HomeMy WebLinkAboutCorrespondence Page 1 of 1
Matt Robinson - SPRING CREEK TERRACE PHASE ONE FINAL PLAT REVISIONS
From: "Michael G. Hester, P.E." <mhester @hester - engr.com>
To: "Matt Robinson, CoCS Development Services Dept." <mrobinson @cstx,gov>
Date: 6/28/2011 11:09 AM
Subject: SPRING CREEK TERRACE PHASE ONE FINAL PLAT REVISIONS
Attachments: 6 -28 -11 SCT Final.pdf
Matt, find attached the revised Final Plat.
Along the north and south side I have changed it from a PUE to a 20 -foot PUE & Private Drainage
Easement & added note 11 to each lot.
And I have widened out the common area / access way at the 60 -foot BTU easement, this will help to
keep fences out of most of the BTU easement.
The plat was approved by the P &Z recently.
Please look it over and call.
Thanks
Michael G. Hester, P.E.
Hester Engineering Company #f -3476
7607 Eastmark Drive, Suite 253 -B
College Station, Texas 77840
979 - 693 -1100 mhester @hester - engr.com
files•/ /r. \Tlnrnmantc and Settinac \mrnhinenn \T.non] Settinoc \Tema \YParnwice \4FIlATIMFP. 7/1 R /7n1 1