10/09/2002 15:17 FAX 9792603564 MITCHELL and MORGAN Li001 /003
1
� ITCHELL&MORGAN, LLP
ENGINEERS & CONSTRUCTORS
511 UNIVERSITY DRIVE, SUITE 204
COLLEGE STATION, TEXAS 77840
OFFICE (979) 260 -6963
• FAX (979) 260 -3564
FACSIMILE TRANSMITTAL SHEET
TO: FROM:
Spencer Thompson Veronica Morgan
COMPANY: DATE:
COCS 10 -9 -02
FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER:
764 -3496 3
PHONE NUMBER: SENDER'S REFERENCE NUMBER:
RE: YOUR REFERENCE NUMBER:
Jim Stewart Condos
URGENT ❑ FOR REVIEW ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE
NOTES /COMMENTS:
PLEASE forward to Spencer ASAP.
Thanks,
Veronica J.B. Morgan, PE
,10/09/2002 15:17 FAX 9792603564 MITCHELL and MORGAN a 002/003
Oct 09 02 05:11p Mastertouch Custom Homes (817)429 -8664 p.1
WATERWOOD - PHASE 1 - 75 UNITS
A Gated Townhome Community
College Station, Texas
Cost & Profit Projections
Proiect Costs Total 3 Bdrm Unit Total 3 Bd 4 Bdrm Unit Total 4 Bd Unit
Cost Cost Unit Cost Cost ost
Number of Units 75 4I a
Ac & Development Costs
Land Cost 485,000 6,467 303,933 6,467 181,067
Site Preparation 41,600 555 26,069 555 15,531
Off -Site Improvements
Water /Sewer /Drainage 217,500 2,900 136,300 2,900 81,200
Paving 296,250 3,950 185,650 3,950 110,600
Building Pads 45,000 600 28,200 600 16,800
Underground Electric 7,500 100 4,700 100 2,800
Development Mgmt Fee 106,125 1,415 66,505 1,415 39,620
Engineering /Surveying 65,000 867 40,733 867 24,267
City Fees
Park Dedication Fees 34,500 460 21620 460 12,880
Miscellaneous Fees 26,250 350 16,450 350 9,800
Financing Costs
Origination 12,000 160 7,520 160 4,480
Closing Costs 6,000 80 3,760 60 2,240
Interest Carry 40,000 533 25,067 533 14,933
Miscellaneous Costs
Legal Fees 10,000 133 6,267 133 3,733
Accounting Fees 5,000 67 3,133 67 1,867
Taxes 30,000 400 18,800 400 11,200
Contingency 35,000 467 21,933 467 13,067
Sub -Total A & D Costs 1,462,725 19,503 916,641 19,503 546,084
Building Costs
Total Slab Square Footage 770 770
Total Square Footage Under Roof 1,347 1,540
Total Square Footage Living Area 1,318 1,511
HVAC 239,000 3,000 141,000 3.500 98,000
Appliances 67,500 900 42,300 900 25,200
Cabinets 187,500 2,500 117,500 2,500 70,000
Counters -Bath 32,800 400 18,800 500 14,000
Counters -Kit 60,000 800 37,600 600 22,400
Superintendent Salary 75,000 1,000 47,000 1,000 28,000
Drywall - Hang/Texture 234,602 2,966 139,402 3,400 95,200
Electric 208,508 2,636 123,892 3,022 84,616
Final Clean 26,094 330 15,510 378 10,584
Waterwood - Phase 1 - 75 Units
X 10/09/2002 15:17 FAX 9792603564 MITCHELL and MORGAN 0 003/003
• Oct 09 02 05:12p Mastertouch Custom Homes (817)429 -8664 p.2
WATERWOOD - PH 2 - 113 UNITS
A Gated Townhome Community
College Station, Texas
Cost & Profit Pr
Protect Costs Total 3 drm n 01st 3 Bd 44 nn Unit T ta14 d Unit
Cost Cost art Cost
COST gsg
Number of Units Ill
73 41
Acquisition & Development Costs
Land Cost
550,000
Site Preparation 4,741 346,121 4,741 203,679
27,700 239 17,432 239
Off•Site Improvements 160,000 10,3
1,379 100,690 1,379 59,310
0
Water /Sewer /Drainage 336,400
Paving 2,900 211,700 2,900
466,050 124,700
Building Pads 4,018 293,290 4018 172,760
69,600 600 43,800 600
Underground Electric 11,600 24,300
Development Mgmt Fee 100 7,300 100 4,300
164,024 1,414 103,222 1,414 2
302 22,026 302 1
Engineering /Surveying 35,000 12,974
City Fees 0 2,974
Park Dedication Fees 53,360 0
Miscellaneous Fees 460 33,580 460 f e 780
40,600 350 25,550 356
Financing Costs 15,050
Origination 10,000 86 6,293
Closing Costs 86 3,707
6,000 52 3,776 ,
Interest Carry 65,000 52 2,224
560 40,905 560 24095
Miscellaneous Costs 0
Legal Fees 0 0 0
5,000 43 3,147 43
Accounting Fees 10,000 1,707
Taxes 86 6,293 86 3,707
40,000 345 25,172
Contingency 55,000 345 14,828
474 54612 474 20,388
Sub -Total A & D Costs 2,105,334 18,149 1,324,909 18,149
780,428
Building Costs
Total Slab Square Footage 770
770
Total Square Footage Under Roof 1,347
Total Square Footage Living Area 1,5
1,318 1,511
HVAC 369,500 3,000 219,000
Appliances 104,400 3,500 150,500
Cabinets 900 65,700 �,700 900 38,700
290,000 2,500 182,500 2,500
Counters -Bath 50 400 700 121,500
Counters -Kit 92800 29,200 500 21,500
800 58,400 800 34400
Superintendent Salary 116,000 1,000 73,000
Drywall - Hang/Texture 3,400 1,000 46,
362,718 2,966 216,518
Electric t 46,200
322,374 2,636 192,428 3,022 129,946
Final Clean 40,344 330 24,090
378 16,254
Waterwood - Phase 2 - 116 Units
October 6, 2002
City of College Station
Development Services
1101 Texas Avenue South
;; College Station, TX 77840
3'.F . Attn: Bridgette George
E
o = a- Z Re: Resubmittal for the E. &M Jones Farm Place
=Y1n
40 m Dear Bridgette:
c 4 °1 v
V = g g . As per the City's comments attached please find ten copies of the revised
0 o, V °' preliminary plat. We would request that we submit a mylar once all approvals
E have been made so that the mylar can reflect all comments and conditions. If this
•— fd is not acceptable please let us know and we will prepare an original mylar. We
C w a •°-' C have also sent the digital file for this preliminary plat to Nanette Manhart.
c 5 co
W U D I S a. As per the comments:
Q 1. Staff requested that Lot 1 be modified to allow only 50 lots to be developed on
the lot.
u.i Al. Because of rear and side setbacks for each lot, we would request that the lot
o: ui sizes and configurations remain the same. This will allow us to have the most
e ._ a efficient use of these setback areas. We would prefer that the maximum 50 units
al . — be controlled through site plan phasing approvals on the property. We have more
O a s a`3 than half the property remaining to pay for the construction of Central Park Lane.
v
Looking at our development costs, this is sufficient to support the construction of
tti • f a this thoroughfare.
v ri
v X
C CU Q2. Please call out the lot line information for the far most western boundary.
•...
c ^
O A2. Done.
a)
> Q3. Please show ROW information for Krenek Tap.
A3. Done.
a
N 0 Q4. It appears that Lots 3 and 4 need a sewer line extension because the sewer on
Z g the north boundary may be too shallow.
a N N A4. We have shown another sewer line along Krenek Tap Road to serve these lots.
ct
H
a
g m Q5. Has this pre -plat been to the Park Board for review?
1‘ p A5. No, we have prepared an application but it has not yet been submitted to
Parks.
N pp
ur N
_ _ � 3
ri I Al
o+
Q6. Where does the waterline at Krenek Tap tie into the system?
A6. There is an existing 6 -inch waterline that connects the 8 -inch waterline along
the south side of KTR to a fire hydrant on the north side of KTR at our property.
We intend to utilize this 6 -inch line and tie on to it and relocate the fire hydrant as
a lead off of this new line.
Q7. Please check the parkland dedication fee amount.
A7. Yes, the parkland dedication fee should be as follows:
194 units x $452 /unit = $87,688
This difficulty arose because the blank on the digital application form does not
provide for the two amounts, one for single family and one for multi - family. It
only addresses the single family fee.
Q8. Please indicate zoning boundaries and include conditions for the C -B.
A8. Done.
Q9. Please indicate the proposed land uses.
A9. Done.
Q10-17. Miscellaneous electrical comments.
A10 -17. Noted.
Q18. Please provide a 20' easement along KTR and SH6.
A18. Done.
We hope this has answered all of your questions and comments. As always, please
do not hesitate to call if you have any questions.
' A
ii ,„ ,__._.__
Veronica J.B. o rgan, P .' .
Managing Partner
Cc: Thomas M. Madison
Stephen A. Madison
Jim Stewart
File
Attachments
Tammy Macik - PDMT: 14 acres on Krenek Tap: Veronica Morgan from R 1toR 4: 260-6963 Page 1
From: Tammy Macik
To: Pre D Group
Date: 08/26/2002
Time: 2:00:00 PM - 3:00:00 PM
Subject: PDMT: 14 acres on Krenek Tap: Veronica Morgan from R- 1toR -4: 260 -6963
Place: DSCR
Thanks,
Tammy Macik < ><
Secretary
City of College Station
—979- 764- 6254--
Negativity steals from you
what could be the good things of life.
Stewart Condominiums
Agenda
8 -26 -02
1. Platting - to discuss the necessity of platting the property based upon deed research.
a. If platting will be required. Informing staff we would be running site planning concurrently.
b. If platting, where Lot 1 vs. Lot 2 lines would be located.
2. Phasing of project.
a. Verification from staff that the phase lines as drawn are ok.
b. Verification that CPL will not be required until phase 3.(especially based upon discussion
with #1 above)
3. Site Layout
a. general layout is approvable based upon full compliance with all setbacks /parking
— dimensions, turning radii, etc.
b. Two front buildings on KTR can be constructed using KTR as the fire lane. i.e. parking and
internal fire lane can be constructed concurrently.
4. Project timeline (Platting and Site Planning)
/ 013 I
I i t
046 aocee g , ,1
ae
4
97
I
4,0/uel& /1/042'4A/ di 7y1-• ad; 1(e
J 4 ac4 !�
08/21/2002 15:43 FAX 9792603564 MITCHELL and MORGAN 001 /002
A lTCHELL & ORGAN, LLP
ENGINEERS & CONSTRUCTORS
511 UNIVERSITY DRIVE, SUITE 204 TDMX
COLLEGE STATION, TEXAS 77840 �i „
r Vl
OFFICE (979) 260 -6963
FAX (979) 260 -3564
FACSIMILE TRANSMITTAL SHEET
TO: FROM:
Tammy Veronica J.B. Morgan
COMPANY: DATE:
City of College Station 8/21/02
FAX NUMBER; TOTAL NO. OF PAGES INCLUDING COVE.
764 -3496 2
PHONE NUMBER: SENDER'S REFERENCE NUMBER
RE: YOUR REFERENCE NUMBER:
Krenek Tap Tract
❑ URGENT ❑ FOR REVIEW ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE
NOTES /COMMENTS;