Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Water System Report
Water System Report for Castlegate II Subdivision, Section 200 College Station, Texas February 2011 (revised April 2011) Prepared By: Phillips Engineering 4490 Castlegate Drive College Station, Texas 77845 (979) 690 -3141 TPBE FIRM #13130 ••�....• ' *i M: "tom *: 43' AL Pr i' 8� Castlegate II Subdivision, Section 200 Water System Report General Information The Castlegate II Subdivision is a 202 -acre residential subdivision being developed immediately southwest of the existing Castlegate Subdivision in College Station. The recently approved Preliminary Plat shows a total of 629 lots in the whole development. The first phase will be Section 200, which is located adjacent to Castlegate Section 7 at the terminus of Victoria Avenue and will contain 47 lots. Since this is the first phase of a large development, an analysis was conducted on the entire water system to ensure its ability to serve all lots under fully developed conditions. This analysis was conducted with waterline sizes of 8" or less to demonstrate that larger size lines are not necessary even though they may be required by the City for future development in the area. A second analysis was conducted for Section 200 only to demonstrate that it can function as a stand -alone system. Revision Note: At the request of the City staff two additional analyzes were conducted using the 12" lines that are shown on the construction plans and included in the oversize request for Section 200. Computer models were changed to incorporate 12" lines as shown on the Preliminary Plat in both the fully developed conditions and in Section 200 by itself. Exhibits showing the results of those models have been added to this report. Design Criteria Primary Water Supply: Existing 8" line on Victoria Avenue and an 8" line that lies in an easement in Section 7 of Castlegate. Both lines will be used with the construction of Section 200 to provide looping in all future phases of the development. Domestic Demand: Avg. Pop Density: 2.67 people per lot Average Flow: 100 gpd /cap or 267 gpd per lot = 0.18 gpm per lot Peaking Factor: 4 Peak Flow: 0.74 gpm per lot Design Flow: 1.50 gpm per lot Fire Demand: Fire Flow: 1000 gpm at most hydraulically remote point Pipe: PVC DR -14 C900 Roughness Coeff 150 (Hazen Williams) Hydraulic Software: EPANet v.2.0 Existing City System Pressure Tests Flow Hydrant #: V -037 (Camber @ Victoria) Flowrate: 1430 gpm Static Hydrant #: V - 047 Static Pressure: 85 psi (196 ft water) Residual Pressure: 77 psi (178 ft water) Applicable Exhibits: Exhibit A — College Station Utilities Flow Test Report 1 Water System Summary of Entire System under Fully Developed Conditions In order to establish the most hydraulically remote point of the entire system, a model was run under peak flow conditions without fire flow added to the demand. The point with the lowest pressure is J107 -3, located in the lower left corner of Exhibit B. A fire demand of 1000 gpm was added at the nearest fire hydrant location, which is J107 -2. Results of that model are shown below. As Criteria Required Designed 1 Location Min. Pressure - fire (psi) 20 1 52.37 J107 -3 Max. Velocity (fps) 12 1 11.72 P107 -4 Applicable Exhibits: Exhibit B — Overall Water System Layout Exhibit C — Water System Analysis — Normal Conditions at Peak Flow (Junction Summary) Exhibit D — Water System Analysis — Fire Flow Conditions (Junction Summary) Exhibit E — Water System Analysis — Fire Flow Conditions (Pipe Summary) Exhibit F — Water System Analysis w/ Oversized Lines — Fire Flow Conditions (Junction Summary) Exhibit G — Water System Analysis w/ Oversized Lines — Fire Flow Conditions (Pipe Summary) Water System Summary of Section 200 only As Criteria Required Designed : Location Min. Pressure - fire (psi) 20 66.84 J200 -6 Max. Velocity (fps) 12 6.1 P200 -7 Max. Length of 6" pipe (ft) 1500 903 (connected to > 8 "on both Max Length of 6" pipe (ft) 800 NA (not connected on both Max. Length of 4" pipe) 500 NA Applicable Exhibits: Exhibit H — Section 200 Water System Layout Exhibit I — Water System Analysis — Fire Flow Conditions Exhibit J— Water System Analysis w/ Oversized Lines — Fire Flow Conditions Conclusion Results from all four analyzes indicate that the planned system in Section 200, as well as system for the entire subdivision, will exceed the minimum requirements of the BCS Design Guidelines and the State of Texas. 2 Exhibit A College Station Utilities Flow Test Report Coll : e Station i ities Reliable, Affordable, ommuni Owned Date Tuesday 24 August 2010 Time 11:00 A.M. Test completed by Justin Tamplin Witness Vincent Rodriquez Location 4228 Camber Nozzle size 2.5 Flow hydrant V -037 Pitot reading 77 G.P.M. 1430 Static hydrant V -047 Static PSI 85 Residual PSI 77 Comments REQUESTED FLOW TEST 4. cn 0 > r 17 II CA o o O J 0 N O A I. I = A I ' ' 1 Q2 \ + , r 1 0 2 \ 1 W � O \ O . O 0 Q ! 2 � • S I I \ 7 N \ S I I j 1 N 1 i N A W A10 2 A o � 2 i v ' E O Ul t O ....... w-4 Ay M_ =y —M A y - M - - � -M -- O -M i- M --9 -M . , . .. 1 1 0 c_ 1 f A f ' A G \ ; O 2 0 1 \ 0 101 I W W R N 1 x .. � ' v U _ - a. . _ - _ N 0S O 7 05. O 70 I ,'' \2 rn 1 Q \ 7 I ' 2 N T \S 1 a A \ / O c- 7.._.`\. R _ W L \ I l 0 - - -rs QR \ ' 0 7 0 0\ O R 1 \ I R O W • -P W O A \ S 1 1Q O Q /0,1 L x .,, _'i! , , ro •� • R \ j (.41 \7 0 1 Q Q \ 0 9 1 ..1 a ,, .a: V IC IDZis Ave me I + 0 0 N . J \ 7 N O • M 5 ‘30,5, ( 'N M ..M • f Q J N QS \ p : p t 1 2 UI 1 1 0 .9 A2 N `. i . 20, N Q 0 0 2 O i I Q 2Q S\ N o \R R C ° n 1 i .. 1 W •1 A A 20 \ A2 00 2 2 \ 0 A \ • L p0 O N A2 0 N o A 2 0 N A 2 0 I N o o ; w ill O s o 1 0 1 0) ° cri `/ \2 I rn \� I \S 1 T - i Ul f N • A Q • 2 10 i • r ��y \ -t (•W A } V J r O2 A 2 N 2 ° i , 0 i. 0 1 c S N 0 v O v7 I! 2 0 R , " a) Co ( � W p ' IN) 2 Q ) i (• I' j tt J J O \ 1. A T N (, , 20 1 i 1 0) --1 1 1 A A N'?Q. O ' S \ I • N 3 � N ...> M N • T 2 0 , 0 ° \ R CO I ° ci W i. N N \ 6 \ S 1 N I', , I I: � C_ = O i „ . , ,,,,,y1 _ U� W N NO J J N � - ,p � Q r, __. A 2 0 `1 2Q __. N 2 , . A2 , 1 M 1 y m 8 \ � S \S ' R \ I O`� \2 OS \ i. Z IT V / 0 � ' O H A A 2 \� 2� Q N Q I m ,.-. rn ° -, , .� cn �. \ 2 \ 1 . O I R D 1 t 1 i i 1 N A D A ? i i0 Q°2 e\ 2 Loi A2 0 ; c_ i . O J 1 1 [ IITTTTTI A O M_ Q A 2Q ry 2 Q S \ O 2 \7 I S\ ` S N CA N -F• M X IX _u_. . I 2 WS el 't Exhibit C Castlegate II Subdivision, All Sections Water System Analysis - NORMAL CONDITIONS AT PEAK FLOW w/ Minimum Required Line Sizes February 4, 2011 EPA Net Junction Summary Label Elevation Demand 1 HGL Pressure Label Elevation Demand HGL Pressure ft gpm ft 1 psi ft gpm ft psi Junc J100 -1 319.5 18.00 494.43 75.80 Junc J201 -2 315.5 18.00 494.64 77.62 Junc J100 -2 320.0 28.50 494.25 75.50 Junc J201 -3 315.0 19.50 494.62 77.83 Junc J100-3 326.0 18.00 494.08 72.83 Junc J201 -4 318.0 18.00 494.54 76.50 Junc J100 -4 323.0 30.00 493.98 74.08 Junc J201 -5 316.0 24.00 494.54 77.36 Junc J101 -1 330.0 16.50 493.94 71.04 Junc J201 -6 320.0 0.00 494.48 75.60 Junc J101 -2 325.5 27.00 493.88 72.96 Junc J201 -7 323.0 0.00 494.37 74.25 Junc J101 -3 336.0 0.00 493.87 68.41 Junc J201 -8 324.0 0.00 494.21 73.75 Junc J101 -4 336.0 19.50 493.87 68.41 Junc J203 -1 333.0 0.00 495.92 70.59 Junc J101 -5 328.0 28.50 493.83 71.86 Junc J203 -2 334.0 33.00 495.03 69.77 Junc J102 -1 334.0 0.00 493.85 69.26 Junc J203 -3 328.0 30.00 494.79 72.27 Junc J102 -2 336.0 21.00 493.85 68.40 Junc J203 -4 322.0 0.00 494.83 74.89 Junc J102 -3 329.0 30.00 493.83 71.42 Junc J203 -5 327.0 16.50 494.83 72.72 Junc J102 -4 329.0 0.00 493.83 71.42 Junc J203 -6 326.0 15.00 494.75 73.12 Junc J103 -1 325.0 15.00 494.09 73.27 June J204 -1 323.0 30.00 494.66 74.38 Junc J103-2 325.0 15.00 493.96 73.21 June J204-2 323.0 15.00 494.67 74.38 Junc J104 -1 325.5 6.00 494.09 73.05 Junc J205 -1 326.0 6.00 494.20 72.88 Junc J104 -2 340.0 27.00 494.07 66.76 Junc J205 -2 338.0 18.00 494.10 67.64 June J104-3 325.5 6.00 493.95 72.99 June J205-3 326.0 6.00 494.36 72.95 Junc J104 -4 334.0 27.00 493.72 69.21 Junc J205 -4 337.0 18.00 494.26 68.14 Junc J105 -1 328.0 15.00 493.87 71.87 Junc J206 -1 320.0 6.00 494.48 75.60 Junc J105 -2 329.0 15.00 493.83 71.42 Junc J206 -2 330.0 18.00 494.47 71.27 Junc J106 -1 328.0 6.00 493.87 71.87 Junc J206 -3 316.0 0.00 494.49 77.34 Junc J106 -2 335.0 27.00 493.63 68.74 Junc J206 -4 316.5 6.00 494.48 77.12 Junc J106 -3 330.0 6.00 493.83 70.99 Junc J206 -5 322.0 18.00 494.38 74.69 Junc J106 -4 337.5 27.00 493.59 67.64 Junc J207 -1 312.0 0.00 494.51 79.08 Junc J107 -1 330.0 13.50 493.82 70.98 Junc J207 -10 310.0 18.00 494.46 79.93 Junc J107 -2 331.0 6.00 493.82 70.55 Junc J207 -11 316.0 0.00 494.60 77.39 Junc J107 -3 340.0 27.00 493.58 66.55 Junc J207 -12 306.0 0.00 494.60 81.72 Junc J107 -4 330.0 0.00 493.82 70.98 Junc J207 -2 313.0 6.00 494.50 78.65 Junc J200 -1 312.0 0.00 495.92 79.69 Junc J207 -3 314.5 18.00 494.40 77.95 Junc J200 -2 314.0 0.00 495.29 78.55 Junc J207 -4 312.0 0.00 494.51 79.08 Junc J200 -3 321.0 0.00 495.01 75.40 Junc J207 -5 313.0 0.00 494.55 78.67 Junc J200 -4 321.0 24.00 494.96 75.38 Junc J207 -6 310.0 9.00 494.54 79.96 Junc J200 -5 319.0 24.00 494.77 76.16 Junc J207 -7 313.0 21.00 494.38 78.59 Junc J200 -6 329.0 0.00 494.78 71.83 Junc J207 -8 312.0 0.00 494.56 79.10 Junc J207 -9 311.0 6.00 494.55 79.53 Junc J208 -1 315.0 0.00 494.57 77.81 Junc J208 -2 317.0 30.00 494.58 76.95 Junc J208 -3 320.0 15.00 494.62 75.66 Lowest Pressure Sections 100 -200 66.55 Lowest Pressure Sections 201 -208 67.64 Exhibit D Castlegate II Subdivision, All Sections Water System Analysis - FIRE FLOW CONDITIONS w/ Minimum Required Line Sizes February 4, 2011 EPA Net Junction Summary Label Elevation Demand HGL 1 Pressure Label Elevation Demand HGL Pressure ft gpm ft psi ft gpm ft psi Junc J100 -1 319.5 18.00 474.66 67.23 Junc J201 -2 315.5 18.00 479.12 70.90 Junc J100 -2 320.0 28.50 473.95 66.71 Junc J201 -3 315.0 19.50 479.06 71.09 Junc J100 -3 326.0 18.00 471.66 63.12 Junc J201 -4 318.0 18.00 478.77 69.66 Junc J100 -4 323.0 30.00 471.39 64.30 Junc J201 -5 316.0 24.00 478.73 70.51 Junc J101 -1 330.0 16.50 469.88 60.61 Junc J201 -6 320.0 0.00 478.36 68.62 Junc J101 -2 325.5 27.00 469.58 62.43 Junc J201 -7 323.0 0.00 477.29 66.86 Junc J101 -3 336.0 0.00 468.59 57.45 Junc J201 -8 324.0 0.00 475.32 65.57 Junc J101 -4 336.0 19.50 468.59 57.45 Junc J203 -1 333.0 0.00 482.99 64.99 Junc J101 -5 328.0 28.50 467.98 60.65 Junc J203 -2 334.0 33.00 480.34 63.41 Junc J102 -1 334.0 0.00 467.75 57.95 Junc J203 -3 328.0 30.00 479.66 65.71 Junc J102 -2 336.0 21.00 467.75 57.09 Junc J203 -4 322.0 0.00 479.81 68.38 Junc J102 -3 329.0 30.00 466.43 59.55 Junc J203 -5 327.0 16.50 479.81 66.21 Junc J102 -4 329.0 0.00 466.43 59.55 Junc J203 -6 326.0 15.00 479.60 66.55 Junc J103 -1 325.0 15.00 473.09 64.17 Junc J204 -1 323.0 30.00 479.31 67.73 Junc J103 -2 325.0 15.00 471.25 63.37 Junc J204 -2 323.0 15.00 479.35 67.75 Junc J104 -1 325.5 6.00 473.09 63.95 Junc J205 -1 326.0 6.00 475.31 64.70 Junc J104 -2 340.0 27.00 473.08 57.66 Junc J205 -2 338.0 18.00 475.21 59.45 Junc J104 -3 325.5 6.00 471.25 63.15 Junc J205 -3 326.0 6.00 477.29 65.55 Junc J104 -4 334.0 27.00 471.01 59.37 Junc J205 -4 337.0 18.00 477.19 60.74 Junc J105 -1 328.0 15.00 469.41 61.27 Junc J206 -1 320.0 6.00 478.36 68.62 Junc J105 -2 329.0 15.00 467.54 60.03 Junc J206 -2 330.0 18.00 478.36 64.28 Junc J106 -1 328.0 6.00 469.41 61.27 Junc J206 -3 316.0 0.00 478.52 70.42 Junc J106 -2 335.0 27.00 469.17 58.14 Junc J206 -4 316.5 6.00 478.51 70.20 Junc J106 -3 330.0 6.00 467.53 59.59 Junc J206 -5 322.0 18.00 478.41 67.77 Junc J106 -4 337.5 27.00 467.30 56.24 Junc J207 -1 312.0 0.00 478.69 72.23 Junc J107 -1 330.0 13.50 465.14 58.55 Junc J207 -10 310.0 18.00 478.89 73.18 Junc J107 -2 331.0 1,006.00';: 461.09 56.37 Junc J207 -11 316.0 0.00 479.11 70.68 Junc J107 -3 340.0 27.00 460.86 52.37 Junc J207 -12 306.0 0.00 479.11 75.01 Junc J107 -4 330.0 0.00 465.14 58.55 Junc J207 -2 313.0 6.00 478.69 71.79 Junc J200 -1 312.0 0.00 482.97 74.08 Junc J207 -3 314.5 18.00 478.59 71.10 Junc J200 -2 314.0 0.00 480.17 72.00 Junc J207 -4 312.0 0.00 478.73 72.24 Junc J200 -3 321.0 0.00 479.93 68.87 Junc J207 -5 313.0 0.00 478.94 71.90 Junc J200 -4 321.0 24.00 479.89 68.85 Junc J207 -6 310.0 9.00 478.93 73.20 June J200 -5 319.0 24.00 479.48 69.54 Junc J207 -7 313.0 21.00 478.78 71.83 Junc J200 -6 329.0 0.00 479.58 65.25 Junc J207 -8 312.0 0.00 478.99 72.36 Junc J207 -9 311.0 6.00 478.99 72.79 Junc J208 -1 315.0 0.00 478.95 71.04 Junc J208 -2 317.0 30.00 479.04 70.21 Junc J208 -3 320.0 j 15.00 479.21 68.98 Lowest Pressure in Sections 100 - 200 52.37 Lowest Pressure in Sections 201 - 208 59.45 Highlighted junction indicates location of nearest fire hydrant where fire flow was modeled. Exhibit E Castlegate II Subdivision, All Sections Water System Analysis - FIRE FLOW CONDITIONS w/ Minimum Required Line Sizes February 4, 2011 EPA Net Pipe Summary Length Diameter 1 Discharge Velocity Length Diameter Discharge Velocity Label - Label ft in gpm ft/s ft in gpm ft/s Pipe P100 -1 358.0 8.00 1052.19 6.72 Pipe P201 -1 243.0 8.00 295.60 1.89 Pipe P100 -2 465.0 8.00 303.13 1.93 Pipe P201 -10 782.7 8.00 423.31 2.70 Pipe P100 -3 382.0 8.00 731.06 4.67 Pipe P201 -3 133.0 6.00 72.40 0.82 Pipe P100 -4 540.0 6.00 78.54 0.89 Pipe P201 -4 1174.0 6.00 52.90 0.60 Pipe P101 -1 296.0 8.00 634.52 4.05 Pipe P201 -5 354.0 6.00 34.90 0.40 Pipe J101 -2 540.0 6.00 81.53 0.93 Pipe P201 -6 351.0 8.00 - 253.64 1.62 Pipe P101 -3 291.0 8.00 536.49 3.42 Pipe P201 -7 208.0 8.00 328.57 2.10 Pipe P101 -4 128.0 6.00 0.00 0.00 Pipe P201 -8 307.0 8.00 471.31 3.01 Pipe P101 -5 552.0 6.00 119.54 1.36 Pipe P201 -9 625.0 8.00 447.31 2.86 Pipe P102-1 333.0 8.00 397.46 2.54 Pipe P202 -1 756.0 8.00 0.00 0.00 Pipe P102-2 173.0 8.00 0.00 0.00 Pipe P203 -1 305.0 8.00 - 772.39 4.93 Pipe P102 -3 572.0 8.00 376.46 2.40 Pipe P203 -2 310.0 8.00 367.43 2.35 Pipe P102 -4 126.0 8.00 0.00 0.00 Pipe P203 -4 665.0 8.00 - 212.74 1.36 Pipe P103 -1 671.0 8.00 274.63 1.75 Pipe P203 -5 664.0 6.00 31.64 0.36 Pipe P103 -2 649.0 6.00 48.54 0.55 Pipe P203 -6 436.0 8.00 0.00 0.00 Pipe P103 -3 291.0 8.00 649.94 4.15 Pipe P203 -7 310.0 8.00 - 196.24 1.25 Pipe P104 -1 68.0 8.00 33.00 0.21 Pipe P204 -1 880.0 6.00 48.44 0.55 Pipe P104-2 642.0 8.00 27.00 0.17 Pipe P204 -2 665.0 6.00 25.92 0.29 Pipe P104-3 67.0 6.00 33.00 0.37 Pipe P204 -3 310.0 8.00 258.34 1.65 Pipe P104-4 456.0 4.00 27.00 0.69 Pipe P204 -4 310.0 8.00 212.88 1.36 Pipe P105 -1 649.0 6.00 54.53 0.62 Pipe P205 -1 175.3 6.00 24.00 0.27 Pipe P105 -2 649.0 6.00 91.04 1.03 Pipe P205 -2 420.0 4.00 18.00 0.46 Pipe P105 -3 291.0 8.00 650.48 4.15 Pipe P205 -3 87.0 6.00 24.00 0.27 Pipe P105-4 291.0 8.00 657.01 4.19 Pipe P205 -4 420.0 4.00 18.00 0.46 Pipe P106 -1 67.0 6.00 33.00 0.37 Pipe P206 -1 87.0 8.00 24.00 0.15 Pipe P106-2 456.0 4.00 27.00 0.69 Pipe P206 -2 555.0 8.00 18.00 0.11 Pipe P106-3 68.0 6.00 33.00 0.37 Pipe P206 -3 87.0 6.00 24.00 0.27 Pipe P106-4 456.0 4.00 27.00 0.69 Pipe P206 -4 420.0 4.00 18.00 0.46 Pipe P107 -1 659.0 8.00 346.46 2.21 Pipe P206 -5 307.0 8.00 - 166.74 1.06 Pipe P107 -2 332.0 8.00 700.04 4.47 Pipe P206 -6 268.0 8.00 - 190.74 1.22 Pipe P107-3 126.0 8.00 0.00 0.00 Pipe P207 -1 87.0 6.00 24.00 0.27 Pipe P107 -4 67.0 6.00 1033.00 11.72 Pipe P207 -10 547.0 8.00 106.71 0.68 Pipe P107-5 453.0 4.00 27.00 0.69 Pipe P207 -2 420.0 4.00 18.00 0.46 Pipe P200 -1 145.0 8.00 1189.11 7.59 Pipe P207 -3 46.0 8.00 - 214.74 1.37 Pipe P200 -2 681.0 8.00 - 136.92 0.87 Pipe P207 -4 261.0 8.00 - 214.74 1.37 Pipe P200 -3 126.0 8.00 136.92 0.87 Pipe P207 -5 160.0 6.00 30.00 0.34 Pipe P200 -4 966.0 8.00 159.23 1.02 Pipe P207 -6 478.0 4.00 21.00 0.54 Pipe P200 -5 327.0 8.00 272.15 1.74 Pipe P207 -7 347.0 8.00 -82.71 0.53 Pipe P200 -6 520.0 6.00 47.45 0.54 Pipe P207 -8 88.0 6.00 24.00 0.27 Pipe P200 -7 384.0 6.00 -47.45 0.54 Pipe P207 -9 405.0 4.00 18.00 0.46 Pipe P208 -1 613.0 6.00 -64.03 0.73 Pipe P208 -2 267.0 6.00 64.03 0.73 Pipe P208 -3 728.0 6.00 -50.25 0.57 Pipe P208 -4 268.0 8.00 171.96 1.10 Pipe P208 -5 351.0 8.00 205.82 1.31 Pipe P208 -6 418.0 8.00 - 106.71 0.68 Pipe P208 -7 207.0 8.00 162.04 1.03 Max Velocity Sections 100 -200 11.72 Max Velocity Sections 201 -2081 4.93 Exhibit F Castlegate II Subdivision, All Sections Water System Analysis - FIRE FLOW CONDITIONS w /Oversized Lines April 8, 2011 EPA Net Junction Summary Label Elevation Demand HGL Pressure Label Elevation I Demand HGL Pressure ft gpm ft p ft gpm ft psi Junc J100 -1 319.5 18.00 479.09 69.15 Junc J201 -2 315.5 18.00 479.80 71.19 Junc J100 -2 320.0 28.50 478.57 68.71 June J201 -3 315.0 19.50 479.76 71.39 Junc J100 -3 326.0 18.00 478.36 66.02 Junc J201 -4 318.0 18.00 479.64 70.04 Junc J100 -4 323.0 30.00 477.72 67.04 Junc J201 -5 316.0 24.00 479.63 70.90 Junc J101 -1 330.0 16.50 477.93 64.10 Junc J201 -6 320.0 0.00 479.49 69.11 Junc J101 -2 325.5 27.00 477.08 65.68 Junc J201 -7 323.0 0.00 479.14 67.66 Junc J101 -3 336.0 0.00 477.64 61.37 Junc J201 -8 324.0 0.00 478.56 66.97 Junc J101 -4 336.0 19.50 477.64 61.37 Junc J203 -1 333.0 0.00 483.00 64.99 Junc J101 -5 328.0 28.50 476.35 64.28 Junc J203 -2 334.0 33.00 480.37 63.42 Junc J102 -1 334.0 0.00 477.47 62.16 June J203 -3 328.0 30.00 480.07 65.89 Junc J102 -2 336.0 21.00 477.47 61.30 Junc J203 -4 322.0 0.00 480.30 68.59 June J102 -3 329.0 30.00 475.47 63.46 Junc J203 -5 327.0 16.50 480.30 66.42 Junc J102 -4 329.0 0.00 475.47 63.46 Junc J203 -6 326.0 15.00 480.09 66.77 Junc J103 -1 325.0 15.00 477.96 66.28 Junc J204 -1 323.0 30.00 479.89 67.98 Junc J103 -2 325.0 15.00 477.26 65.97 Junc J204 -2 323.0 15.00 479.93 68.00 Junc J104 -1 325.5 6.00 477.96 66.06 Junc J205 -1 326.0 6.00 478.55 66.10 Junc J104 -2 340.0 27.00 477.95 59.77 Junc J205 -2 338.0 18.00 478.45 60.86 June J104 -3 325.5 6.00 477.25 65.75 Junc J205 -3 326.0 6.00 479.14 66.36 Junc J104 -4 334.0 27.00 477.02 61.97 Junc J205 -4 337.0 18.00 479.04 61.55 Junc J105 -1 328.0 15.00 476.39 64.30 Junc J206 -1 320.0 6.00 479.49 69.11 Junc J105 -2 329.0 15.00 475.25 63.37 Junc J206 -2 330.0 18.00 479.48 64.77 Junc J106 -1 328.0 6.00 476.38 64.29 Junc J206 -3 316.0 0.00 479.53 70.86 Junc J106 -2 335.0 27.00 476.15 61.16 Junc J206 -4 316.5 6.00 479.53 70.64 Junc J106 -3 330.0 6.00 475.25 62.94 Junc J206 -5 322.0 18.00 479.43 68.21 Junc J106 -4 337.5 27.00 475.01 59.58 Junc J207 -1 312.0 0.00 479.60 72.62 Junc J107 -1 330.0 13.50 473.43 62.15 Junc J207 -10 310.0 18.00 479.62 73.50 Junc J107 -2 331.0 1 469.38 59.96 Junc J207 -11 316.0 0.00 479.79 70.97 Junc J107 -3 340.0 27.00 469.15 55.96 June J207 -12 306.0 0.00 479.79 75.30 Junc J107 -4 330.0 0.00 473.43 62.15 Junc J207 -2 313.0 6.00 479.59 72.18 Junc J200 -1 312.0 0.00 482.99 74.09 Junc J207 -3 314.5 18.00 479.49 71.49 Junc J200 -2 314.0 0.00 480.17 72.00 Junc J207 -4 312.0 0.00 479.61 72.63 Junc J200 -3 321.0 0.00 480.18 68.97 Junc J207 -5 313.0 0.00 479.70 72.23 Junc J200 -4 321.0 24.00 480.18 68.97 Junc J207 -6 310.0 9.00 479.69 73.53 Junc J200 -5 319.0 24.00 479.97 69.75 Junc J207 -7 313.0 21.00 479.54 72.16 Junc J200 -6 329.0 0.00 480.03 65.44 June J207 -8 312.0 0.00 479.72 72.67 Junc J207 -9 311.0 6.00 479.72 73.11 Junc J208 -1 315.0 0.00 479.71 71.37 Junc J208 -2 317.0 30.00 479.75 70.52 Junc J208 -3 320.0 15.00 479.84 69.26 Lowest Pressure in Sections 100 -200 55.96 Lowest Pressure in Sections 201 -208 60.86 Highlighted junction indicates location of nearest fire hydrant where fire flow was modeled. Exhibit G Castlegate II Subdivision, All Sections Water System Analysis - FIRE FLOW CONDITIONS w /Oversized Lines April 8, 2011 EPA Net Pipe Summary Label Length Diameter Discharge Velocity Label Length Diameter Discharge Velocity - - - - -- ft in gpm ft/s ft in gpm ft/s Pipe P100 -1 358.0 12.00 1267.60 3.60 Pipe P201 -1 243.0 8.00 200.78 1.28 PipeP100 -2 465.0 8.00 256.10 1.63 PipeP201 -10 782.7 8.00 207.90 1.33 Pipe P100 -3 382.0 12.00 993.51 2.82 Pipe P201 -3 133.0 6.00 53.44 0.61 Pipe P100 -4 540.0 6.00 123.64 1.40 Pipe P201 -4 1174.0 6.00 33.94 0.39 Pipe P101 -1 296.0 12.00 851.86 2.42 Pipe P201 -5 354.0 6.00 -15.94 0.18 Pipe P101 -2 540.0 6.00 143.76 1.63 Pipe P201 -6 351.0 8.00 - 162.37 1.04 Pipe P101 -3 291.0 12.00 691.60 1.96 Pipe P201 -7 208.0 8.00 193.53 1.24 Pipe P101 -4 128.0 6.00 0.00 0.00 Pipe P201 -8 307.0 8.00 255.90 1.63 Pipe P101 -5 552.0 6.00 178.43 2.02 Pipe P201 -9 625.0 8.00 231.90 1.48 Pipe P102 -1 333.0 12.00 493.67 1.40 Pipe P202 -1 756.0 8.00 0.00 0.00 Pipe P102-2 173.0 12.00 0.00 0.00 Pipe P203 -1 305.0 8.00 - 768.46 4.90 Pipe P102-3 572.0 8.00 472.67 3.02 Pipe P203 -2 310.0 8.00 234.76 1.50 Pipe P102-4 126.0 8.00 0.00 0.00 Pipe P203 -4 665.0 12.00 - 212.19 0.60 Pipe P103 -1 671.0 8.00 227.60 1.45 Pipe P203 -5 664.0 6.00 -12.74 0.14 Pipe P103-2 649.0 6.00 93.64 1.06 Pipe P203 -6 436.0 12.00 0.00 0.00 Pipe P103 -3 291.0 8.00 387.49 2.47 Pipe P203 -7 310.0 8.00 - 195.69 1.25 Pipe P104 -1 68.0 8.00 33.00 0.21 Pipe P204 -1 880.0 6.00 -33.02 0.37 Pipe P104-2 642.0 8.00 27.00 0.17 Pipe P204 -2 665.0 6.00 24.22 0.27 Pipe P104-3 67.0 6.00 33.00 0.37 Pipe P204 -3 310.0 8.00 - 182.66 1.17 Pipe P104-4 456.0 4.00 27.00 0.69 Pipe P204 -4 310.0 8.00 167.96 1.07 Pipe P105 -1 649.0 6.00 116.76 1.32 Pipe P205 -1 175.3 6.00 24.00 0.27 Pipe P105-2 649.0 6.00 149.93 1.70 Pipe P205 -2 420.0 4.00 18.00 0.46 Pipe P105 -3 291.0 8.00 433.14 2.76 Pipe P205 -3 87.0 6.00 24.00 0.27 Pipe P105 -4 291.0 8.00 501.90 3.20 Pipe P205 -4 420.0 4.00 18.00 0.46 Pipe P106 -1 67.0 6.00 33.00 0.37 Pipe P206 -1 87.0 8.00 24.00 0.15 Pipe P106-2 456.0 4.00 27.00 0.69 Pipe P206 -2 555.0 8.00 18.00 0.11 Pipe P106 -3 68.0 6.00 33.00 0.37 Pipe P206 -3 87.0 6.00 24.00 0.27 Pipe P106 -4 456.0 4.00 27.00 0.69 Pipe P206 -4 420.0 4.00 18.00 0.46 Pipe P107-1 659.0 8.00 442.67 2.83 Pipe P206 -5 307.0 8.00 -86.37 0.55 Pipe P107-2 332.0 8.00 603.83 3.85 Pipe P206 -6 268.0 8.00 - 110.37 0.70 Pipe P107-3 126.0 8.00 0.00 0.00 Pipe P207 -1 87.0 6.00 24.00 0.27 Pipe P107 -4 67.0 6.00 1033.00 11.72 Pipe P207 -10 547.0 8.00 -77.30 0.49 Pipe P107-5 453.0 4.00 27.00 0.69 Pipe P207 -2 420.0 4.00 18.00 0.46 Pipe P200 -1 145.0 8.00 1193.04 7.61 Pipe P207 -3 46.0 8.00 - 134.37 0.86 Pipe P200 -2 681.0 12.00 -74.57 0.21 Pipe P207 -4 261.0 8.00 - 134.37 0.86 Pipe P200 -3 126.0 12.00 -74.57 0.21 Pipe P207 -5 160.0 6.00 30.00 0.34 Pipe P200 -4 966.0 12.00 - 288.51 0.82 Pipe P207 -6 478.0 4.00 21.00 0.54 Pipe P200 -5 327.0 8.00 189.94 1.21 Pipe P207 -7 347.0 8.00 -53.30 0.34 Pipe P200 -6 520.0 6.00 34.84 0.40 Pipe P207 -8 88.0 6.00 24.00 0.27 Pipe P200 -7 384.0 6.00 34.84 0.40 Pipe P207 -9 405.0 4.00 18.00 0.46 Pipe P208 -1 613.0 6.00 39.22 0.45 Pipe P208 -2 267.0 6.00 39.22 0.45 Pipe P208 -3 728.0 6.00 -36.44 0.41 Pipe P208 -4 268.0 8.00 128.74 0.82 Pipe P208 -5 351.0 8.00 143.86 0.92 Pipe P208 -6 418.0 8.00 77.30 0.49 Pipe P208 -7 207.0 8.00 - 111.07 0.71 Max Velocity Sections 100 -200, 11.72 Max Velocity Sections 201 -208 4.90 0 ■ 0 CD Kirnbolton Drive Kura} II olt n a .0r± � e ,. c O ,/ ViCt0 Avenue L Victoria Avenue �4� O y O \ 7 nberb:rne Dri1': E r°7 2. 4 •.* \ r A ° ° ) . - O O Odell Lane O L O cn rn m d n ■ • O Y N - o ° x Z \5 L" N Y O r r rn� 'O ---1 �p Iv Cr) Cn1 C_ z r 1 D 0 C m ; nE z � �_ i ce' ! � o ,i- a a% I " { Exhibit I Castlegate II Subdivision, Section 200 Water System Analysis - FIRE FLOW CONDITIONS w/ Minimum Required Lines Sizes February 4, 2011 EPA Net PIPE SUMMARY Label Length Diameter Discharge Velocity ft in gpm ftls Pipe P200 -1 145 8 403 2.6 Pipe P200 -2 681 8 403 2.6 Pipe P200 -3 126 8 403 2.6 Pipe P200 -4 966 8 107 0.7 Pipe P200 -5 327 8 485 3.1 Pipe P200 -6 520 6 461 5.2 Pipe P200 -7 384 6 539 6.1 Pipe P203 -1 305 8 708 4.5 Pipe P203 -2 310 8 569 3.6 Highest Velocity in Section 200 6.1 EPA Net JUNCTION SUMMARY Label Elevation Demand Calculated Pressure ft -- ft psi Junc J200 -1 312 0.00 493.99 78.86 Junc J200 -2 314 0.00 493.61 77.83 Junc J200 -3 321 0.00 491.84 74.03 Junc J200 -4 321 24.00 491.51 73.88 Junc J200 -5 319 24.00 490.31 74.23 Junc J200 -6 329 1,000.00 483.25 66.84 Junc J203 -1 333 0.00 493.98 69.75 Junc J203 -2 334 33.00 491.73 68.34 Junc J203 -3 328 30.00 490.20 70.28 Lowest Pressure in Section 200 66.84 i Exhibit J Castlegate II Subdivision, Section 200 Water System Analysis - FIRE FLOW CONDITIONS w/ Oversized Lines April 8, 2011 EPA Net PIPE SUMMARY Label Length Diameter Discharge Velocity ft in gpm ft/s Pipe P200 -1 145 8 580 3.7 Pipe P200 -2 681 12 -580 1.6 Pipe P200 -3 126 12 580 1.6 Pipe P200 -4 966 12 -67 0.2 Pipe P200 -5 327 8 489 3.1 Pipe P200 -6 520 6 -465 5.3 Pipe P200 -7 384 6 -535 6.1 Pipe P203 -1 305 8 -531 3.4 Pipe P203 -2 310 8 565 3.6 Highest Velocity in Section 200 6.1 EPA Net JUNCTION SUMMARY Label Elevation Demand ' Calculated Pressure ft ft _ - -- psi Junc J200 -1 312 0.00 493.99 78.85 Junc J200 -2 314 0.00 493.25 77.67 Junc J200 -3 321 0.00 492.76 74.42 Junc J200 -4 321 24.00 492.67 74.39 Junc J200 -5 319 24.00 491.46 74.73 Junc J200 - 6 329 1,000.00 484.29 67.29 Junc J203 -1 333 0.00 493.99 69.76 Junc J203 -2 334 33.00 492.66 68.75 Junc J203 -3 328 30.00 491.15 70.69 Lowest Pressure in Section 200 67.29