TRANSMITTAL
Date: September 12, 2003
To: Ken Fogle
Transportation Planner
City of College Station
From: Joe Schultz, P.E.
Texcon General C tractors
1707 Graham Road
College Station, Texas 77845
Phone: (979) 690 -7711
Subject: Preliminary Design Drawing
Proposed Harvey Road Development
College Station, Texas
Remarks: Attached is copy of a drawing showing the layout of the proposed
development. The alignment of the minor collector is OK except that if the
stream is determined to be jurisdictional as waters of the U.S. by the COE,
then we will be limited in how much stream disturbance can occur. Due to the
meanders of the stream channel in this area the collector street construction
will impact almost 200 LF of stream channel. Moving the street would allow
it to cross the stream in a straight section of channel and reduce the impact.
Let me know if you need anything else or have any questions. I would glad to
take the time to meet with you and Spencer on this item.
/it
6t,L-5
TXCON
TRANSMITTAL
Date: September 19, 2003
To: Kelly Templin
Development Services, Director
City of College Station
From: Joe Schultz, P.E.
Texcon General C tractors
1707 Graham Road
College Station, Texas 77845
Phone: (979) 690 -7711
Subject: Conceptual Plan and Revised Concept Plan
Villas of Harvey Subdivision
College Station, Texas
Remarks: Attached are 2 copies each of the Conceptual Plan and the revised Concept
Plan for the above referenced project. The Conceptual Plan has also been
revised from the version previously shown to the Parks Board to remove 4
residential lots to increase the Park Land dedication that would not be in the
floodplain. The Concept Plan has been revised to match the latest version of
the Conceptual Plan for the project.
The Parks Board also agreed to accept approximately 3 acres of the
pipeline /powerline corridor as parkland. The total parkland dedication will be
approximately 10.7 acres.
Let me know if you need anything else or have any questions.