HomeMy WebLinkAboutDrainage Report 3,\
o L k -93-
Drainage Report
for
Gateway Retail Center
College Station, Texas
February 2004
Revised March 2004
Developer:
Todd Carnes
College Station, Texas
(979) 693 -7835
Prepared By:
TEXCON General Contractors
1707 Graham Road
College Station, Texas 77845
(979) 764 -7743
CERTIFICATION
I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report
for the drainage design for the Gateway Retail Center in College Station, Texas, was prepared by me in
accordance with the provisions of the City of College Station Drainage Policy and Design Standards
for the owners hereof, with the exception that storm water runoff detention is not being required at this
site since the site discharges directly into a storm sewer system which discharges into the existing
detention facility for the entire Gateway Development.
�i P�� 9
S
. • • s #
• ▪ *
JOSEPH P. SCHULTZ d
r-33'. 65889 Q ` Joseph 1 / . c ltz, P.E.
,OT '4FG/S •
14 .k �. , 1
TE ••
7.rS -o 4-
TABLE OF CONTENTS
GATEWAY RETAIL CENTER
CERTIFICATION 1
TABLE OF CONTENTS 2
LIST OF TABLES 2
INTRODUCTION 3
GENERAL LOCATION AND DESCRIPTION 3
DEVELOPMENT DRAINAGE PATTERNS 3
DRAINAGE DESIGN CRITERIA 3
STORM WATER RUNOFF DETERMINATION 4
STORM SEWER PIPE & INLET DESIGN 4
DETENTION FACILITY 5
CONCLUSIONS 5
APPENDIX A 6
Calculations
EXHIBIT 11
Sheet S3 — Drainage and Grading Plan
LIST OF TABLES
TABLE 1 — Rainfall Intensity & Runoff Data 4
TABLE 2 — Runoff Data 4
DRAINAGE REPORT
GATEWAY RETAIL CENTER
INTRODUCTION
The purpose of this report is to provide the hydrological effects of the construction of the
infrastructure for the Gateway Retail Center project, and to show that the storm water runoff
will be controlled in such a manner so as to have minimal offsite or downstream impact.
GENERAL LOCATION AND DESCRIPTION
The project is located on approximately 1.5 acres located in the Gateway Development in
College Station, Texas. The site is a portion of Block 1, Lot 2R of the Phase 1 of the Gateway
Subdivision. The project will be developed in 2 phases with approximately 0.8 acres being
developed in Phase 1. This site has previously been developed with the clearing and grading
completed with the Home Depot project. In addition, the site has previously constructed
driveways on all four sides, some of which are on this tract. The site falls approximately 6' in
elevation from the west side to east side of the site.
DEVELOPMENT DRAINAGE PATTERNS
The storm water runoff from the site flows into an existing storm sewer inlet at the north corner
of the site. The post development drainage area boundary for both phases is shown on Sheet
S3, the Drainage and Grading Plan. The grading plan is based on elevations relative to the site
with the existing grate inlet top assumed to be Elevation 95.3, as shown on the plans. This inlet
is located near the existing driveway east of the site. The existing storm sewer inlet was
constructed with the Home Depot development located to the north of this site. The
Drainage/Detention Report for the Home Depot development was prepared in August 2002 by
Bury + Partners — SA, Inc. A review of this report shows that this site is part of Drainage Area
7, which had an area of 2.5 acres, a "c" value of 0.85, and a time of concentration, Tc, value of
10 minutes. This area included a portion of Lot 2R to the east of this site, which is being
developed separately and will have its own storm sewer system.
DRAINAGE DESIGN CRITERIA
The design parameters for the storm sewer are as follows:
• The Rational Method is utilized to determine peak storm water runoff rates for the
storm sewer design.
• Design Storm Frequency
Storm sewer system 10 and 100 -year storms events
• Runoff Coefficients
Landscape areas C = 0.60
Impervious surfaces C = 0.90
• Rainfall Intensity equations and values for Brazos County can be found in Table 1.
• Time of Concentration, t, — For smaller drainage areas, a minimum t of 10 minutes is
used to determine the rainfall intensity values.
TABLE 1 - Rainfall Intensity & Runoff Data
Rainfall Intensity Values
(in /hr)
Storm t = I = b / (tc +d)
Event 10 min 1 = Rainfall Intensity (in /hr)
1 7.693
110 8.635 t = U(V *60)
125 9.861 t = Time of concentration (min)
1 11.148 L = Length (ft)
1100 11.639 V = Velocity (ft/sec)
Brazos
County:
5 year storm 10 year storm 25 year storm 50 year storm 100 year storm
b = 76 b = 80 b = 89 b = 98 b = 96
d = 8.5 d = 8.5 d = 8.5 d = 8.5 d = 8.0
e = 0.785 e = 0.763 e = 0.754 e = 0.745 e = 0.730
(Data taken from State Department of Highways and Public Transportation Hydraulic Manual, page 2 -16)
STORM WATER RUNOFF DETERMINATION
The peak runoff values were determined in accordance with the criteria presented in the
previous section for the 10- and 100 -year storm events. The runoff coefficients are based
on the development of both phases of this site. The drainage area is shown on Sheet S3,
The Drainage and Grading Plan. Runoff conditions are summarized in Table 2.
TABLE 2 — Runoff Data
Area No Area Size Composite 1 Q10 1 100 Q100
(acres) C (in /hr) (cfs) (in /hr) (cfs)
1 1.18 0.85 8.64 8.67 11.64 11.67
STORM SEWER PIPE & INLET DESIGN
The existing private storm sewer will collect the runoff from both phases of this project. A
small portion of the project site will drain directly into the existing driveway along the
northern boundary of the site. This runoff will eventually enter the public storm sewer
system through the existing inlets located in the existing driveways.
The grate for the existing storm sewer inlet is a 36" x 36" V -5736 grate manufactured by
East Jordan Iron Works. The open area for the grate is 693 square inches, or 4.81 square
feet (sf). Assuming the grate is 50% clogged, the available open area is 2.4 sf.
The depth of water above the grate is determined by the orifice equation:
Q = 4.82* A * y1 /2
4
Therefore, for the 10- and 100 -year storm events the following depths are calculated:
Qio = 8.67 cfs -' y = 0.56' = 6.74"
Qioo = 11.67 cfs - y = 1.02' = 12.2"
The top of the grate is proposed to be at elevation 95.3, and the top of the berm around the
inlet will be constructed to elevation 97.0. There will be 8" of freeboard during the 100 -
year storm event.
The existing 30" diameter storm sewer pipe can adequately carry the runoff. The velocity
in this pipe will be 6.3 fps and 6.8 fps for the 10 -year and 100 -year storm events,
respectively.
DETENTION FACILITY
No storm water detention is required for this site because the existing private and public
storm sewer systems and the Home Depot detention pond were designed for the full
development of the entire Gateway Subdivision development. The design of the facilities
is provided in the aforementioned Drainage/Detention Report prepared by Bury + Partners.
CONCLUSIONS
The construction of this project will increase the storm water runoff from this site.
However, the runoff will be carried through the proposed and existing storm sewer system
and into the existing detention pond. No flood damage to downstream or adjacent
landowners is expected as a result of this development.
APPENDIX A
Calculations
6
10- year.txt
Manning Pipe Calculator
Given Input Data:
Shape Circular
Solving for Depth of Flow
Diameter 30.0000 in
Flowrate 8.6700 cfs
Slope 0.0100 ft /ft
Manning's n 0.0140
Computed Results:
Depth 9.7322 in
Area 4.9087 ft2
wetted Area 1.3799 ft2
wetted Perimeter 36.3587 in
Perimeter 94.2478 in
velocity 6.2831 fps
Hydraulic Radius 5.4652 in
Percent Full 32.4406 %
Full flow Flowrate 38.0873'cfs
Full flow velocity 7.7591 fps
Page 1
100 - year.txt
Manning Pipe Calculator
Given Input Data:
Shape Circular
Solving for Depth of Flow
Diameter 30.0000 in
Flowrate 11.6700 cfs
Slope 0.0100 ft /ft
Manning's n 0.0140
Computed Results:
Depth 11.3955 in
Area 4.9087 ft2
Wetted Area 1.7107 ft2
wetted Perimeter 39.8436 in
Perimeter 94.2478 in
velocity 6.8217 fps
Hydraulic Radius 6.1828 in
Percent Full 37.9850 %
Full flow Flowrate 38.0873'cfs
Full flow velocity 7.7591 fps
Page ]
EXHIBIT
Sheet S3 — Drainage and Grading Plan