Loading...
HomeMy WebLinkAboutOversize Participation Phillips Engineering Providing Civil Engineering Services to College Station and Surrounding Communities 4490 Castlegate Drive, College Station, Texas 77845 (979) 690 -3141 March 1, 2011 Josh Norton Development Services City of College Station P.O. Box 9960 College Station, Texas 77842 RE: OVERSIZE PARTICIPATION REQUEST CASTLEGATE II SUBDIVISION, SECTION 200 COLLEGE STATION, TEXAS Dear Josh: With this letter I wish to initiate a request for Oversize Participation by the City of College Station for the 12" water line being installed with Section 200 of Castlegate II. This water line was designed to comply with the City's Water Masterplan which calls for a 12" line to parallel WS Phillips Parkway through the subdivision. The construction plans for the water system are included with this submittal for your review. They show a total of approximately 2113 feet of 12" line running along WS Phillips and Toddington. In the accompanying Water System Report, you will see that we have modeled the water system in the subdivision using 4 ", 6" and 8" lines. The model demonstrates that the system performs above minimum standards using these line sizes. We conclude that anything larger than an 8" line can be considered oversized. Also included with this submittal is an estimated cost of the water systems using 12" lines and another using 8" lines instead. The difference in cost between the two line sizes and the related fittings is $23,863. I believe this is a conservative number and that actual construction costs should not exceed that figure. I also estimate a cost of 3% of that figure for the performance and payment bonds which comes to $5,867. The total Oversize Participation request is for $29,730. This figure is approximately 15% of the overall water system cost and is well below the threshold limit of 30% where competitive bidding becomes a requirement. I ask that you review these accompanying documents and forward them to other staff members involved in the Oversize Participation process. Please let me know what subsequent steps we ned to take to move forward with this request. Thank you. Sincerel , /- Kent Laza, P.E. a Manager Phillips Engineering attachments r CASTLEGATE II SUBDIVISION, SECTION 200 ENGINEER'S ESTIMATE OF OVERSIZE PARTICIPATION COSTS March 1, 2011 Item Description Est. Unit Unit Price Total No. Quantity Water System w /12" lines 1 12" Water PVC CL200 (C900), CL200 Structural Backfill 659 LF 33.00 21,747 2 12" Water PVC CL200 (C900), CL200 Non - Structural Backfill 1,454 LF 29.00 42,166 3 8" Water PVC CL200 (C900), CL200, Structural Backfill 309 LF 24.00 7,416 4 8" Water PVC CL200 (C900), CL200 Non - Structural Backfill 1,038 LF 21.00 21,798 5 6" Water PVC CL200 (C900), CL200, Structural Backfill 45 LF 21.00 945 6 6" Water PVC CL200 (C900), CL200 Non - Structural Backfill 862 LF 18.00 15,516 7 20" Steel Casing Pipe, w /casing spacers and end caps 70 LF 90.00 6,300 8 14" Steel Casing Pipe, w /casing spacers and end caps 110 LF 75.00 8,250 9 Fire Hydrant Assembly (incl. 12 "x6" tee, valve, bend & hydrant) 2 EA 3,500.00 7,000 10 Fire Hydrant Assembly (incl. 6 "x6" tee, valve, bend & hydrant) 1 EA 3,300.00 3,300 11 Connect to existing water line 2 EA 500.00 1,000 12 12" X 12" M.J. Cross 1 EA 750.00 750 13 12" X 8" M.J. Cross 1 EA 600.00 600 14 8" X 6" M.J. Cross 1 EA 500.00 500 15 12" X 12" Tee 1 EA 600.00 600 16 8" X 8" Tee 1 EA 400.00 400 17 12" M.J. Gate Valve 3 EA 1,800.00 5,400 18 8" M.J. Gate Valve 6 EA 1,200.00 7,200 19 6" M.J. Gate Valve 3 EA 850.00 2,550 20 12" X 45° M.J. Bend 6 EA 400.00 2,400 21 8" X 45° M.J. Bend 7 EA 300.00 2,100 22 8" X 22.5° M.J. Bend 2 EA 300.00 600 23 12 "x 8" M.J. Reducer 2 EA 300.00 600 24 8 "x 6" M.J. Reducer 1 EA 225.00 225 25 4" Blowoff Valve 3 EA 2,200.00 6,600 26 2" Blowoff Valve 3 EA 1,500.00 4,500 27 1" Water Service, < 15 ft (avg length = 3 ft) 2 EA 600.00 1,200 28 1" Water Service, > 15 ft (avg length = 47 ft) 5 EA 1,100.00 5,500 29 1.5" Water Service, < 15 ft (avg length = 3 ft) 11 EA 650.00 7,150 30 1.5" Water Service, > 15 ft (avg length = 47 ft) 9 EA 1,250.00 11,250 Water System w/ 12" lines $195,563 Water System w /8" lines 1 8" Water PVC CL200 (C900), CL200, Structural Backfill 968 LF 24.00 23,232 2 8" Water PVC CL200 (C900), CL200 Non - Structural Backfill 2,492 LF 21.00 52,332 3 6" Water PVC CL200 (C900), CL200, Structural Backfill 45 LF 21.00 945 4 6" Water PVC CL200 (C900), CL200 Non - Structural Backfill 862 LF 18.00 15,516 5 14" Steel Casing Pipe, w /casing spacers and end caps 180 LF 75.00 13,500 6 Fire Hydrant Assembly (incl. 8 "x6" tee, valve, bend & hydrant) 2 EA 3,300.00 6,600 7 Fire Hydrant Assembly (incl. 6 "x6" tee, valve, bend & hydrant) 1 EA 3,300.00 3,300 8 Connect to existing water line 2 EA 500.00 1,000 9 8" X 8" M.J. Cross 2 EA 600.00 1,200 10 8" X 6" M.J. Cross 1 EA 500.00 500 11 8 "X8 "Tee 2 EA 41111 800 12 8" M.J. Gate Valve 9 EA 1,200.00 10,800 13 6" M.J. Gate Valve 3 EA 850.00 2,550 14 8" X 45° M.J. Bend 13 EA 300.00 3,900 15 8" X 22.5° M.J. Bend T � 2 EA 300.00 600 16 12 "x 8" M.J. Reducer ��a• ••�-'� 2 EA 300.00 600 17 8 "x 6" M.J. Reducer 0' • t 1 EA 225.00 225 18 2" Blowoff Valve 1 1. * 0 6 EA 1,500.00 9,000 ...Owl 1" Water Service, < 15 ft (avg length = 3 ft) .�� ' *i 2 EA 600.00 1,200 20 1" Water Service, > 15 ft (avg length = 47 ft) . .l......... 5 EA 1,100.00 5,500 21 1.5" Water Service, < 15 ft (avg length = 3 ft) 11 EA 650.00 7,150 22 1.5" Water Service, > 15 ft (avg length = 47 ft) - 9 EA 1,250.00 11,250 Sri ti ‘ • Water System w /8" lines $171,700 � `� ` " Oversize Participation Estimate $23,863 3 // ///