Loading...
HomeMy WebLinkAboutStaff Comments COA119tAs Vitt Pv►. i6 ENGI ERING COMMENTS NO. 1 Please submit an Engineer's 41st Estimate, Letter of Aclywledgment, and ‘d01. Please revise the Water, Fire, and Sanitary Sewer Report to reflect the actual proposed fixture units, etc. in Phase 1 B. The Fire Flow needs to be calculated for the largest /building and based on the 2009 International Fire Code requirements. �/ FYI... Please submit an easement dedication application. CO will not be issued for this phase until the PUE is dedicated. . C -03 — Please label the isolation valves. C 3 — Please label all existing easements with volume and page number. -03 — Please revise the easement labeled "Sanitary Sewer" to "PUE." C -10 — Please label and move isolation valves at the edge of the PUE. -10 — Please label proposed fire hydrants. FDC�3 C -10 — Please verify that all i htves are within 150 -ft of a fire hydrant. C -10 — Around Sta.6 +00, the minimum TCEQ horizontal separation distance , needs to provided. O_X - 65 . 4ve- t f eh 6 ,! r `�'veu 1 � r . 1 C - 1 0 - FYI...It looks like several small end can pro 6 ably be removed and the pipe 0 straight or deflected. C -10/11 — Please note special provisions, per TCEQ, which need to be taken at v w ter /sanitary sewer crossings. I vt -`k . , ex.-- C j . Ni 1 WW1 j 1 - — Please label all bends or deflections in profile view. Meg, PaW1510 - 11 — Between approximate Sta. 3 +00 and 4 +75, the minimum 4 -ft bury depth is not ing met. 1 -11 — Please label all vertical separation distances at pipe crossings. 12 — Please indicate where the construction fencing will be located. 1 I City Standard Detail sheets need to be updated to the January 2009 version. The urrent details can be found on our website at: http: / /bcsunited.net. 1 . L -01 — FYI...It appears that a live oak is proposed to be less than 3 -ft from a storm sewer grate inlet. Although the inlet is private, it may cause maintenance issues in the future. Reviewed by: Erika Bridges Date: August 8, 2011 C1t ��' In& - \w it 6( c1 P Ction5. beeh 3 Ock led wl . i end ad. of c-ay. - k0v)CL %lab . * 11 re 1,DIA) -e)c) Q\16.1 4 qlikA) irr,J2c n-1. CITY OF COLLEGE STATION - e�xatcn Home of TexarAe1'M University' -- — --- 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 28, 2011 TO: Kevin Gaskey, P.E., Kimley-Horn and Associates, Inc via email: kevin.gaskev(c)kimley-horn.com ✓ A�, FROM: Matt Robinson, AICP, Senior Planner SUBJECT: CAMPUS VILLAGE PH 1B (SP) reviewed the above -mentioned SITE PLAN - RESIDENTIAL application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: Proof of signing authority for Kevin McGraw to sign the Owner Certification on page 4 of the application. Parkland dedication fees on page 3 of the application were left blank. Parkland fees will be due at time of building permit for Neighborhood Parkland acquisition and Community Parkland acquisition and development. Water Design Report and Fire Flow Report Please be aware that if this application is not completed before September 12, 2011, it will expire and a new application and fees will be necessary to continue the site plan process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Kevin McGraw via email: kmcgraw(a)caddisdev.com Richard Nordyke, O'Brien and Associates, via email: richard.nordyke(a.)obrienarch.com Ray Behling, via email: Behling.Ray(abcampusvillage.com Case file No. 11-00500116 7� 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CIIY OP COI.IYGE STATION f ,a AdMUnArc V MEMORANDUM August 8, 2011 I TO: Kevin Gaskey, Kimley-Horn & Assoctes, via email: �g Kevin.oaskey(a)kim ley -horn. com FROM: Jason Schubert, Senior Planner SUBJECT: Campus Village Ph I (SP) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached; Four (4) revised site plans; One (1) revised landscaping plan; Please note that $263,360 in Parkland Dedication fees will be due prior to the issuance of building permits; Easement Dedication Sheet and required documents; and Revised engineering documents as discussed in the comments. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Jason Schubert at 979.764.3570. Attachments: Staff review comments PC: Kevin McGraw, via email: kmorawCcilcaddisdev.com V Richard Nordyke, O'Brien & Associates, via email: Richard. nord ke obrieng h.corr / Ray Behling, Campus Village, via email: behling.ravCa�campusvillaoes.com Case file #11-00500116 STAFF REVIEW COMMENTS NO. 1 Project: Campus Village Ph 1 B (SP) — 11-00500116 PLANNING 1. The proposed site is deficient 66 parking spaces. Staff has received the associated Administrative Adjustment application and is processing the request. 2. The end of the 20-space parking row by Building 22 is too close to the multi -use path easement. With 18-foot deep spaces, there is to be a 4-foot deep landscape area outside of the path easement. If fire coverage to Building 22 is accomplished along the front, the width of the drive aisle stub could be reduced, and perhaps the fire lane removed, to help provide the additional area. 3. The parking spaces on the path -side of the fan parking area by Building 21 are 20 feet in depth. As such no overhang area is necessary, though wheel stops are to be provided in the center six spaces so that vehicles do not inadvertently overhang into the path easement. 4. The sidewalk by Building 17 along the main drive aisle is only 4.5 feet wide, and being a main drive aisle sidewalk must be at least 5 feet in width. 5. Provide a sidewalk and ramps to connect the sidewalk along the main drive aisle by Building 18 to the sidewalk by either Building 19 or Building 20. 6. Provide a sidewalk and ramp to connect the Building 5 sidewalk across the drive aisle to the Building 17 sidewalk. 7. It appears that some of the islands along the parking rows are entirely concrete. Island areas are to be majority landscaped or can be impervious if they consist of either brick pavers or enhanced paving (like stamped, dyed concrete). Please clarify the composition of the island areas on the plans. 8. Revise the symbol used for the fire hydrant so that it is more apparent on the site plan. 9. Note 6 on the site plan refers to a sun deck fencing detail on the landscape plan but it is not provided. Please revise to include the detail on either the site or landscape plan. 10. Provide a detail for the landscape wall. Reviewed by: Jason Schubert Date: August 8, 2011 LANDSCAPING/STREETSCAPING 1. The parking spaces along the Harvey Mitchell Pkwy right-of-way are to be screened with shrubs, berm, or combination of that are three feet in height. The landscape wall along the parking in Phase 1A provided the screening for that area. If necessary, provide elevation cross section to illustrate effect of screening. 2. Provide a note on the landscape plan that the caliper of non -canopy trees are measured so that a single cane exceeds the stated measurement. 3. The California Fan Palm and Hardy Hibiscus `Flare' plants are not on the approved plant list. While they can be planted, they do not receive landscape point credit. Please note that with this change, the minimum landscaping points are no longer met. Reviewed by: Jason Schubert Date: August 8, 2011 Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Page 2 of 4 ENGINEERING COMMENTS NO. 1 1. Please submit an Engineer's Cost Estimate, Letter of Acknowledgment, and NOI. 2. Please revise the Water, Fire, and Sanitary Sewer Report to reflect the actual proposed fixture units, etc. in Phase 1 B. The Fire Flow needs to be calculated for the largest building and based on the 2009 International Fire Code requirements. 3. FYI... Please submit an easement dedication application. CO will not be issued for this phase until the PUE is dedicated. 4. C-03 — Please label the isolation valves. 5. C-03 — Please label all existing easements with volume and page number. 6. C-03 — Please revise the easement labeled "Sanitary Sewer" to "PUE." 7. C-10 — Please label and move isolation valves at the edge of the PUE. 8. C-10 — Please label proposed fire hydrants. 9. C-10 — Please verify that all isolation valves are within 150-ft of a fire hydrant. 10. C-10 — Around Sta.6+00, the minimum TCEQ horizontal separation distance needs to be provided. 11. C-10 — FYI... It looks like several small bends can probably be removed and the pipe run straight or deflected. 12. C-10/11 — Please note special provisions, per TCEQ, which need to be taken at water/sanitary sewer crossings. 13. C-11 — Please label all bends or deflections in profile view. 14. C-11 — Between approximate Sta. 3+00 and 4+75, the minimum 4-ft bury depth is not being met. 15. C-11 — Please label all vertical separation distances at pipe crossings. 16. C-12 — Please indicate where the construction fencing will be located. 17. All City Standard Detail sheets need to be updated to the January 2009 version. The current details can be found on our website at: http://bcsunited.net. 18. L-01 — FYI ... It appears that a live oak is proposed to be less than 3-ft from a storm sewer grate inlet. Although the inlet is private, it may cause maintenance issues in the future. Reviewed by: Erika Bridges Date: August 8, 2011 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Some easements on site are existing. Electric facilities will be designed within existing easements. 2. Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines. 3. Any alterations or changes to electrical infrastructure design must have prior approval by CSU. Current site drawings (page E 2.00) do not match original design, and will not be accepted as submitted. 4. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes per CSU specs and design (pull boxes provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: sweido@cstx.gov 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: August 3, 2011 FIRE 1. FDC locations need to be shown on site plan. 2. No other comments at this time. Reviewed by: Eric Dotson Date: August 8, 2011 eF91Ni11I-M k 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: August 4, 2011 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 1, 2011 TO: Kevin Gaskey, P.E., Kimley-Horn a d Associates, Inc via email: kevi n.gaskev(a)ki mlev-horn. com FROM: Matt Robinson, AICP, Senior Planner SUBJECT: CAMPUS VILLAGE PH I (SP) This project will be distributed to staff this week for their review. Please be aware that additional items may be necessary after the first round of review comments. cc: Kevin McGraw via email: kmcgraw(a)caddisdev.com✓ Richard Nordyke, O'Brien and Associates, via email: richard.nordyke(a)-obrienarch.comv"� Ray Behling, via email: Behling. Rav(ocampusvillage.corn � Case file No. 11-00500116 �1 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITYOP COTLEcr; STATION Hmre<aR AdM lJxinersiry' MEMORANDUM August 30, 2011 TO: Kevin Gaskey, Kimley-Horn & Associates, via email: Kevin.oaskey(cDkimley-horn. coma/ FROM: Lauren Hovde, Staff Planner SUBJECT: Campus Village Ph 1 B- Site Plan Comments 2 Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $932 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Four (4) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan Easement dedication documents Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Kevin McGraw, via email: kmcoraw(ccaddisdev.com Richard Nordyke, O'Brien & Associates, via email: Richard. nordyke(a)obrienarch.com'✓ Ray Behling, Campus Village, via email: behling.ray o(i).campusvillage.com,--,� Case file #11-00500116 STAFF REVIEW COMMENTS NO. 2 Project: Campus Village Ph 1 B (SP) - 11-00500116 PLANNING 1. The Indian Hawthorn shrubs being used for screening are a maximum of 24" in height, as indicated on the plant ledger. The shrub planting detail does not show that the plants will be elevated in the ground to accomplish the 3' minimum height requirement for screening. Please revise. 2. The sidewalk next to Building 17 is labeled as 6' wide, but it appears to be 5'-5.5' wide. Please revise. 3. The written responses to the first round of Staff comments, which mention discussions with Jason Schubert, may be commented upon at a later time. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Lauren A. Hovde, Staff Planner Date: August 30, 2011 ENGINEERING COMMENTS NO. 2 1. The Development Permit Fee balance of $480.52 is due prior to issuance of the Development Permit. 2. (Repeat) C-10 — Around Sta.6+00, the minimum TCEQ horizontal separation distance needs to be provided. The waterline needs to cross the sanitary sewer line perpendicularly rather than diagonally in order to maintain the required 9-ft horizontal separation distance. 3. (Repeat) C-10/11 — Please note special provisions, per TCEQ, which need to be taken at water/sanitary sewer crossings. Please "star" the locations of these crossings. 4. (Repeat) C-11 — Please label all bends or deflections in profile view. The "Grade Breaks" need to be labeled with specific bend size or as deflections (with beginning & end flowlines and radius of curvature). 5. Fire Flow Report — The fire flow exhibit needs to show and label the proposed fire hydrant with this new section. Reviewed by: Erika Bridges Date: 8/29/11 ELECTRICAL COMMENTS #2 REQUIRING IMMEDIATE ATTENTION 1. Some easements on site are existing. Electric facilities will be designed within existing easements. 2. Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines. 3. Any alterations or changes to electrical infrastructure design must have prior approval by CSU. 4. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS #2 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 5. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 6. Developer installs pull boxes per CSU specs and design (pull boxes provided by CSU). 7. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: sweido@cstx.gov 8. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 9. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 10. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: August 24, 2011 FIRE 1) No other comments at this time. Reviewed by: E. Dotson Date: 8/25/2011