Loading...
HomeMy WebLinkAboutSTAFF REVIEW COMMENTS CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 8, 2003 TO: Parviz Vessali, Via fax 764.9601 FROM: Bridgette George, Assistant Development Manager SUBJECT: 500 COLLEGE MAIN - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval: Six (6) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached; Two (2) revised site plans; and One (1) landscaping plan. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Rabon Metcalf, RME, Via fax 690.0329 Case file #03- 00500216 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: 500 COLLEGE MAIN — 03- 00500216 PLANNING 1. For your information, a handicapped parking space is not required for this project. 2. 18 -foot parking spaces require a 2 -foot overhang. When the overhang is a part of a sidewalk, the sidewalk must be a minimum of 6 feet wide. Reviewed by: Jennifer Prochazka Date: September 5, 2003 LANDSCAPING /STREETSCAPING /BUFFER 3. Please note on the site plan that all disturbed earth must be 100% covered with established grass or groundcover prior to C.O. Reviewed by: Jennifer Prochazka Date: September 5, 2003 ENGINEERING 1. Please consider grade modifications or retaining structure to support the foundation of existing building adjacent to four -foot wide walk. Reviewed by: Brett McCully, P.E. Date: 9/05/03 ELECTRICAL 1. No comments. Reviewed by: Ronnie Bolin Date: 9 -5 -03 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2