HomeMy WebLinkAboutSTAFF COMMENTS CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
September 18, 2002
TO: Greg Taggart, Municipal Development Group, Via fax 693 -4243
Lenwood Adams, Municipal Development Group, Via fax 693 -4243
FROM: Bridgette George, Assistant Development Manager
SUBJECT: SOUTHWOOD ESTATES (PP) - Preliminary Plat
Staff reviewed the above - mentioned preliminary plat as requested but had to stop
review due to an incomplete submittal. The following page is a preliminary list of staff
review comments detailing items that need to be addressed. Please address the
comments and submit the following information by an established deadline to be
scheduled for an established deadline:
Two (2) copies of the revised preliminary plat.
If you have any questions or need additional information, please call me at 764 -3570.
Attachments: Staff review comments
cc: Salim Ismail, Texas Hotel Management Corporation, Via fax 764 -9601
Case file #02- 00500196
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 1
Project: SOUTHWOOD ESTATES (PP) - 02- 00500196
This is a STOP REVIEW. This plat submittal does not meet minimum
requirements as set forth by City Ordinances. The following comments do not
constitute a full review, but are provided for guidance.
ENGINEERING
1. Plat does not show required streets as shown on the City's Thoroughfare Plan.
Please see Subdivision Regulations for compliance. Please discuss connection with
Rock Prairie Road with Development Services Engineering.
2. Please re -label block to account for Lots 1 thru 24 in the center.
3. This property is in the 92 -01 Sewer Impact Fee Area. This property is required to
take sewer from the Impact Fee line along Lick Creek. If you are seeking to change
this distinction, you may petition City Council.
4. At least one water main connection will be from the 12" line in Arnold Road.
5. Please be aware that City records show that the sewer line on the Med property is
closer to Southwood Estates than the water line. In other words, reversed from
what is shown on the plat.
6. Why the 20' easement on the front and rear of lots? Will proposed utilities not fit in
the remaining ROW? It is not apparent that you need 20' easements except
between abutting lots.
7. Please show setbacks. There are several lots that may not meet minimum lot width.
If a variance is required, it must be stated on application.
8. Has this plat been reviewed by the Park's Board regarding dedication?
9. Please show required sidewalks.
10. Please add note that detention facility to be owned and maintained by HOA or
owner.
11. Please see Subdivision Regulations, Table 1 and Note 6 for minimum horizontal
radius allowed for residential street.
Reviewed by: Spencer Thompson Date: September 17, 2002
ELECTRICAL
1. Developer installs conduit as per city specs and design.
2. Developer installs street lighting as per city specs and design.
3. Developer provides temporary blanket easement for construction purposes.
4. Developer provides digital of plat and /or site plan for AutoCAD 14. Email to
rbolinci .college - station.tx.us.
5. Developer provides easements for electric infrastructure as installed (including
street lighting).
6. Upon completion of project surveyed sealed meets and bounds descriptive
easements are necessary to release temporary blanket easement.
Reviewed by: Ronnie Bolin
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
2 of 2