Loading...
HomeMy WebLinkAboutDrainage Report C,uP Oa.- H1 Project Name: ch,..L C ( J 1 t/ Review Date: V Z d Z. COLLEGE STATION Reviewer: 1 S) Oaw Drai*age Reports Loca ion rimary drainage system identified ) Surrounding developments shown ocal streets, drainage systems shown Desc iption V creage of project an¢ cover described Primary/secondary systems within property shown General description rains a Basins A ferences to FIRMs if applicable econdary system flow patterns and impact of development on existing system ✓Proposed pathways to Primary system shown or described s '(� /� �5 I, Design Criteria �1 � �2 '- - i a Any deviation from standards being requested? 0/ L 0. 3 rrvU'` JDiscussion of site constraints and capacities (streets, existing structures, etc.) *Discussion of any applicable previous drainage studies and how this plan will affect it Hy4eologic Criteria Rainfall/runoff calculation method described and calculations provided r 1 etention discharge / storage calculation method / calculations J Storm recurrence intervals used Discussion of other drainage facility design criteria used if not referenced in Standards Hydaulic Criteria Identify capacity of systems used Specify velocities at critical points in system Identify detention / retention outlet and routing Discussion of other drainage facility design criteria used not referenced in Standards LI Li D r 'nage Facility Design Discuss drainage patterns / flows (pre vs. post) Are they draining water onto another property owner? - if so, is it where the water flowed before? and is it not more than what flowed there before? and no faster than it flowed before? Discuss erosion control measures employed 44ttDiscuss detention pond design (sideslope, low flow channels, outlet works, freeboard, emergency spillway) i V iscuss maintenance access and responsibilities Conclusions '4Verify compliance with DPDS (signed and se. ed certification I' / E lain effectiveness of improvements with regar• to controlling discharges of 5 - 100 year storm by a) Detaining b) Accommodating runoff in existing / proposed easements or ROW discharging into primary system c) Combination of a & b o: \deve_ser \forms \engr \chklst.doc 8/21/02 9 of 12 CuP ( rl , ( a Project Name: ..j i `� Review Date: D zA OZ COLLEGE STATION Reviewer: , e Tho'(lr`1Q5,r1 `ILA Drainage Reports(cont.) Appendices References (all criteria and technical information used) Hydrologic computations Land use assumptions for adjacent property tk f h Minor /major storm runoff at specific points /' Historic /fully developed runoff specific points Hydrographs at critical points [Hydraulic computations (/ _ Culvert capacities (headwater and tailwater assumptions) ,� Storm sewer capacities N Street capacities Storm inlet capacities (inlet control rating) #11 4 1 :: Open channel design N (A-- Detention area / volume capacity / outlet capacity Attaphed Drawings Location map with drainage patterns )C, Fjoodplain map if any -'Drainage plan with topo (existing and proposed with arrows if needed) Details of outlet structures o: \deve_ser \forms \engr \chklst.doc 8/21/02 10 of 12 j I b� C Project Name: fib_ .-- �' �- `II G Review Date: 0 (, r) COLLEGE STATION Reviewer: c '1 Public Water Infrastructure C � - General Overall utility layout sheet - showing easements (platted or by separate instrument) If separate instrument easements are needed - do not approve until we get them recorded TXDOT peiutils needed! Sealed and Signed Engineers Estimates L� ss 'Pipe material 'JPipe sizes (allowable....6,8,12,16,18 - note no 10" approved) >. Depth (4' +) (min,max) S eparation distances (TNRCC) • All utilities in plan & profile w /sizes and type "Private vs. Public line distinction 1.* Wyes not past property line (so meter can be within ROW /easement) ,JA- Max # of connections for size waterline (TNRCC) 2 Pipe deflection (noted as %, degrees, radius - with begin /end curve, not at jt.) 7 Grades - existing and proposed (centerline, right and left) shown in profile Full TNRCC compliance n Conflicts with other utilities shown Labels on all major items in plan & profile (crossings) N Size/Location sufficient for overall City needs /masterplan ✓1vlinimize dead -end lines Vtines located in PUE/ROW �'- S tationing on all fittings and taps 2-13. Valves ,,,A- V spacing (500') (v'')Jalves - system isolation �`� Valves - at hydrant ,•/' B ackflow preventers/ and check valves uses as necessary ( @irrigation /fire sprinkler /pools/hazards) V Blowoffs (FH ok too) @ end of dead end lines Air release valves at all major high points Fire Hydrants 04,1-- Fire hydrant spacing (Coverage) Fire hydrant location (relative to curb) X Fire hydrant - detail/type specified N O Fire flow calculations provided Service Lines i, k Service lines - materials and size specified from main to meter /� Services provided to all lots to a point beyond sidewalks on both sides of street o: \deve_ser \forms \engr \chklst.doc 8/21/02 1 of 12 Project Name: `of Review Date: COLLEGE STATION Reviewer: Public Water Infrastructure(cont.) Details $ Standard Details noted or included (referenced as city of CS Standard Details) X. Details for all non - standard items (included/ok) (not on CS Std. detail sheet) All MJ valves and fittings X rust blocking /Easement width adequate yc Embedment details (specify option) Trench safety if deeper than 5' Erosion control notes The following items are variances to the College Station public waterline standards: o: \deve_ser \forms \engr \chklst.doc 8/21/02 2 of 12 Crat • Project Name: ' � fl u j Review Date: cw.D. , COLLEGE STATION Reviewer: 4 , A , /11• Ir■L•L Ct DEVELOPMENT PERMIT 1. Application Fee ($100) 2. Application 3. Erosion Control Plan 4. EPA/NOI (> 5 acres) 5. Public Infrastructure Inspection Fee ($300) 6. Drainage Report 7. HOA Covenants for maintenance of detention /retention ponds 8. Easements Dedicated (separate instrument) 60. Engineer's Estimates (1 -4 necessary for rough grading /clearing all others necessary for full permit) o: \deve_ser \forms \engr \chklst.doc 8/21/02 11 of 12 s r 4 46. . 0 3 1 1 R u 9 R , i \ ! I / , , \ 1 1 , ( i i , \ i \ \ \ 1 i , i