Loading...
HomeMy WebLinkAboutMisc. AVERAGE ATTENDANCE AT KOREAN MISSION CHURCH OF TEXAS A &M YEAR NO. OF ATTENDANCE Total 1st Service 2nd Service (9:00 - 10:30) (11:00 - 12:30) 1984 28 0 28 1985 28 0 28 1986 44 0 44 1987 37 0 37 1988 52 0 52 1989 62 0 62 1990 69 0 69 1991 67 0 67 1992 68 0 68 1993 60 0 60 1994 65 0 65 1995 82 0 82 1996 89 0 89 1997 105 0 105 1998 128 0 128 1999 149 0 149 2000 170 20 150 2001 192 32 160 2002 215 38 177 ■ 1st Service • 2nd Service J 300 v c 200 co il a 0 o 100 Z 0 s 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 Year Notice of Proposed Installation Utility Line on Non - Controlled Access Highway 1023 (Rev 9-93) ious version(s) are obsolete.) To the Texas Transportation Commission Date 0 •b'3• Or2 c/o District Engineer 'Texas Department of Transportation , Texas Formal notice is hereby given that 1"43 C4 - 10 Company proposes to place a Wake,- (,;,A 4 -holi line within the right -of -way of i4u Co in r..3 -405, County, Texas as follows: (give location, length, d general design, etc.) ' n (� n n 'b,�.G'"' �c'mw'uG E Gree Pi"a� -,Fez co-••- co-••- - 4& lJ r R �atg2 �'C C-+ n c -0642 .�... r�� kz c.. t* ere - -eaµ M,:�ss�•- G1� .Q "T xa', -i. sC 'M, . We, ('..4012-' - a- ' s- l.#'sr ;Q►u� - �'O CAA- 4%A.• -- *" wtt.it 4-car L,k -e - 4�.,�►- .-.._ LA,- s The line will be constructed and maintained on the highway right -of -way as shown on the attached drawing and in accordance with the rules, regulations and policies of the Texas Department of Transportation (TxDOT), and all governing laws, including but not limited to the "Federal Clean Water Act," the "Federal Endangered Species Act," and the "Federal Historic Preservation Act." Upon request by TxDOT, proof of compliance with all governing laws, rules, and ulations will be submitted to TxDOT before commencement of construction. Our firm will use Best Management Practices to minimize erosion and sedimentation resulting from the proposed installation, and we will revegetate the project area as indicated under "Revegetation Special Provisions." Our firm will insure that traffic control measures complying with applicable portions of the Texas Manual of Uniform Traffic Control Devices will be installed and maintained for the duration of this installation. The location and description of the proposed line and appurtenances is more fully shown by complete sets of drawings attached to this notice. Construction of this line will begin on or after the lS day of e _a --•6� , 2001 By signing below, I certify that I am authorized to represent the Firm listed below, and that the Firm agrees to the conditions /provisions included in this permit. Firm _ 4 C wsir r Co �1 By (Print) 1-4 __ Signatur.0 — — Title _ 7 f GI - -___ Address P.0.16, - >c, Q Phone No. C 0090 377 ----- - -___- For in 1023 (Rev 0`1')3) (Previous Vers)orv. Obsolete) APPROVAL Hwy. No. Beg. RM Offset End RM Offset Maintenance Section No. Count\ Date 11e Texas Department of Transportation (ThDOT) offers no objection to the location on the right -of -way of your proposed w line as shown by accompanying drawings and notice dated except as noted below. It is expressly understood that the TxDOT does not purport, hereby, to grant any right, claim, title, or easement in or upon this highway: and it is further understood that the TxDOT may require the owner to relocate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. You are requested to notify this office prior to commencement of any routine of periodic maintenance which requires pruning of trees within the highway right -of -way, so that we may provide specifications for the extent and methods to govern in trimming, topping, tree balance, type of cuts, painting cuts and clean up. These specifications are intended to preserve our considerable investment in highway planting and beautification, by reducing damage due to trimming. e installation shall not damage any part of the highway and adequate provisions must be made to cause minimum inconveniences traffic and adjacent property owners. In the event the Owner fails to comply with any or all of the requirements as set fot - th ,lerein, the State may take such action as it deems appropriate to compel compliance. • General Special Provisions: • Revegetation Special Provisions: In order to minimize erosion and sedimentation resulting from the proposed installation, the project area will be revegetated [1 in accordance with TxDOT's Standard Specification Item 164 which specifics the appropriate grass seed mix to be used, of ❑ as indicated on the attachment. Please notify forty -eight (48) hours prior to starting construction of the line in order that we may have a representative present. Texas Department of Transportation By: - -- District Engineer -- District No. - -A" Permit to Construct Access Driveway Facilities on Highway hwa Ri of Wa y Form 1058 (Rev. 12 -96) v Previous versions are obsolete. To: Hwy. Permit No. Control Section The Texas Department of Transportation, hereinafter called the State, hereby authorizes hereinafter called the Grantee, to (re) construct an access driveway on the highway right of way abutting highway no. in ____ County, located Subject to the following: 1. The Grantee is responsible for all costs associated with the construction of this access driveway. 2. Design of facilities shall be as shown on sketch: All construction and materials shall be subject to inspection and approved by the State. 3. Maintenance of facilities constructed hereunder shall be the responsibility of the Grantee, and the State reserves the right to require any changes, maintenance, or repairs as may be necessary to provide protection of life or property on or adjacent to the highway. Changes in design will be made only with approval of the State. 4. The Grantee shall hold harmless the State and its duly appointed agents and employees against any action for personal injury or property damage sustained by reason of the exercise of this permit. 5. Except for regulatory and guide signs at county roads and city streets, the Grantee shall not erect any sign on or extending over any portion of the highway right of way, and vehicle service fixtures such as service pumps, vendor stands, or tanks shall be located at least 3.6 meters (12 feet) from the right -of -way line to ensure that any vehicle services from these fixtures will be off the highway. 6. This permit will become null and void if the above - referenced driveway facilities are not constructed within six (6) months from the issuance date of this permit. 7. The Grantee will contact the State's representative telephone ( ) _ at least twenty-four (24) hours prior to beginning the work authorized by this permit. Texas Department of Transportation Date of Issuance District Engineer The undersigned hereby agrees to comply with the terms and conditions set forth in this permit for construction of an access driveway on the highway right -of -way. Signed: .► , Lft ► ,i e....e_ ( rope ow er1 r or owns r sentta`iv1 • Date: 10 .03 .O2 L'tar� — — — �p 12/1 SAS I Engineering d Environmental S Consultants. Inc. C December 19, 2002 Ms. Spencer G. Thompson, Graduate Civil Engineer City of College Station Development Services 1101 Texas Avenue South P. O. Box 9960 College Station, Texas 77842 Re: Submittal of Grading and Drainage Drawings and Drainage Report Proposed Korean Mission Church of Texas A &M State Highway 6 Near Southern Plantation; College Station, Texas Dear Mr. Thompson: Transmitted via this letter are two copies of the grading and drainage plans and the drainage report for the proposed Korean Mission Church of Texas A &M which is to be located on the western side of State Highway 6 near Southern Plantation in College Station, Texas. Mr. Chad Grauke, project architect with Mike Land Customer Builder, the project developer, asked that we submit the accompanying documents as part of their request to obtain a grading permit for the site. The four submitted drawings that comprise the grading and drainage plans are of follows: DRAWING OR DRAWING OR SHEET SHEET NUMBER TITLE C -1 Site Grading and Drainage Plan C -2 Site Details C -3 Site Details C -4 Erosion Control Plan Please do not hesitate to call should any questions arise or if additional information is required. Kindest regards, a M. Frederick Conlin, Jr. P.E., JD Senior Engineer MFC:am Attachments via: Hand Delivery 3407 Tabor Road Phone (979) 778 -2810 - Bryan, Texas 77808 Fax (979) 778 -0820