Loading...
HomeMy WebLinkAboutApplication (11-144)CI'ry OP COLI33GF STATION Home of Texas Ad'M University' SITE PLAN APPLICATION GENERAL FOR OFFICE USE r , USE .. _ ONLY CASE NO.; C�- DATESUBMITTED: � 7.1 TIME: STAFF: MINIMUM SUBMITTAL REQUIREMENTS: [� $932 Site Plan Application Fee. $350 Non -Residential Architectural Standards Building Review Application Fee (if applicable). [� $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Fourteen (14) folded copies of site plan. One (1) folded copy of the landscape plan. �y One (1) copy of the following for Non -Residential Architectural Standards building review or Northgate Building Review (if applicable). [Ij Building elevations to scale for all buildings. [1[� A list of building materials for all facade and screening. [� Color samples for all buildings or list colors to be used from the approved color palette. WElectronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. [t7� Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference AU 5 Zt'1l NAME OF PROJECT ADDRESS _III WiIkAfA �ijG(n F'kix>/ LEGAL DESCRIPTION (Lot, Block, Subdivision) bf I? , $100k 3 rVW.J Poirrt fdJoh on /hok ff—A APPLICANT pt/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name I1 STACv TIT Imr 40000 !%w _Vle E-mail .44+1V C G•tWF�W LDM Street Address City Nspil u a« n Phone Number Fax Number PROPERTY OWNER'S INFORMATION: SMIE fIS f19P1 �IrI�Ir Name Street Address City Phone Number State E-mail Fax Number Zip Code 7 46 Zip Code Wi Page 1 of 11 ARCHITECT OR ENGINEER'S INFORMATION: Name alp, E�A�,^t G45"6,qe, S On , t'M$S A VIOn '� E-mail Cghaksc�nm Q {pect, 649T, PVv - <r StreetAddr'6ss iIAE Uo Vilm Ir6uI , wte 520v City p wa 'Hco(- State iR Zip Code 'p ffl gl Phone Number .12 1my-154(, Fax Number OTHER CONTACTS (Please specify type of contact): Name E-mail Street Address City State Zip Code Phone Number Fax Number Current zoning G-t jo V V Present use of property t/AcAm r Proposed use of property f-A6f FecJ U5-tAMAe-A 01,- Number of parking spaces required 3c, Number of parking spaces proposed Y5 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? Yes No information is necessary to help staff identify the appropriate standards to review the application and will be used to determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, ng is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? j— Yes 1140 yes, provide information regarding the first approved application and any related subsequent applications (provide fditional sheets if necessary): Project Name: City Project Number (in known): Date / Timeframe when submitted: 1/11 Page 2 of 11 CERTiFI'CATIONS. REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No Work of any kind may start until a permit Is Issued. 2. The permit may be revoked If any false statements are made herein. 3. If revoked, all work must cease until permit is re -Issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is Issued. 5. The permit will expire If no sighificant work is progressing within 24 months of Issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at stab pre - pour) and post construction; 8. Owner hereby gives consent to City representatives to make reasonable Inspections required to verify compliance. 9. If, stormwater mitigation Is required, including detention ponds proposed as part of this project, it shall be designed and constructed first In the construction sequence of the project. 10, In accordance With Chapter 13 of the Code of Ordinances of the City of College Statiop� measures shall be taken to Insure that all debris from construction, erosion, and sedimentation shall not be: deposited in city streets, or existing drainage facilities, All development shall: be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of applicable Codes and ordinances of the City of College Station shall apply. 11, The information and conclusions contained In the attached plans and supporting dooliMenfs.:will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 end associated BCS Unified Design Guidelines Technical Specifications, and Standard Details, All development has been designed. In accordance With all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) Is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor' signature on .approved Development Permit. 13. I, THE OWNER; AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN; AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACLU jT�,E Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater m..itigation, Including detention ponds, proposed as.part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction Including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The Information and conclusions contained in the attached plans and supporting, documents comply with the currentrequirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed In accordance with all applicable codes and ordinances of the City of, College Station and State and Federal Regulations. 4. I, THE ENGINEER,, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE, Engineer 0 Date t/11 Page 4 of I