The City Council has implemented a policy whereby applicants and developers are
expected to present their case to the Council. This policy will primarily affect requests for
rezonings and ordinance amendments. The Council will first hear a brief presentation by
staff. Next, the applicant and /or developer will make their presentation. The public
hearing will be opened after the applicant's presentation.
Please be aware that the Planning and Zoning Commission has implemented a similar
policy. Applicants and developers, who have a project before the Commission, will present
their case to the Commission after the staff presentation. This policy will apply to almost
all items on the regular agenda before the Commission, including rezonings, ordinance
amendments, master plans, plats and conditional use permits. Again, for those items
requiring a public hearing, the applicant and or developer will be able to make their
presentation prior to the opening of the public hearing. Applicants with an item on the
consent agenda should be prepared to answer questions if the item is pulled off of the
consent agenda.
This information is supplied to applicants with the intent to provide guidance as to the
content of the applicant's portion of the project presentation to the Council and /or the
Planning and Zoning Commission. This is an opportunity for the applicant and /or
developer to explain the purpose of their request, to present a counter viewpoint or to
stress the advantages of their proposal. Special consideration should be given to
addressing the reasons for any variances requested.
Following is a list of items applicants should be prepared to discuss during their
presentation to the Council and /or the Planning and Zoning Commission (grouped by type
of request). All the suggested items may not apply to each case. Several of the bullet
points are key phrases referring to additional information that can be found in the City's
Code of Ordinances and /or the City's Comprehensive Plan. There may be some overlap
between the staff and the applicant's presentations.
If equipment, such as easels, PowerPoint, etc., is necessary for the presentation please fill
out the attached request form and return it to staff at least 3 working days prior to the
meeting.
Presentation Equipment Request
LOLL E(.E STATION
Name (Please Print):
Phone:
Address:
E -mail Address:
Project Name:
Date of Meeting:
Location of Meeting:
Type of Meeting: Staff Liaison:
City Council City Secretary - Connie Hooks
Planning & Zoning Commission Development Review Manager - Natalie Ruiz
Zoning Board of Adjustment Development Review Manager - Natalie Ruiz
Historic Preservation Committee Neighborhood Planner - Lee Battle
Northgate Review Board Development Review Manager - Natalie Ruiz
Design Review Board Development Review Manager - Natalie Ruiz
Project Review Committee Development Review Manager - Natalie Ruiz
Parks Board Assistant Parks Director - Ric Pleoger
Development Project Meeting with Surrounding Neighborhood
(Facilitation requested of City- Make sure appropriate request form is completed.)
Development Review Manager - Natalie Ruiz
Other; Please explain.
City Secretary - Connie Hooks or
Development Review Manager - Natalie Ruiz
Equipment Requested:
Dry erase board Manual slides Easels #
Video Overhead Other
PowerPoint (Contact the Action Center at 764 -3457 to coordinate.)
Return request form to the appropriate staff liaison at least 3 working days prior to the
meeting. Not all equipment is available at each City facility. Contact the appropriate staff
liaison for the meeting in advance if you have any questions.
Signature: Date:
REZONING:
APPLICANTS SHOULD BE PREPARED TO ADDRESS
Item Summary: (Please be aware that the Council and Commission must consider all the
potential uses in a given zoning district.)
• Purpose for request
• Why did applicant choose to request this zoning versus others available?
• Surrounding uses /zoning
• Development Activity in the vicinity
• Market influences
• Property configuration /dimensions will allow development under proposed zoning?
• Potential impacts to surrounding uses /infrastructure, esp. traffic
• Proposed mitigation of negative impacts, buffering, etc.
• Neighborhood meetings
• Actions pending (platting, additional zoning, site plan)
• Discuss any potential oversize participation requests
• Relationship to approved master plan
For PDD rezoning requests the applicant should go into some detail about the proposal, as
well as, explain what benefit the City may realize from this proposal as opposed to a
standard zoning district in this particular location.
STAFF WILL CONTINUE TO ADDRESS
Comprehensive Plan Considerations:
• Land Use Plan - Changes in conditions, Surrounding uses (existing and on future LUP)
• Special Area Plans (EBP, City Center, University Dr., 2818, WPC, 30/60)
• Thoroughfare Plan
• Parkland Dedication, Open Space Dedication, Greenways
• Development Policies
• CIP projects near site
Item Background:
• Annexed
• Rezoned
• Platted
• Recent actions
Related Advisory Board Recommendations: Parks Board, NRB, DRB
Infrastructure and facilities:
• Water: adequate capacity — adequate fire coverage?
• Sewer: adequate capacity?
• Streets: Classification on Thoroughfare plan; conditions, adequate capacity?
• Off -site Easements
• Drainage
• Flood Plain
• Oversize request
• Impact Fees
CUP and C -N DISTRICT USES:
APPLICANTS SHOULD BE PREPARED TO ADDRESS
Item Summary:
• Purpose for request
• Surrounding uses /zoning
• Development Activity in the vicinity
• Market influences
• Property configuration /dimensions
• Potential impacts to surrounding uses /infrastructure, esp. traffic
• Neighborhood meetings
• Actions pending (platting, additional zoning, site plan)
• Be prepared to discuss items to mitigate adverse effects of the proposed use. These
may include, but are not limited to, increased open space, loading and parking
requirements, additional landscaping or buffering, and additional improvements such as
curbing, sidewalks and screening.
STAFF WILL CONTINUE TO ADDRESS
Comprehensive Plan Considerations:
• Land Use Plan - existing and future uses on subject site and in rest of area
• Special Area Plans (ex. Northgate Revitalization Plan, WPC, EBP, etc.)
• Thoroughfare Plan
• Parkland Dedication, Open Space Dedication
• Proposed development - varies from zoning restrictions? (Height, setbacks, etc.)
• Signs (what district regulations will restrict signs ?)
• Discuss items to mitigate adverse effects of the proposed use. These may include, but
are not limited to, increased open space, loading and parking requirements, additional
Landscaping, and additional improvements such as curbing, sidewalks and screening."
Item Background:
• Annexed
• Zoned
• Platted
• Recent actions
Infrastructure and facilities:
• Water - adequate capacity
• Sewer - adequate capacity
• Streets - adequate capacity
• Off -site Easements
• Drainage
• Flood Plain
• Oversize request
• Impact Fees
MASTER DEVELOPMENT PLANS AND PLATS (PRELIMINARY, FINAL & REPLATS)
APPLICANTS SHOULD BE PREPARED TO ADDRESS
Item Summary:
• Reason for request
• Reason for any variances requested from the Commission
• Explain any variances already granted by ZBA
• Surrounding uses /zoning
• Development Activity in the vicinity
• Market influences
• Actions pending (platting, additional zoning, site plan)
• Discuss any potential oversize participation requests
• Relationship to previously approved master plan or preliminary plat
STAFF WILL CONTINUE TO ADDRESS
Comprehensive Plan Considerations:
• Land Use Plan
• Special Area Plans (EBP, City Center, Univ. Dr. 2818, WPC, 30/60)
• Thoroughfare Plan
• Access /Cross Access /Driveway Compliance
• Bikeways
• Parkland Dedication, Open Space Dedication, Greenways
• Compliance with any previously approved master plan or preliminary plat
• Compliance with rezoning conditions
• Compliance w /Subdivision Regulations
Item Background:
• Annexed
• Zoned
• Platted
• Recent actions
Related Advisory Board Recommendations: Parks Board
Infrastructure and facilities
• Water
• Sewer
• Streets
• Off -site Easements
• Drainage
• Flood Plain
• Oversize request
• Impact Fees
SPECIAL PROJECTS AND OTHER
(W}'G, ordinance Amendments)
These types of projects are rare. Please get with staff to determine what should be
presented for these types of cases.
CITY OF COLLEGE STATION
2002 Submission Deadlines
COLLEGE STATION
Planning & Zoning City Council Zoning Board of
Filing Deadline Commission Meetings Adjustment Meetings
10 A.M. Meetings 7:00 P.M. 6:00 P.M.
7:00 P.M. 2 & 4 Thursdays 1 Tuesdays
1 & 3 Thursdays
Tuesday, December 4 ('01) January 3 January 24 January 8
Wednesday, December 19 ('01) January 17 February 14
Friday, January 11 February 7 February 28 February 5
Monday, January 28 February 21 March 14
Monday, February 11 March 7 March 28 March 5
Monday, February 25 March 21 April 11
Monday, March 11 April 4 April 25 April 2
Friday, March 22 April 18 May 9
Monday, April 8 May 2 May 23 May 7
Monday, April 22 May 16 June 13
Friday, May 10 June 6 June 27 June 4
Friday, May 24 June 20 July 11
Monday, June 10 Canceled July 25 July 9
Friday, June 21 July 18 August 8
Monday, July 8 August 1 August 22 August 6
Monday, July 22 August 15 September 12
Friday, August 9 September 5 September 26 September 10
Friday, August 23 September 19 October 10
After each filing deadline, staff will evaluate the caseload and adjust schedules accordingly. If there is a
large case load, items will be scheduled on a first come, first served basis. The remaining items will be
scheduled for the next available meeting. Submitting your information on an established deadline day in
no way guarantees that you will be placed on the corresponding Planning & Zoning Commission, Zoning
Board of Adjustment or City Council meeting. If you have any questions, please contact Development
Manager Natalie Thomas Ruiz (nruiz station.tx.us) or Asst. Development Manager Bridgette
George (bgeorge(&),ci .college - station.tx.us) at (979) 764 -3570.
Meetings canceled for 2002: Planning & Zoning Commission - July 4
Site Plans /Construction Documents/Drainage Reports Deadline Dates:
All site plans, construction documents and drainage reports that are not required as part of a case before
the Planning and Zoning Commission or City Council, must be submitted by any Monday at 10:00 a.m.
Information submitted after 10:00 a.m. on Monday will not be scheduled for staff review until the
following week. (In case of a Monday holiday, the deadline will be moved to the next business day at
10:00 a.m.)
Susan Hazlett - PDMT: SW Corner of Luther and Jones Butler on 2.97 acres: Don Jones: Page 1
From: Tammy Macik
To: Pre D Group
Date: 8/12/02
Time: 4:OOPM - 5:OOPM
Subject: PDMT: SW Corner of Luther and Jones Butler on 2.97 acres: Don Jones:
Place: DSCR
Blake Cathey
Sabir Jaffar
Thanks,
Tammy Macik < ><
— 764 -6254—
Negativity steals from you
what could be the good things of life.
Y\ v
1
FACSIMILE COVER SHEET
c #e C OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
COLLEGE STATION
College Station, Texas 77842
Phone (409)764 -3570 / Fax (409)764 -3496
Date: September 3, 2002 # of pages including cover: 2
If you did not receive a complete fax, please call our office immediately for a new transmittal.
TO: Shabeer Jaffar FAX: 680.0173
COMPANY:
RE: Rezoning of Melrose Subdivision Lot 4 Block 1
FROM: Molly Hitchcock PHONE: 979.764.3570
COMPANY: City of College Station
REMARKS: Urgent For your review ❑ Reply ASAP ® FYI
You will be receiving a refund of the rezoning application fee in approximately 2
weeks.
j The Ci of
Colfege Station Texas
Embracing the Past, Exploring the Future.
P.O. Box 9960 • 1101 Texas Avenue • College Station, TX 77842 • (979) 764 -3500
www.ci.college - station.tx.us
September 3, 2002
Shabeer Jaffar
P.O. Box 3135
College Station, TX 77841
via facsimile @ 680.0173 and via regular mail
re: Lot 4, Block 1 Melrose Subdivision
College Station, Texas
Dear Mr. Jaffar:
On March 12, 1998, the City Council rezoned the above referenced property from R -5
Apartment/Medium Density to PDD -B Planned Development District — Business (Ordinance
No. 2315). Since that time, the City of College Station has not received any applications for
the development of this land until your request for a rezoning from PDD -B to R -5 was
received on August 21, 2002. In regards to PDD rezonings, Section 7.25.M of the Zoning
Ordinance states:
The Concept Plan shall expire and the zoning shall revert to the previous zoning
classification that existed on the affected properties prior to the PDD rezoning if further
development action has not been apparent within 24 months of the effective date of the
PDD Ordinance.
As there have been no submittals to the City to further the development of the land in over
53 months, the land has reverted back to previous zoning of R -5, in accordance with
Section 7.25.M of the Zoning Ordinance. The zoning for the subject property will be
updated on the official Zoning Map.
If you have any questions regarding this matter, please do not hesitate to call me at
764 -3570.
Sincerely,
Molly Hitchcock
Staff Planner
cc: City Council Ordinance file; Development Services Ordinance folder; files 02 -181 and
98 -101
O: \GROUP\DEVE SER \ZONELTRS\MelroseLot4Blockl.doc
Home of Texas A &M University
09/03/02 16:38 V979 764 3496 DEVELOPMENT SVCS igool
***************************
*** ACTIVITY REPORT ***
***4:4-1 ..... . . . *-1 . * * ********
TRANSMISSION OK
TX/RX NO. 3862
CONNECTION TEL 96800173
CONNECTION ID
START TIME 09/03 16:38
USAGE TIME 0047
PAGES 1
RESULT OK
09/03/02 16:31 %2979 764 3496 DEVELOPMENT SVCS 1j001
** ** * * ** * * *$ * *..d. * * * ** * * ** **
* ** ERROR TX REPORT * **
* * * ** :* .k 1 1 1 .* F" .hY:::: *h: * *:F:y:
TX FUNCTION WAS NOT COMPLETED
TX /RX NO. 3861
CONNECTION TEL 96800173
CONNECTION ID
START TIME 09/03 16:30
USAGE TIME 01'01
PAGES 1
RESULT NG
1
REZONING SUPPORTING INFORMATION
1.) List the changed or changing conditions in the area or in the City which make this zone change necessary.
MultiFamily development has proliferated in the immediate vicinty of .
the subject property.
2.) Indicate whether or not this zone change is in accordance with the Comprehensive Plan. If it is not, explain
why the Plan is incorrect.
This change is not in accordance with the Comprehensive Plan. The
development of the area into multi - family uses is probably due to the
evolving preference for student housing to be located closer to campus.
3.) List any other reasons to support this zone change.
Nearly all of the property adjacent to the subject property has been
developed into multi- family uses.
The applicant has prepared this application and supporting information and certifies that the facts stated herein
and exhibits attached hereto are true and correct. IF APPLICATION IS FILED BY ANYONE OTHER THAN
THE OWNER(S) OF THE PROPERTY, APPLICATION MUST BE ACCOMPANIED BY A POWER OF
ATTORNEY STATEMENT FROM THE OWNER.
g 2l 1 OZ
Signature of owner (or agent) or applicant Date
1- Aug -02 2 of 2