Loading...
HomeMy WebLinkAboutCost Estimate SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Harvey Mitchell - Commercial Addition Sanitary Sewer Improvements Lot 2, Block 1 Engineer's Estimate of Construction Item) Description 1 Unit I Estimated I Unit Price I Total Quantity General Items 1 Mobilization, Overhead and Construction Staking LS 1 S 1,500.00 $1,500 2 Silt Fence, complete in place LF 80 $ 2.50 $200 3 Erosion Control Blanket, complete in place SY 400 $ 1.80 $720 4 Hydroseed and Hydromulch, complete in place SY 600 $ 0.50 $300 General Items Subtotal $2,720 Sanitary Sewer Construction Items 5 8" PVC Sewer Line - D3034 - Non - Structural Backfill, complete in place LF 103 $ 30.00 $3,090 6 16" Steel Casing 3/8" thick with Spacers and End Seals LF 40 $ 100.00 $4,000 7 Tie -In to Existing Manhole, complete in place EA 1 $ 950.00 $950 8 TV Testing and Inspection, complete in place LF 103 $ 3.50 $361 Sanitary Sewer Construction Items Subtotal $8,401 TOTAL ESTIMATED CONSTRUCTION' $11,1211 l e o lt OF •f ..f.. # ►. ....... . . ..,(05EPH P k \febi `A� ! F - 12327 SCHULTZ ENGINEERING, LLC. Page 1 of 1 ,` (� q SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Harvey Mitchell - Commercial Addition Sanitary Sewer Improvements Lot 2, Block 1 Engineer's Estimate of Construction Item Description Unit Estimated Unit Price Total 1 I Quantity General Items 1 IMobiliration, Overhead and Construction Staking LS 1 S 1,500.001 S1,500 2 Silt Fence, complete in place LF 80 S 2.50 5200 3 Erosion Control Blanket, complete in place SY 400 S 1.80 5720 4 Hydroseed and Hydromulch, complete in place SY 600 S 0.50 5300 General Items Subtotal 12,720 Sanitary Sewer Construction Items 5 8" PVC Sewer Line - D3034 - Non - Structural Backfill, complete in place LF 103 S 30.00 53,090 6 16" Steel Casing 3/8" thick with Spacers and End Seals LF 40 S 100.00 54,000 7 Tie -1n to Existing Manhole, complete in place EA 1 S 950.00 5950 8 TV Testing and Inspection, complete in place LF 1031 S 3.50 5361 Sanitary Sewer Construction Items Subtotal 58,401 TOTAL ESTIMATED CONSTRUCTION' 511,1211 .:/ \**. JOSEPH P. SCHULTZ 6588! i "44- - 6. » -t( F -12327 SCHULTZ ENGINEERING, LLC. Page 1 of 1 S . I,\ k `��(,