HomeMy WebLinkAboutStaff Comments 1
CITY OF COLLEGE STATION
CA DEVELOPMENT SERVICES
1 101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
October 17, 2002
TO: James H. Woods, Via fax 846 -9133
FROM: Bridgette George, Assistant Development Manager
SUBJECT: EDELWEISS BUS CTR LOTS 5,6 BLK 2 (FP) - Final Plat
Staff reviewed the above - mentioned final plat as requested but had to stop review due
to an incomplete submittal. The following page is a preliminary list of staff review
comments detailing items that need to be addressed. Please submit the following
information by an established deadline to be scheduled for a future Planning & Zoning
Commission meeting:
Two (2) copies of the revised final plat.
If you have any questions or need additional information, please call Carol Cotter or
myself at 764 -3570.
Attachments: Staff review comments
cc: Southwood West, Via fax 846 -9378
Michael McClure, McClure Engineering Inc., Via fax 693 -2554
Case file #02- 00500229
Home of Texas A85M University
STAFF REVIEW COMMENTS NO. 1
Project: EDELWEISS BUS CTR LOTS 5,6 BLK 2 (FP) - 02- 00500229
THIS IS A STOP REVIEW. THIS REVIEW DOES NOT CONSTITUTE A COMPLETE
REVIEW.
ENGINEERING
1. The property does not have sewer service. Extension of the public sewer system to
and through the property is required. Provide construction documents as part of
Final Plat application.
2. 25 -foot landscape buffer is required along boundary of property with residential
property (part of Lot 6). Please indicate on Plat.
3. Property is in Impact Fee Area 92 -01. Impact fees are due at time of building permit.
Reviewed by: CAROL COTTER Date: October 16, 2002
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(putl boxes
provided by the city.
5. Developer provides digital AutoCAD 14 version of plat and /or site plan.
email to rbolin(a ci.college- station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date:
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 2