Loading...
HomeMy WebLinkAboutCorrespondence Page 1 of 1 Matt Robinson - SPRING CREEK TERRACE PHASE ONE FINAL PLAT REVISIONS From: "Michael G. Hester, P.E." <mhester @hester - engr.com> To: "Matt Robinson, CoCS Development Services Dept." <mrobinson @cstx,gov> Date: 6/28/2011 11:09 AM Subject: SPRING CREEK TERRACE PHASE ONE FINAL PLAT REVISIONS Attachments: 6 -28 -11 SCT Final.pdf Matt, find attached the revised Final Plat. Along the north and south side I have changed it from a PUE to a 20 -foot PUE & Private Drainage Easement & added note 11 to each lot. And I have widened out the common area / access way at the 60 -foot BTU easement, this will help to keep fences out of most of the BTU easement. The plat was approved by the P &Z recently. Please look it over and call. Thanks Michael G. Hester, P.E. Hester Engineering Company #f -3476 7607 Eastmark Drive, Suite 253 -B College Station, Texas 77840 979 - 693 -1100 mhester @hester - engr.com files•/ /r. \Tlnrnmantc and Settinac \mrnhinenn \T.non] Settinoc \Tema \YParnwice \4FIlATIMFP. 7/1 R /7n1 1