Loading...
HomeMy WebLinkAboutApplication (12-15) FOR OFFIC USE ONLY 1 ` 1 CASE N O.: Via i f DATE SUBMITTED: 1 . , 1 Oi r TIME: I I : 30 (,1'11 O1 (.,OO1I,,, s1:`� 1 APPLICATION STAFF: Y GENERAL MINIMUM SUBMITTAL REQUIREMENTS: $932 Site Plan Application Fee. 1 ,( $350 Non - Residential Architectural Standards Building Review Application Fee (if applicable). '1, X $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is ( II. i i 19 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Fourteen (14) folded copies of site plan. One (1) folded copy of the landscape plan. , r_ One (1) copy of the following for Non - Residential Architectural Standards building review or Northgate Building Review (if applicable). IX Building elevations to scale for all buildings. IX A list of building materials for all facade and screening. Xi Color samples for all buildings or list colors to be used from the approved color palette. Electronic copy of Site Plan e- mailed to csuelectdesign @cstx.gov. Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). ly The attached Site Plan Non - Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. 1 Date of Optional Preapplication or Stormwater Management Conference March 2011 NAME OF PROJECT ROCK PRAIRIE PROFESSIONAL OFFICE COMPLEX ADDRESS 1103 ROCK PRAIRIE ROAD LEGAL DESCRIPTION (Lot, Block, Subdivision) TRACT ' A -1 ', SOUTHWOOD HOLDINGS, 2.763 ac (v7953/p025) APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Joe Gattis, PE, GATTIS Engineering E - mail loe @gattisengineering.com Street Address 2010 Moses Creek Ct. City College Station State Texas Zip Code 77845 Phone Number 979- 575 -5022 Fax Number 979- 690 -6888 PROPERTY OWNER'S INFORMATION: Name NIVAS Holdings, L.P. E - mail sukkawala @gmail.com Street Address 17290 Eagle Pass Drive City College Station State Texas Zip Code 77845 Phone Number 979 450 - 1116 Fax Number nia 1/11 Page 1 of 11 ARCHITECT OR ENGINEER'S INFORMATION: Name Bill Scarmardo AIA; WCS Architects E - mail bill @scarmardo.com Street Address 3200 Crane Avenue City B St Texas Zip Code 77801 Phone Number 979 779 - 3336 Fax Number 979 779 - 3424 OTHER CONTACTS (Please specify type of contact): Name Pat Marek; Marek Brothers Construction Co. E - mail pat.marek @marekbrosbcs.co Street Address 2112 Southwood Dr City College Station State Texas Zip Code 77845 Phone Number 979 696 - 5563 Fax Number 979 - 3089 Current zoning Admin /Professional (A/P ) Present use of property Vacant Tract Proposed use of property Professional Office Complex Number of parking spaces required 28 Number of parking spaces proposed 30 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? Yes No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? Ye t�No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: Re -Plat of Tract' A -1 ' Southwood Holdings into Final Plat Lots 1,2,3 City Project Number (in known): Case file No. 11- 00500167 Date / Timeframe when submitted: October 2011 1/11 Page 2 of 11 MULTI- FAMILY RESIDENTIAL PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) Total Acreage # of Multi - Family Dwelling Units Floodplain Acreage X $1646 = $ Housing Units # of acres in floodplain # of 1 Bedroom Units # of acres in detention # of 2 Bedroom Units # of acres in greenways # of 3 Bedroom Units Date dedication approved by Parks & # of 4 Bedroom Units Recreation Advisory Board COMMERCIAL FOR 2 BEDROOM s UNITS ONLY ft Total Acreage 0.842 ac Building Square Feet 5400 sf # Bedrooms < 132 sq. ft. Floodplain Acreage 0.0 * Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. i t— y c Signatur- a i d title' Date 1/11 Page 3 of 11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re -issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans top&i d1 S a7`C (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, GREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR E DEVELOVENT 7RMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ZCURATE. // // Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NO] and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT�ERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. j / Engineer Date 1/11 Page 4 of 11