Loading...
HomeMy WebLinkAboutStaff Report ( ....... CITY OF COLLEGE STATION FINAL PLAT for Creek Meadows Section 2 Phase 3 11- 00500092 SCALE: 41 Tots and 2 Common Areas on 7.41 acres LOCATION: 15550 Creek Meadow Boulevard North ZONING: PDD Planned Development District APPLICANT: RME Consulting Engineers PROJECT MANAGER: Lauren A. Hovde, Staff Planner lhovde @cstx.gov RECOMMENDATION: Approval Planning and Zoning Commission Meeting Page 1 of 4 November 3, 2011 a o cNi i t''''' . c, ��pg N 'fit s " +''» V Asa .,,,.� �� a. • 1s3, 0.1 4/ „ * . c 114.. A j Fa /� N KER B ° J . am w ........,...., BM A KE EAW? � „... ., D ° U' a rt 5 0 COY '"� .. '# �' o C , ” �3' +A M*° , W el' / Q O� � j � � y e ' , 2 Y. j � � � '. / .., may_ i e R F J + ? � � r';': � ;� c�Q� � �i' � b �" � `� � 3 al Lil ,.�. ❑ ( ¢f i k i liqH\7 2 ., , ; I ;,.'4 1.3\/ •.____-,.' --- - . odii , ;,,,giot . neW It: Page 2 of 4 Planning and Zoning Commission Meeting November 3, 2011 DEVELOPMENT HISTORY Annexation: March 2008 Zoning: PDD Planned Development District (2008) A -O Agricultural Open (2008) Preliminary Plat: Creek Meadows Subdivision — 2006. The Preliminary Plat was revised in January 2008, September 2008, November 2008, and January 2009. Site Development: Vacant COMMENTS Water: Water service will be provided by Wellborn Special Utility District. Sewer: The Creek Meadows project included the construction of a lift station and extension of a public force and gravity main to serve the area. This infrastructure has already been constructed and accepted by the City. Streets: The internal local street is the continuation of Baker Meadow Loop, previously platted with Creek Meadows Section 2 Phase 1 B. Off -site Easements: N/A Drainage: The property is located within the Peach Creek Drainage Basin. Drainage is generally to the south. Flood Plain: There is no FEMA regulated floodplain located on the property. Oversize Request: N/A Parkland Dedication: This project began developing in 2006 in the ETJ prior to the requirement of parkland dedication in the ETJ. No parkland dedication is required for the proposed final plat. Bicycle Connectivity: There are no bike facilities required or proposed within or abutting this phase of the development. Impact Fees: N/A Greenways: There are no Greenways identified for this property and therefore no Greenways dedication is required. Planning and Zoning Commission Meeting Page 3 of 4 November 3, 2011 Pedestrian Connectivity: Since the Creek Meadows development began in the College Station Extraterritorial Jurisdiction, sidewalks are not required. A four -foot sidewalk is proposed on both sides of Baker Meadow Loop. REVIEW CRITERIA Compliance with Subdivision Regulations: The proposed Final Plat is in compliance with the approved Preliminary Plat for Creek Meadows Subdivision Section 2 Phase 3, and is in compliance with the Subdivision Regulations contained in the Unified Development Ordinance. STAFF RECOMMENDATIONS Staff recommends approval of the proposed Final Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Final Plat (provided in packet) Planning and Zoning Commission Meeting Page 4 of 4 November 3, 2011