Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Development Permit Application
FOR NO.: OFFICE USE ONLY CASE . DATE SUBMITTE ⢠0/ io " I CITY OF COI .I.EGF: STATION TIME: Home of News A&M University` STAFF: AL DEVELOPMENT PERMIT APPLICATION MINIMUM SUBMITTAL REQUIREMENTS: © $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. © Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Date of Optional Preapplication or Stormwater Management Conference NIA SPECIAL FLOOD HAZARD AREA? n Yes © No (Zone A or Zone AE on FEMA FIRM panels) NAME OF PROJECT College Station Southwood Subdivision ADDRESS 1815 Brothers Blvd., College Station, Texas 77842 LEGAL DESCRIPTION (Lot, Block, Subdivision) APPLICANT / PROJECT MANAGERS INFORMATION (Primary contact for the project): Name Joe Grasso, P.E., Doucet & Associates, Inc. E - mail /oe.grasso @doucet- austin.com Street Address 7401B Highway 71 West, Suite 160 City Austin State Texas Zip Code 78735 Phone Number 512 - 583 - 2636 Fax Number 512 583 - 2601 PROPERTY OWNER'S INFORMATION: Name Wal -Mart Real Estate Business Trust & Walmart TRS, LLC E - mail gerald.taylor@wal- mart.com Street Address 2001 SE 10th Street, #0550 City Bentonville State AR Zip Code 72716 -0550 Phone Number 479 - 204 - 2161 Fax Number 479 - 273 - 4107 ARCHITECT OR ENGINEER'S INFORMATION: Name Joe Grasso, P.E., Doucet & Associates, Inc. E - mail 1oe.grasso @doucet austin.com Street Address 7401B Highway 71 West, Suite 160 City Austin State Texas Zip Code 78735 Phone Number 512 - 2636 Fax Number 512 583 - 2601 10/10 Page 1 of 4 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. ⢠5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all.necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited In city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer far the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to ā , (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURAT f\ 4M\cā n Property Owner(s) I Date R Engineer Certification: property Owner Date 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOl and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed In accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. 1, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Engineer Date 10110 Page 5of9