HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION CITY ENGINEER DATE: _ - _ a_ CITY OF COLLEGE STATION C ��C S � / COLLEGE STATION, TEXAS RE: COMPLETION OF Wwkr and serut -e5 P /o5& 2R Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by and by their subcontractors as indicated by signatures below. WORK COMPLETED WARRANTY DATE _1.1.1429M1 ET' a y. tNi(c ,rt Fire_ ttt Owner: CV CS1 g t LL e.- Contractor: On Ore, C /) 1 7L/ •»✓� Phone Number :(s17) ?03 -213x- Phone Number: .11 Address: 1 15W) N .‘t0 Address: 3 716 RCV in 4 4fra to m I q ` 9b (o 5 i, /5/0 Da.�/ci 5 Yak ct,s 75;.2/ Signatu atu; ='� 14 Signature: 2 oh..A Of LA.. T. ✓ / <Livt4W s/ . 'R ACCEPTA CE APPROVAL CI Representative i ty nginee ti> PLAT FLED i Revised 1/31/07 4:22. ESMTS FILED �L .�TEM EMT P BLANKET ET FILED !LW OTHER ESMTS NEEDED Kimley -Horn ❑ and Associates, Inc. updated: 08 /17/2011 Public Utility - Water Main Cost Estimate Preliminary Water Main Opinion of Probable Construction Cost Project Information Name: Public Utility Water Main for Campus Village Phase 1B Limits: 8" Water Main - From Existing 8" Water Main to Existing 8" Water Main City: College Station Construction Cost Projection Item Description Notes: Quantity Unit Unit Price Item Cost 8" C909 PVC WATERMAIN w/ STRUCTURAL BACKFILL 682 If $ 80.00 $ 54,560 6" C909 PVC WATERMAIN w/ STRUCTURAL BACKFILL 164 If $ 75.00 $ 12,300 4" C909 PVC WATERMAIN w/ STRUCTURAL BACKFILL 60 If $ 70.00 $ 4,200 FIRE HYDRANT WITH 6" LEAD 1 ea $ 2,300.00 $ 2,300 FITTINGS (1 ton /500 L.F.) 2 ton $ 3,500.00 $ 6,342 8" GATE VALVE 1 ea $ 1,200.00 $ 1,200 6" GATE VALVE 5 ea $ 1,000.00 $ 5,000 4" GATE VALVE 6 ea $ 850.00 $ 5,100 2" DOMESTIC METER 7 ea $ 2,150.00 $ 15,050 CONNECT TO EXISTING WATERMAIN 2 ea $ 1,000.00 $ 2,000 Pre - Allowance Subtotal: $ 108,052 Project Cost Summary Item Description Notes: Item Cost Project Construction Subtotal: $ 108,052 Total Project Cost: $ 108,052 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. O F .`"t �• •? ,� * : .......... \ am * ,I KEVIN SCOTT GASKEY —0 ..... .. .............. /�