a rather major item and was nowhere noted on the previous
comments. No changes were made for this. We have several items to discuss on
this.
8. There was nothing for us to change on this.
ENGINEERING
1. Water meters were located in the 7.5' side building setback on sheet S -2 for the
previous submittal made. ra c.e.A- o b`' k.0 r �, •
2. Knock -off curb details are now added to sheet S -5. y
3. Water and sewer demand sizes were located on sheet S -2 for the previous ' � � , � s`
submittal made.
4. Need to provide sheet to you.
5. Since the original submittal we have reworked the entire site drainage in order to
have the majority of all runoff to drain to the main inlet located on our site (per
your request on first comments). The sloped areas noted on the plan around the
dumpster are ramps simply for access to the dumpsters with carts and also meet
the handicap accessible requirements located in that area. There were 2 grades
that were not altered due to our rush for re- submittal. They have now been
changed.
6. The original plat does not have a finished floor elevation requirement on it. All
the existing grades in this area were altered prior to our start on our project.
There is no area on our lots that remain in the flood plain.
7. Oversight on my part. Changes have been made.
8. If you read detail 07 on sheet S -5 it clearly shows that all driveway pavement is
6" and parking is 5 ". This was on previous submittals.
or , 4 A , 1 :.---,Kak- (1 CA_I
\ ' 0 ,ait ---'6\1 ,f(25tc4D(OL/Uk--.-----. 0
RESPONSES TO STAFF REVIEW COMMENTS NO.2
"Gateway" Retail Center
College Station, Texas
Case File #04- 00500022
These comments addressed by John Rhodes of R.A.I..
March 3, 2004
# 1,/ 1) C .
,..3 k?-
1 J\ 1\ !A 4- ? A c ��
S PONSES TO STAFF REVIEW COMMENTS NO.2
PLANNING
1 1. The parking space details themselves were dimensioned on sheet S -5. I added a
typical dimension on sheet S -4. 0 N i; f I_ f¢ I k n
,12. Sheet S -3 and S -4 were labeled at 1:30 and actually were at 1:20. They have now
been changed. The request for c anging scale of sheet S -5 seems to be a personal
preference and not a requirement. ngineering scales are to read 1:10, 1:21, etc.
by changing to these no details would be legible.
3. Island is altered had to remove one parking space and added it back on adjacent
side.
14. Crepe myrtle note is changed to read 1.25 cal.
J5. Will choose different species and add it to landscaping.
6. s. . . ■ / 1 • ;.- . G . em
. ar, .�. . . - -. .. - i .1 _ ••. '- . . .. . . ions
_senarately - , , • • • - • .
. I. • - I II I • e = , - es - " ee ml we had with he city ity the traffic engineer
s -. - • _• . - - « .f. no pro e em with us havin those 7 spaces with off street
par ' rest raints and the cent chaotic use of the existing
7 s p . - - • ' ' - : . - major item and was, nawh ere nea te1 4he-previeua._
: .: - : -mss:- -We have several ite TISIer iiscttss on
this.
j
8. _ . - - ., • • .
ENGINEERING
1. Water meters were located in the 7.5' side building setback on sheet S -2 for the
previous submittal made.
2. Knock -off curb details are now added to sheet S -5.
3. Water and sewer demand sizes were located on sheet S -2 for the previous
submittal made.
4. Need to provide sheet to you.
5. Since the original submittal we have reworked the entire site drainage in order to
have the majority of all runoff to drain to the main inlet located on our site (per
your request on first comments). The sloped areas noted on the plan around the
dumpster are ramps simply for access to the dumpsters with carts and also meet
the handicap accessible requirements located in that area. There were 2 grades
that were not altered due to our rush for re- submittal. They have now been
changed.
6. The original plat does not have a finished floor elevation requirement on it. All
the existing grades in this area were altered prior to our start on our project.
There is no area on our lots that remain in the flood plain.
7. Oversight on my part. Changes have been made.
8. If you read detail 07 on sheet S -5 it clearly shows that all driveway pavement is
6" and parking is 5 ". This was on previous submittals.