Loading...
HomeMy WebLinkAbout11-00500021- 00076700Drainage Report for Saddle Creek Subdivision, Phase 713 Brazos County, Texas February, 2011 Engineer. - Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764 -3900 Developer. Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690 -2642 Saddle Creek Subdivision, Phase 713 ' Drainage Report ' ENGINEER SCHULTZ ENGINEERING, LLC. P.O. Box 11995 ' College Station, Texas 77842 Phone: (979) 764 -3900 Fax: (979) 764 OWNERMEVELOPER Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690 -2642 GENERAL DESCRIPTION AND LOCATION Location: Saddle Creek Subdivision, Phase 7B, is located on the south east side of FM 2154, off of Stousland Rd. Description: • Area: • Proposed Land Use: ■ # of Lots: ■ Existing Land Use: ■ Land Description: Primary Drainage Facility: Flood Hazard Information: FEMA FIRM Floodplain: 30.458 acres Single Family Residential 19 lots Vacant The terrain slopes in 2 directions southwest and south east Boggy Creek # 48041 C200 -C & # 48041 C215 -C (July 2, 1992) Un- shaded Zone X HYDROLOGIC CHARACTERISTICS The existing site is predominately wooded. The elevations range from 256 to 283, sloping generally in a westerly direction except for the area along Saddle Creek Drive which slopes to the southeast. The runnoff enters tributaries of Boggy Creek. GENERAL STORMWATER PLAN The drainage plan for this development will involve the construction of ditches and the installation of culverts. DRAINAGE DESIGN General Information: Stormwater runoff from Phase 7B of the subdivision will be collected in the ditches and will discharge into Channel No. 1 and eventually into the tributaries of Boggy Creek. Page 1 of 2 ■ CONCLUSION The culverts and the roadside ditches for this subdivision were designed in accordance with appropriate engineering standards. CERTIFICATION I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for Saddle Creek Subdivision, Phase 7B, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge Department. OF Al ..................... A. Jose P. hultz, P.E. ' .JOSEPH P. SCHULTZ . 65889 ST0011- 14 ONAL Page 2 of 2 F -12327 SCHULTZ ENGINEERING, LLC. T, Methodology: TR 55 T, Minimum 10 minutes Design Storm Event: 25 -year & 100 -year - residential street & culvert Pipe Materials: Corrugated HDPE w /smooth interior Manning's n Value: 0.012 Runoff Coefficient: 0.45 ' Design Results Culvert No. 1 Culvert No. 2 Top of Road = 268.91 Top of Road = 269.86 Q,o 24.79 Q10=22.57 ' HW,o 267.05 HW,o= 268.02 Q,op 29.54 Q,00 =26.92 H W,00= 267.25 HW100= 268.17 Culvert No. 3 Culvert No. 4 Top of Road = 269.00 Top of Road = 276.80 Q10=14.70 Q10=7.13 HW, 266.89 HW, 274.18 i Q,00 =17.52 Q, oo =8.49 N HW, 267.19 HW,00= 274.40 ob. The data presented above and in the Appendices indicates the culvert sizes are in accordance with the requirements. The head water elevation for each of the culverts is less than the top of road elevation for the 100 -yr storm runoff. The velocities in the channel are low enough that grass -lined channels are appropriate. Applicable Exhibits: Exhibit A — Drainage Area Map Appendix A — Drainage Area Summary Appendix B — Culvert No. 1, 2, 3, 4 and Channel No. 1 & Channel No. 2 Design Summaries ■ CONCLUSION The culverts and the roadside ditches for this subdivision were designed in accordance with appropriate engineering standards. CERTIFICATION I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for Saddle Creek Subdivision, Phase 7B, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge Department. OF Al ..................... A. Jose P. hultz, P.E. ' .JOSEPH P. SCHULTZ . 65889 ST0011- 14 ONAL Page 2 of 2 F -12327 SCHULTZ ENGINEERING, LLC. Saddle Creek Subdivision - Phase 7B Appendix A Drainage Area Summary Area # Area, A (acres) C k (min) 25 year storm 100 year storm 1 10 (in /hr) Q10 (Cfs) 1 100 (in/hr) Q (cfs) 201 0.380 0.45 25.3 6.261 1.07 7.429 1.27 202 10.430 0.45 39.5 4.809 22.57 5.736 26.92 203 6.610 0.45 37.8 4.942 14.70 5.891 17.52 204 0.070 0.45 10.0 9.861 0.31 11.639 0.37 205 0.420 0.45 10.0 9.861 1.86 11.639 2.20 206 0.370 0.45 10.0 9.861 1.64 11.639 1.94 207 3.053 0.45 34.8 5.191 7.13 6.182 8.49 0.469 0.45 10.0 9.861 2.08 11.639 2.46 F� 208 209 8.188 0.45 51.1 4.084 15.05 4.889 18.01 210 0.500 0.45 10.0 8.861 2.22 11.638 2.62 211 0.330 0.45 10 9.861 1.46 11.639 1.73 The Rational Method: Q = CIA I = b / (t c +d) e Q = Flow (cfs) t = Time of concentration (min) A = Area (acres) C = Runoff Coeff. I = Rainfall Intensity (in /hr) Brazos County. 25 year storm 100 year storm b = 89 b = 96 d = 8.5 d = 8.0 e = 0.754 e = 0.730 t� = L /(V - 60) L = Length (ft V = Velocity (ft/sec) t 1 1 Saddle Creek Subdivision - Phase 7B Appendix B Pipe Design Summary Pipe No. Pipe Size (in) Length ft Slope N Contributing Drainage Areas Contributing Pipes Qa (cfs) VM f a,m cfs V1. (fps) 1 2-24 67 0.85 1.00 - 1.00 -- 201, 202, 210, 211 P2 24.79 1.00 202, 210 7.27 29.54 7.60 3.17 32.54 2 2-24 58 202 209 22.57 7.42 26.92 7.76 ` - 280 1.00 15.05 2.70 18.01 3 24 60 - 203 14.70 7.95 17.52 8.33 4 24 68 1.8 T 207 7.13 8.41 8.49 8.84 Appendix B Channel Design Summary Channel No. Length I Sbpe Contributing Drainage Areas Contributing Pipes a,. (cfs) V 1 . (fps) Depth,. (ft) aim (cfs) V,.. (fps Depth,, (ft 201, 202, 210, 211 P 1, P2 27.32 1.00 3.37 1.05 240 _- _ 0.9 3.17 32.54 2 209 0.71 0.78 280 1.00 15.05 2.70 18.01 2.84