Loading...
HomeMy WebLinkAboutCorrespondence Date: Development Engineer City of College Station Department of Development Services P.O. Box 9960 College Station, TX 77842 Re: Permit for Private Improvements within City Right of Way (PIP) Development: Dear Sir /Madam, To the fullest extent permitted by law, I /we, the owners of the property listed below, shall indemnify, hold harmless, and defend the City, its officers, agents, and employees from and against any and all claims, losses, damages, causes of action, suits, and liability of every kind, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or for any breach of contract, arising out of or in connection with the installation, operation and maintenance of the facilities authorized by this permit. This indemnity shall apply regardless of whether such injuries, death, damages, or breach are caused in part by the negligence or omission of the City, any other party indemnified hereunder, the Contractor, or any third party. Signature of Owner: Name of Property Owner: Legal Description of Property Owned STATE OF TEXAS ) CORPORATE ACKNOWLEDGMENT COUNTY OF BRAZOS ) This instrument was acknowledged before me on the day of , 2001, by in his /her capacity as of , a corporation, on behalf of said corporation. Notary Public in and for the State of Texas STATE OF TEXAS INDIVIDUAL ACKNOWLEDGMENT COUNTY OF BRAZOS ) This instrument was acknowledged before me on the day of , 2001, by , in his /her capacity as Owner of the property described above.. Notary Public in and for the State of Texas FROM: ISSUER: IRREVOCABLE LETTER OF CREDIT DATE: TO BENEFICIARY: City of College Station Attention: Director of Development Services 1101 Texas Avenue College Station, Texas 77840 IRREVOCABLE LETTER OF CREDIT NO.: ISSUE DATE: 12:00 Noon Central Standard Time, , 2002 EXPIRATION DATE: 12:00 Noon Central Standard Time, , 2002, or upon the completion and final payment to all contractors, whichever occurs first. LOCATION OF PROJECT: AMOUNT: THOUSAND HUNDRED AND NO /100 DOLLARS ($ .00) ACCOUNT OF: , (herein "DEVELOPER ") GENERAL TERMS & CONDITIONS: The Issuing Bank set out above hereby issues its IRREVOCABLE LETTER OF CREDIT NO. in favor of the CITY OF COLLEGE STATION, TEXAS, in accordance with Chapter 5, V.T.C.A. TEXAS BUSINESS AND COMMERCE CODE and pursuant to the Code of Ordinances of the City of College Station, Chapter 9: Subdivisions, for the Account of DEVELOPER for an amount of up to THOUSAND HUNDRED AND NO /100 DOLLARS ($ .00). This amount is available by your draft(s) payable at sight when accompanied by the following: 1. Sworn Statement by a duly authorized representative of the City of College Station, Texas, stating that Developer has /have defaulted and failed to remove the improvements described below in accordance with the Chapter 3 of the Code of Ordinances of the City of College Station, Texas, and that the proceeds from this Letter of Credit will either be utilized by the City of College Station, Texas, to complete such removal or will be returned by the City of College Station to the Issuing Bank. js /c /mydocs /forms/ltrcrdt- rev00. doc 10/15/99 SPECIAL TERMS & CONDITIONS: 1. All banking fees /expenses /charges incurred are for the account of Developer. This Letter of Credit is issued in conjunction with the development of Developer in the City of College Station, Texas, specifically for the following: To guarantee the payment and performance of the removal of private irrigation, electrical, landscaping, retaining walls, shelters, signs and related improvements in , within the City of College Station, Texas, for a period not to exceed one (1) year from the date hereof. 2. Disbursements pursuant to this Letter of Credit will never exceed the above - stated amount, less any amount released by the City of College Station, Texas. The amount of credit under this Letter of Credit may be reduced upon approval and acceptance by the City of College Station, which reduction may only be made with the written authorization of the Development Engineer of the City of College Station. 3. In accordance with Section 5.106 of the TEXAS BUSINESS AND COMMERCE CODE, this Letter of Credit may be modified, upon the execution and delivery to Issuer of a sworn statement giving consent to modification by the Development Engineer of the City of College Station. 4. The Issuer of this Letter of Credit has caused this Letter to be signed by the undersigned officer who has attached proof of his authorization to sign, together with attestation by Issuer's authorized attesting officer and sealed with the seal of Issuer. ISSUER: BY: Authorized Officer Attested By: STATE OF TEXAS * COUNTY OF BRAZOS * This instrument was acknowledged before me on , 2002, by , the authorized officer of Issuer, a Texas Banking Corporation, on behalf of said Banking Corporation and in the capacity stated. Notary Public — State of Texas js /c /mydocs /fo rms/ltrcrdt- rev00. doc 10/15/99 BCS DEVELOPMENT CO. 4090 S. Highway 6, South College Station, TX. 77845 November 19, 2002 Mr. Brett McCuIIy City of College Station PO Box 9960 College Station, TX. 77840 RE: PIP Westfield Village Entrance 02 -213 Dear Brett: In the original application regarding City approval of the aforementioned project, I did not fill out the form properly as it relates to estimated removal cost. I left that blank and should have shown a cost of $3,000. Please let this letter serve as evidence to amend the application accordingly. I have enclosed a check for $3,000 to serve as a deposit to be used by the City of College Station in the event that any improvements are required to be moved on or before 11/20/03. If the money has not been used on or before 11/20/03, then the deposit shall e returned to BCS Development Co. Thank you. Best% gar andy Fren h President BCS Development Co. C: \My Documents \CityofCollegeStation WFV entrance deposit.doc 11/19/2002 11/19/2002 10:42 9797643496 COOS DEVELOPMENT SER PAGE 02/05 I - 19 - oz Z e r Date: I h Development Fl Engineer City of College Station Department of Development Services P.O. Box 9960 College Station, TX 77842 Re: Permit for Pxiv tc Imr_wments within City Right of Way (PIP) Development: 1t�, Dear Sir /Madam, To the fullest extent permitted by law, I /we, the owners of the property listed. below, shall indemnify, hold harmless, and. defend the City, its officers, agents, and employees from and against any and all claims, losses, damages, causes of action, suits, and liability of every kind, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or for any breach of contract, arising out of or in connection with the installation, operation and maintenance of the facilities authort • • by this permit. This indemnity shall apply regardless of whether such injurie , dc , th, dama • , or breach are caused in part by the negligence or omission Of t e ther party in.demnificd he.rcundcr, the Contractor, or any third pi rt., I( Signature of Owner: V ite:71 i76ti+- Narne of Property Owner: b3 f.)E1/ IW - 1 - 70' Legal Description of Property Owned STATE OF TEXAS CORPORATE ACKNOWLEDGMENT COUNTY OF ERAZOS ) This instrument was acknowledged, before me on the /9 day of Mever,,be ✓ 20(2 by _ sand y Gr €nCI in lain/her capacity an Pree,)L/ of & S 0EVC/Ur , a ?C)(4S corporation, nn hchalf of said corporation. & • JANE ANN GREGG ( j . Notary Public, State of Texas 1 Nor, Public in and for r6 ---s ( r My Commission Expires cl►c State of Texas ( .1 , ,a,' SEPTEMBER 17, 2004 ti LL _) 13(d0( 1- 2, 010 PL X113 L 'JD `�, The City of `� College Station, Texas Embracing the Past, Exploring the Future. P.O. Box 9960 • 1101 Texas Avenue • College Station, TX 77842 • (979) 764 -3500 www.ci.college-station.tx.us November 20, 2002 Mr. Randy French, President BCS Development Co. 4090 S. Highway 6 South College Station, TX 77845 Re: Westfield Village Entrance PIP (02 -213) Dear Randy, This letter should serve to clarify the nature of the $3000 cash deposit made for this application. At this time, City ordinance requires the posting of a financial guarantee for the possible removal of facilities authorized under the permit. The guarantee has no expiration and must remain in force until such time as the improvements are removed. However, due to some of the adverse impacts this requirement has on potential developments, Staff will be approaching Council in the next several months with revised wording that will limit or eliminate the guarantee requirement. When Council has acted on this issue, we will revisit the deposit made on this project and adjust or refund it to meet the revised ordinance. Thank you for your cooperation, and I look forward to your assistance in bringing this issue to Council for discussion and evaluation. Sin erely, Brett Mc ully, .E. Assistant City Engineer cc: Kelly Templin Planning File 02 -213 Home of Texas A &M University NOV. 1.5. 2ULL2 is Lii'r•1 h' 1/1 FROM : PRINCE IRRIGATION PHONE NO. : 979 774 0427 Prince Irrigation P. 0. Box 5188 Br TX 77805 Phone (979) 774 -4726 FAX (979) 774-0427 November 13, 2002 Stylecraft Builders ATTN: Bob Anderson RE: Clarification, Landscape Irrigation System —Westfield Village Entry Bob, This correspondence is in response to the fax 1 received from you earlier today concerning the proposed Landscape irrigation system at the Westfield Village entry. it appears the City of College Station staff is requiring clarification concerning the location of the irrigation mainline and valves. The drawing submitted 10/04/02 contains a statement addressing this issue. The statement is as follows: "Mainline and valves shown in street and hardseape areas for diagrammatic purposes only I believe this statement puts to rest any fears that the piping would be installed under the street. However, we will have no difficulty installing the mainline and valves at least (5') behind the back of the curb as requested by Mr. McCully. The advantages to this suggestion are obvious to us and we want to thank Brett for pointing this out at this stage; it makes things easier for all of us in the long run. Thank you for your time and interest In thls matter, and please let me know If I can be of further assistance. Sincerely, J. David Prince Texas licensed Irrigator #8707 1 CL. - 1 /3 It'-2 Q.3 C\n 1 October 15, 2003 Frank Simoneaux, P.E. i o ° i City of College Station — Public Utilities 9 1601 Graham Road �' c College Station, Texas 77840 m c cn C RE: Steeplechase/Wellborn Road Water Impact Fee Study Revisions = c o, ' E Dear Frank: aeS c = as ro c o Attached are the revisions to the Steeplechase /Wellborn Road Water Impact Fee c c g o :7) Study. The percentage of the average monthly water utility bill applied to the bond • w -- > CD _ o a — debt service for water projects in this area has changed to reflect current cost W 0 -o estimates. The new impact fee per LUE is $701.74. Please insert these pages into your report to replace previous calculations. Please let us know if you have any further questions or comments. w ui (a o; Sincerely, • L o y ri a ro 1 .4 Rebecca Riggs, EIT c Graduate Engineer o Attachments a cc: Carol Cotter N p Jane Kee Brett McCully File OC 'AZ O {N S:\Proj \0112- schaseimpactfee \docs \frank oct water revisions.doc W SA N IU r► H = d ^ 0 g 1‘1, gri Iksx In OIL a c v -i if /6 -E3 -C3 It C ruu t) October 15, 2003 ., — Frank Simoneaux, P.E. i a, •°' City of College Station — Public Utilities . ` AA 1601 Graham Road N O dot V .rn College Station, Texas 77840 `+ cc'"n c E c as RE: Steeplechase/Wellborn Road Water Impact Fee Study Revisions O Ica rn U = a c as ' E Dear Frank: ....= c Attached are the revisions to the Steeplechase /Wellborn Road Water Impact Fee c c g c N Study. The percentage of the average monthly water utility bill applied to the bond — w Q a > c v ,— debt service for water projects in this area has changed to reflect current cost W 0 _ �, a estimates. The new impact fee per LUE is $701.74. Please insert these pages into your report to replace previous calculations. W a Please let us know if you have any further questions or comments. C" W 63 0; Sincerely, D � O al • , o •Za 3 ra ri Rebecca Riggs, EIT 'c y Graduate Engineer 0 0 a a Attachments a, et cc: Carol Cotter N O Jane Kee Z S Brett McCully t i t • n File ct in 0 u S:\Proj \0112- schaseimpactfee \docs \frank oct water revisions.doc i‘ —.. W VI o ~* t0 in J Z1 w 3 eh N O la E 41,0 C � NIh ig ri = 5 -04 i )11G .9- H 3 /(, vim -C 3 I '1C , 2£ ) , - -1 1\& Ct.: () October 15, 2003 C c Frank Simoneaux, P.E. tot a, ° - ' City of College Station - Public Utilities p a a 1601 Graham Road = `0 C College Station, Texas 77840 c - '-g as RE: Steeplechase/Wellborn Road Water Impact Fee Study Revisions U = E �c oIS c ' ' Dear Frank: c — m i $ rnn- c = c Attached are the revisions to the Steeplechase/Wellborn Road Water Impact Fee c c 0 Study. The percentage of the average monthly water utility bill applied to the bond W __•y c •± ° a w debt service for water projects in this area has changed to reflect current cost W 0 = u, cn estimates. The new impact fee per LUE is $701.74. Please insert these pages into your report to replace previous calculations. W Please let us know if you have any further questions or comments. ui R a Sincerely, 01� O -t Q7 /, I l 6 (Y' ---- p /7) .-1 / ca ri ga ea m ri Rebecca Riggs, EIT ' � Graduate Engineer O n Attachments lJ v l cc: Carol Cotter j a. c N 0 Jane Kee a 34\p ataii-- 4 S Brett McCully ��� L7 3 N File OC in 0 ti (a S:\Proj \0112- schaseimpactfee \docs \frank oct water revisions.t 0 ~ s C i • - °g"' N O V C W al at = Vila Ill VI NM M u