Loading...
HomeMy WebLinkAboutSTAFF REVIEW COMMENTS CITY OF COLLEGE STATION `I DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 11, 2003 TO: Veronica J. B. Morgan, Mitchell & Morgan, LLP, Via fax 979.260.3564 FROM: Bridgette George, Assistant Development Manager SUBJECT: GATEWAY L2R (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 6, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, October 16, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. $100 Final Plat fee ($300 already submitted); Two (2) copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college- station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 979.764.3570. Attachments: Staff review comments cc: Drew Congleton, Via fax 936.597.8356 CSI & Associates, 8377 Beach Road Ste. 106, Huntington Beach, CA, 92648 Clayton & Jana Rhoades, 800 Earl Rudder Frwy., College Station, TX, 77840 Case file #03- 00500223 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: GATEWAY L2R (FP) - 03- 00500223 ENGINEERING 1. The floodplain currently recognized by FEMA has not been removed from the platted lot. Please continue to show the legal floodplain delineation until the revision has been formalized by FEMA. 2. One of the requirements for a minor plat is the number of lots involved; four or fewer. It appears that this plat does not meet the state statute requirement and will need to be approved by the Planning and Zoning Commission. Reviewed by: Spencer Thompson Date: September 11, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2000i version of plat and /or site plan. email to rbolin @cstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. 9. Developer provides additional 10' PUE across lot 2RB to lot 2RC. Reviewed by: Ronnie Bolin Date: 9 -11 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 STAFF REVIEW COMMENTS NO. 2 Project: GATEWAY LOTS 2RA -2RE (FP) - 03- 00500223 ENGINEERING 1. The floodplain is shown correctly. However, the note reads that the floodplain shown is according to the CLOMR. The floodplain shown is depicted from the FIRM. It is my understanding that when FEMA issues the CLOMR this property will not be in the floodplain. Please amend note accordingly. Reviewed by: Spencer Thompson Date: October 9, 2003