MEMORANDUM
October 18, 2002
TO: Louise Fischer, Kerr Surveying, Via fax 691 -8904
FROM: Bridgette George, Assistant Development Manager
SUBJECT: SIMMONS ADDITION (FP) - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Monday, November 4,
10:00 a.m., your project will be placed on the next available Planning and Zoning
Commission meeting scheduled for Thursday, November 14, 2002, 6:00 p.m. in the City
Hall Council Chambers, 1101 Texas Avenue.
$556 Parkland Dedication Fee;
Ten (10) copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart @ci.college - station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will be pulled from the scheduled
Planning & Zoning Commission Agenda. Your project may be placed on a future
agenda once all the revisions have been made and the appropriate fees paid. If you
have any questions or need additional information, please call Spencer Thompson or
myself at 764 -3570.
Attachments: Staff review comments
cc: Joyce Dell Simmons, 1601 Valley View #1901, College Station, TX 77840
Case file #02- 00500214
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: SIMMONS ADDITION (FP) - 02- 00500214
ENGINEERING
1. The 50' setback shown on the plat is correct, however, we prefer not to show this on
final plats, as this is regulated by zoning ordinance. Should the property zoning
change, the setback requirement would change as well.
2. Please be advised that there is a parkland fee associated with the platting of this
property, see Subdivision Regulations Section 10. The Development Services
Department has waived some of its requirements and fees associated with platting
to assist this property owner. This department has no ability to waive any other
associated fees.
Reviewed by: Spencer Thompson Date: October 18, 2002
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 14 version of plat and /or site plan.
email to rbolin(a ci.college- station.tx.us
6. Developer provides Toad data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.