HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION
CITY ENGINEER DATE: _ - _ a_
CITY OF COLLEGE STATION C ��C S � /
COLLEGE STATION, TEXAS
RE: COMPLETION OF Wwkr
and serut -e5 P /o5& 2R
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WARRANTY DATE
_1.1.1429M1 ET'
a y. tNi(c ,rt
Fire_ ttt
Owner: CV CS1 g t LL e.- Contractor: On Ore, C /) 1 7L/ •»✓�
Phone Number :(s17) ?03 -213x- Phone Number: .11
Address: 1 15W) N .‘t0 Address: 3 716 RCV in 4
4fra to m I q ` 9b (o 5 i, /5/0 Da.�/ci 5 Yak ct,s
75;.2/
Signatu atu; ='� 14 Signature: 2 oh..A
Of LA.. T. ✓ / <Livt4W s/ . 'R
ACCEPTA CE APPROVAL
CI Representative
i ty
nginee ti> PLAT FLED
i
Revised 1/31/07 4:22. ESMTS FILED
�L .�TEM EMT P BLANKET ET FILED
!LW OTHER ESMTS NEEDED
Kimley -Horn
❑ and Associates, Inc.
updated: 08 /17/2011
Public Utility - Water Main Cost Estimate
Preliminary Water Main Opinion of Probable Construction Cost
Project Information
Name: Public Utility Water Main for Campus Village Phase 1B
Limits: 8" Water Main - From Existing 8" Water Main to Existing 8" Water Main
City: College Station
Construction Cost Projection
Item Description Notes: Quantity Unit Unit Price Item Cost
8" C909 PVC WATERMAIN w/ STRUCTURAL BACKFILL 682 If $ 80.00 $ 54,560
6" C909 PVC WATERMAIN w/ STRUCTURAL BACKFILL 164 If $ 75.00 $ 12,300
4" C909 PVC WATERMAIN w/ STRUCTURAL BACKFILL 60 If $ 70.00 $ 4,200
FIRE HYDRANT WITH 6" LEAD 1 ea $ 2,300.00 $ 2,300
FITTINGS (1 ton /500 L.F.) 2 ton $ 3,500.00 $ 6,342
8" GATE VALVE 1 ea $ 1,200.00 $ 1,200
6" GATE VALVE 5 ea $ 1,000.00 $ 5,000
4" GATE VALVE 6 ea $ 850.00 $ 5,100
2" DOMESTIC METER 7 ea $ 2,150.00 $ 15,050
CONNECT TO EXISTING WATERMAIN 2 ea $ 1,000.00 $ 2,000
Pre - Allowance Subtotal: $ 108,052
Project Cost Summary
Item Description Notes: Item Cost
Project Construction Subtotal: $ 108,052
Total Project Cost: $ 108,052
The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods
of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are
based on the information known to Engineer at this time and represent only the Engineer's judgment as a design
professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals,
bids, or actual construction costs will not vary from its opinions of probable costs.
O F .`"t
�• •? ,�
* : .......... \ am * ,I
KEVIN SCOTT GASKEY
—0 ..... .. .............. /�