HomeMy WebLinkAboutStaff Report ( .......
CITY OF COLLEGE STATION
FINAL PLAT
for
Creek Meadows Section 2 Phase 3
11- 00500092
SCALE: 41 Tots and 2 Common Areas on 7.41 acres
LOCATION: 15550 Creek Meadow Boulevard North
ZONING: PDD Planned Development District
APPLICANT: RME Consulting Engineers
PROJECT MANAGER: Lauren A. Hovde, Staff Planner
lhovde @cstx.gov
RECOMMENDATION: Approval
Planning and Zoning Commission Meeting Page 1 of 4
November 3, 2011
a
o
cNi
i t''''' .
c,
��pg N
'fit s " +''» V
Asa
.,,,.� �� a.
• 1s3, 0.1 4/
„ * . c 114.. A j Fa /� N
KER B ° J . am w ........,....,
BM A KE EAW? � „... .,
D ° U'
a rt 5 0
COY '"� .. '# �' o C , ” �3' +A M*° , W
el' /
Q O� � j � � y e ' , 2 Y. j � � � '. / ..,
may_ i e R F J + ?
� � r';': � ;� c�Q� � �i' � b �" � `� �
3
al
Lil
,.�. ❑
( ¢f i
k i liqH\7 2 ., , ; I ;,.'4 1.3\/ •.____-,.' --- - . odii , ;,,,giot .
neW It:
Page 2 of 4
Planning and Zoning Commission Meeting
November 3, 2011
DEVELOPMENT HISTORY
Annexation: March 2008
Zoning: PDD Planned Development District (2008)
A -O Agricultural Open (2008)
Preliminary Plat: Creek Meadows Subdivision — 2006. The Preliminary Plat was
revised in January 2008, September 2008, November 2008, and
January 2009.
Site Development: Vacant
COMMENTS
Water: Water service will be provided by Wellborn Special Utility District.
Sewer: The Creek Meadows project included the construction of a lift station and
extension of a public force and gravity main to serve the area. This
infrastructure has already been constructed and accepted by the City.
Streets: The internal local street is the continuation of Baker Meadow Loop, previously
platted with Creek Meadows Section 2 Phase 1 B.
Off -site
Easements: N/A
Drainage: The property is located within the Peach Creek Drainage Basin. Drainage is
generally to the south.
Flood Plain: There is no FEMA regulated floodplain located on the property.
Oversize
Request: N/A
Parkland
Dedication: This project began developing in 2006 in the ETJ prior to the requirement of
parkland dedication in the ETJ. No parkland dedication is required for the
proposed final plat.
Bicycle
Connectivity: There are no bike facilities required or proposed within or abutting this phase of
the development.
Impact Fees: N/A
Greenways: There are no Greenways identified for this property and therefore no
Greenways dedication is required.
Planning and Zoning Commission Meeting Page 3 of 4
November 3, 2011
Pedestrian
Connectivity: Since the Creek Meadows development began in the College Station
Extraterritorial Jurisdiction, sidewalks are not required. A four -foot sidewalk is
proposed on both sides of Baker Meadow Loop.
REVIEW CRITERIA
Compliance with Subdivision Regulations: The proposed Final Plat is in compliance with the
approved Preliminary Plat for Creek Meadows Subdivision Section 2 Phase 3, and is in
compliance with the Subdivision Regulations contained in the Unified Development Ordinance.
STAFF RECOMMENDATIONS
Staff recommends approval of the proposed Final Plat.
SUPPORTING MATERIALS
1. Application
2. Copy of Final Plat (provided in packet)
Planning and Zoning Commission Meeting Page 4 of 4
November 3, 2011