HomeMy WebLinkAboutCost Estimate Carroll Addition Engineer's Opinion of Probable Construction Cost ABEI No. 1044001 September 23, 2002 The following construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes our best judgement at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. Item Description Estimated Estimated ESTIMATED No. Quantity Unit Cost TOTAL COSTS 1.00 STREET 1.01 50' R.O.W. Preparation (includes 962 LF $14.00 $13,468 clearing and grubbing, cutting to rough grade, etc.) 1.02 60' R.O.W. Preparation (includes 320 LF $16.50 $5,280 clearing and grubbing, cutting to rough grade, etc.) 1.02 6" Lime Modified Subgrade (includes 5,092 SY $1.25 $6,365 subgrade preparation and incorporation of lime into subgrade.) 1.03 Lime for Stabilization (5% by weight) 51 TN $100.00 $5,100 1.04 Curb and Gutter 2,600 LF $7.50 $19,500 1.05 6" Crushed Rock Base (Flexible Base) 5,092 SY $6.50 $33,098 TxDOT Type A, Grade 2 1.06 2" Hot Mix Asphaltic Concrete 4,237 SY $6.00 $25,422 TxDOT Type D (includes prime coat) Subtotal Item 1.00 Streets: $108,233 2.00 WATER 2.01 6 "e AWWA C900 Class 200 PVC Pipe 866 LF $8.00 $6,928 (includes installation, testing, and cleanup.) Non - structural 2.02 12 "e AWWA C900 Class 200 PVC Pipe 260 LF $12.00 $3,120 (includes installation, testing, and cleanup.) Non - structural Carroll Addition Estimate - Page 1 of 3 Item Description Estimated Estimated ESTIMATED No. Quantity Unit Cost TOTAL COSTS 2.03 12 "e AWWA C900 Class 200 PVC Pipe 57 LF $20.00 $1,140 (includes installation, testing, and cleanup.) Structural 2.04 Single Near Side Service 2 EA $100.00 $200 2.05 Double Near Side Service 5 EA $100.00 $500 2.06 Double Far Side Service 9 EA $200.00 $1,800 2.07 6" Gate Valve (includes installation and 2 EA $500.00 $1,000 cleanup.) 2.08 2" Blow -Off Valve Assembly With Valve 1 EA $750.00 $750 Box (includes installation and cleanup.) 2.09 DI Fittings (includes installation and 1.0 TN $4,200.00 $4,200 cleanup.) 2.10 Fire Hydrant Assembly (includes 1 EA $2,000.00 $2,000 installation and cleanup.) Subtotal Item 2 - Water: $21,638 3.00 SEWER 3.01 8 "e SDR 26 PVC ASTM D3034 Sewer 1,116 LF $8.50 $9,486 Line (includes installation, testing, and cleanup.) 3.02 8 "e SDR 26 PVC ASTM D2241 Sewer 18 LF $9.25 $167 Line (includes installation, testing, and cleanup.) 3.02 0 - 5' Trenching & Backfill - Non- 39 LF $8.00 $312 Structural (includes backfill and cleanup) 3.03 5' - 8' Trenching & Backfill - Non- 952 LF $10.00 $9,520 Structural (includes backfill and cleanup) " 3.04 5' - 8' Trenching & Backfill - Structural 120 LF $14.00 $1,680 (includes backfill and cleanup) 3.05 8' - 10' Trenching & Backfill - Non- 23 LF $18.00 $414 Structural (includes backfill and cleanup) 3.06 Single Far Side Service 6 EA $600.00 $3,600 3.07 Double Near Side Service 6 EA $800.00 $4,800 3.08 Double Far Side Service 6 EA $1,000.00 $6,000 3.09 Trench Safety 1,095 LF $1.00 $1,095 Carroll Addition Estimate - Page 2 of 3 Item Description Estimated Estimated ESTIMATED No. Quantity Unit Cost TOTAL COSTS 3.10 4' Standard Manhole (0 - 6' Deep) 4 EA $1,750.00 $7,000 (includes installation, testing, and cleanup.) 3.11 Additional depth for 4' dia. Standard 2 VF $100.00 $200 manhole 3.12 Cleanouts 1 EA $300.00 $300 Subtotal Item 3 - Sewer: $44,574 4.00 DRAINAGE 4.01 2' Pilot Channel 100 LF $8.00 $800 4.02 10' Drainage Channel 55 LF $35.00 $1,925 4.03 10' Inlet Box 1 EA $3,500.00 $3,500 4.04 Stone Riprap 4 CY $75.00 $300 Subtotal Item 4 - Drainage: $6,525 5.00 MISCELLANEOUS 5.01 Silt Fence 310 LF $4.00 $1,240 5.02 6' Sidewalk 1,505 LF $15.00 $22,575 5.03 Sidewalk Ramp Type 1 3 EA $150.00 $450 Subtotal Item 5 - Miscellaneous: $24,265 TOTAL PROJECT COST: $205,235 A Prepared b . / /i i . ,%, . Dale Browne Jr., •.E. t, ..... Ash & Browne Engineering t t - o• , 81890 ..4 t1 '�c�'•f'G /STE.. � 4 a 1 r t ``‘ ..LN Carroll Addition Estimate - Page 3 of 3