Loading...
HomeMy WebLinkAboutApplication (11-200) FOR OFF Ca USE ONLY, r CASE NO.: s -;, 77 � DATE SUBMITTED: &_ / 4. if !P TIME: CITY OF COLLEGE STATION Horne of Ryas AerMUniversity' SITE PLAN APPLICATION STAFF" • ' GENERAL MINIMUM SUBMITTAL REQUIREMENTS: $932 Site Plan Application Fee. 4 $350 Non- Residential Architectural Standards Building Review Application Fee (if applicable). 0,a,�P/ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). f' Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Fourteen (14) folded copies of site plan. Er One (1) folded copy of the landscape plan. RI One (1) copy of the following for Non - Residential Architectural Standards building review or Northgate Building Review (if applicable). 11 Building elevations to scale for all buildings. 11 A list of building materials for all facade and screening. 111 Color samples for all buildings or list colors to be used from the approved color palette. UFA Electronic copy of Site Plan e- mailed to csuelectdesign @cstx.gov. Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. dj Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). zaip Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). The attached Site Plan Non - Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference C n NAME OF PROJECT i r'e S ADDRESS 1 1 ti LEGAL DESCRIPTION (Lot, Block, Subdivision) APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name R„ 9 si ' �� ' , ""...ass t�1 12410 Email fhb des' Street Address £+ 51 e ° 0 3 City 4,1 State Zip Code 7 go Phone Number 34 6 Fax Number q74 v41— 316 PROPERTY OWNER'S INFORMATION: Name Ni d E -mail Street Address d t y d(° -es City fir State I A Zip Code 7 4 Phone Number ( o .Q Fax Number 1/11 Page 1 of 11 ARCHITECT OR ENGINEER'S INFORMATION: Name 54PK, m i CAM E -mail Street Address City State Zip Code Phone Number Fax Number OTHER CONTACTS (Please specify type of contact): Name E -mail Street Address City State Zip Code Phone Number Fax Number Current zoning c Present use of property V C v 1- r Proposed use of property ( kem vi 7 Number of parking spaces required ei, e ` ltf3 , efe b r o parking spaces proposed Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? E Yes I No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? Yes No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: City Project Number (in known): Date / Timeframe when submitted: 1/11 Page 2 of 11 MULTI - FAMILY RESIDENTIAL PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) Total Acreage # of Multi - Family Dwelling Units Floodplain Acreage X $1646 = $ Housing Units # of acres in floodplain # of 1 Bedroom Units # of acres in detention # of 2 Bedroom Units # of acres in greenways # of 3 Bedroom Units Date dedication approved by Parks & # of 4 Bedroom Units Recreation Advisory Board COMMERCIAL FOR 2 BEDROOM UNITS ONLY Total Acreage # Bedrooms = 132 sq. ft. Building Square Feet q 31 # Bedrooms < 132 sq. ft. Floodplain Acreage * Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. Signature and fitt Date 1/11 Page 3 of 11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to a ('3 r a h s, (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Propert' Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Engineer Date 1/11 Page 4 of 11 C11 Y OF COLLEGE STATION Home of Texas AdM University' SITE PLAN APPLICATION GENERAL FOR OFFIC9 USE ONLY CASE NO.: DATE SUBMITTED: ! TIME: STAFF - MINIMUM SUBMITTAL REQUIREMENTS: [f $932 Site Plan Application Fee. // $350 Non -Residential Architectural Standards Building Review Application Fee (if applicable).104 'r� Sera-.. tl trr] $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is y f 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ',(A j /3113- 71` [t7 Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. [� Fourteen (14) folded copies of site plan. [>� One (1) folded copy of the landscape plan. 0' One (1) copy of the following for Non -Residential Architectural Standards building review or Northgate Building Review (if applicable). Building elevations to scale for all buildings. A list of building materials for all facade and screening. Color samples for all buildings or list colors to be used from the approved color palette. Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). tilp Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). �(YG1 The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference P/4 c ; U " z - 0 NAME OF P ADDRESS LEGAL DESCRIPTION (Lot, Block, Subdivision) APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name iQ !F.'T f�cji` S,-Ti c " I ��n (+LY1r9G CS' E-mail 4 rr!'r6slCf'1"o' �`a i�i�PS/�ShS pCG>>y Street Address 4+500 C o c 1r&— L. - C CK: S r 7'` v_.�01 City �y An State %`x Zip Code ' 7 7 W® ,2 Phone Number -1%4 fit 3 3Fax Number C170— 8W— 336 s PROPERTY OWNER'S INFORMATION Name \PI p 1 f 69C — J 0/ 1 AiC I S [w1 E-mail Street Address 14154 Hl to y t�) ' y .� City MOH' State J Zip Code 7%3 k&_ Phone Number 291— S __ —Fax Number I111 Pagel of 11 ARCHITECT OR ENGINEER'S INFORMATION: Name 4c.mir AS .4nA Street Address City Phone Number OTHER CONTACTS (Please specify type of contact): Name Street Address City Phone Number Current zoning _' Present use of property . Proposed use of property i E-mail State Zip Code Fax Number E-mail State ✓1 Fax Number Zip Code PP Number of parking spaces required `/A�kW -eX&b.�9 9Le4h ����pp�� 1 err1 o parking spaces proposed Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r Yes r No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vestinq is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. this application a continuation of a project that has received prior City platting approval(s) and you are requesting the plication be reviewed under previous ordinance as applicable? j- Yes r No yes, provide information regarding the first approved application and any related subsequent applications (provide iditional sheets if necessary): Project Name: City Project Number (in known): Date / Timeframe when submitted: 1111 Page 2 of 11 MULTI -FAMILY RESIDENTIAL Total Acreage Floodplain Acreage Housing Units # of 1 Bedroom Units # of 2 Bedroom Units # of 3 Bedroom Units # of 4 Bedroom Units FOR 2 BEDROOM UNITS ONLY # Bedrooms = 132 sq. ft. # Bedrooms < 132 sq. ft. PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) # of Multi -Family Dwelling Units X$1646=$ # of acres in floodplain # of acres in detention # of acres in greenways Date dedication approved by Parks & Recreation Advisory Board COMMERCIAL Total Acreage Building Square Feet 16 Floodplain Acreage Projects that were vested prior to January 1, 2008, per Chapter 246 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. Signature nd ti Date Page 3 of 11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re -issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NO] and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11, The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to F• 4 •ri ptS r9hJ 101-1 (name or firm) is authorized for bidding purposes only. I understand that final approval andirelease of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. / �P cox' 2v Propert Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Engineer Date 1111 Page 4 of 11