HomeMy WebLinkAbout11-00500021- 00076699Water System Report
for
Saddle Creek Subdivision
Phase 7B
Brazos County, Texas
February, 2010
Prepared By:
Schultz Engineering, LLC
TBPE Firm Registration No. 12327
2730 Longmire, Suite A
College Station, Texas 77845
979.764.3900
* ....................
.
JOSEPH P. SCHULTZ
..........................
. 65889
F -12327
SCHULTZ ENGINEERING, LLC.
2�y•ti
�� Q-K
General Information
Location: Saddle Creek Subdivision, Phase 713, Lots 78-81B, Block 2, Lot 149,
Block 6, Lots 114 -121, Block 7 and Lots 99 -103, Block 8 is located
adjacent to the existing Phases 7A & 5.
General Note: The water lines to serve these 19 residential lots will be a 12" along
Saddle Creek Drive, 8" lines Stetson Drive, Vintage Oaks Drive, Ranch
House Court & Bunkhouse Drive, and a 6" line along Ranch House
Road. The 12" line along Saddle Creek Drive and the 8" line along
Vintage Oaks Drive will connect to the 12" and 8" lines that were
constructed in Phase 5.
Land Use: Single family residential
Design Criteria/Analysis
Primary Water Supply: Existing 12" water line along Saddle Creek Drive.
Existing System Pressure Tests:
Flow Hydrant - See Exhibit B
Flowrate: 1, 300 gpm
Static Pressure: 86 psi
Residual Pressure: 69 psi
Exhibits: Exhibit A — Location Map
Exhibit B — Hydrant Flow Test Results
Exhibit C — WaterCAD Analysis Summary — Domestic Demand
Exhibit D — WaterCAD Analysis Summary — Fire Flow Demand
Fire Flow: 1,000 gpm for Single Family Residential
Domestic Use 1.5 gpm per lot for Single Family Residential
Phase 7B — 19 Lots = 28.5 gpm
Future Development — 105 Lots = 157.5 gpm
Total Domestic Demand = 186 gpm
The proposed 12 ", 8" & 6" water lines are in accordance with the BCS
Water Design Guidelines. This report provides the results of the water
system analysis under the fire flow and domestic demand requirements,
(1,186 gpm) which produced the lowest pressure in the system. The
residual pressure with the fire flow and domestic demand is computed to
be 66.3 psi. With the domestic demand only, the residual pressure is
computed to be 81.7 psi. Each of these pressures exceed the 20 psi and
35 psi minimum pressure requirements, respectively.
Conclusion
The proposed 12 ", 8" and 6" water lines meet or exceed all of the design
criteria for the City of College Station. It will provide adequate water
pressure, Fowrate and velocity for both domestic and fire flow demands.
t
m
W
a
O
C�
V
O
o �
a W
4 �
WZ
W�U
O
W N
A m
R
a s
�s
U
a
a
z_
W
z
w g �
H�
g
0
O
I
CV
I
�
L li
LLJ
L L-
I�
Z
O
A
W
=�
'r
W
V)
0
J
Q
i CL
M w
3AllU UOSI3JS
i
v
O
O
(>
(n
Cl)
N
l
o
Cu
`O ca
O
a w
CV
N
N
�
I
0
a
w�
I N
z F —
�3¢
O
o
U
X J W
d �
O
U
iTi
ti^
p
U
�
U
e�
I
�
N un
to
3AUU 3snogxung
a
°-
91 -d
M
z
o
CO _
r=
I W
w
a
= U
c�
W
W O
w
V
�Ce LD
a o
i
�
a-
�v
wa
X Q_ W
waa
d
J e
01 -d
w
0
O
N OD N
a w
0`.d
!t_d
i
I
i
i
I
t
m
W
a
O
C�
V
O
o �
a W
4 �
WZ
W�U
O
W N
A m
R
a s
�s
U
a
a
z_
W
z
w g �
H�
g
EXHIBIT B
SCHULTZ ENGINEERING, LLC
FIRM #12327
WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT
Date: November 12, 2010
Water System Owner: Wellborn SUD
Development Project: Saddle Creek Subdivision — Brazos, Texas
Flow Test Location: Fire Hydrant on Saddle Creek Drive -Lot 148
Nozzle size (in.): 2.5
Pitot Reading (psi): 60
Flowrate (gpm): 1,300
Discharge Coeff: (c) = 0.90
Flowrate Formula: Q= 29.84cd
c = discharge coeff.
d = orifice size (in)
P = pitot pressure (psi)
Pressure Gauge Location: FH on Saddle Creek Drive — Lot 145
Static Pressure (psi): 86
Residual Pressure (psi): 69
Computed Discharge at 20 psi Residual Pressure: QR = 2,704 gpm
54 54
Discharge Formula: Q = Q X (hr 0.54 0. )
Note: The flow test and report were prepared in accordance with NFPA 291.
Report Prepared by:
Joseph P. Schultz
Others Present: Clenden Adams — Wellborn SUD
Britt Curless
Jeremy Lyon
Exhibit C
WaterCAD Analysis Summary
Junction Analysis - Domestic Demand
Elevation
Junction (ft)
Demand
(GPM)
Pressure
(PSI)
EXISTING FH
(FLOW TEST LOCATION)
27
0, 8 2.8
0 83.3
5 83.
J1
278.5
J2
277
PROPOSED FH 1
282
0
81.7
J4
278.5
14
83.
J5
274
6
85.
PROPOSED FH 3
271.5
0
86.3
J6
270
0
8 7
- -- - J13 -_
__- 268
5
87.8
J7
273
0
85.7
EXISTING FH
274.5
0
85
J8
2 75
0
84.8
J9 - j -- --- 275 . 5
1221
84.5
J3
282
__.._
0
81.7
_ J10 _ 282
J11 278.5
J12 267.5
PROPOSED FH 2 278
EXISTING FH
(PRESSURE READING
LOCATION) 276.39,
20 1
17
0�
0
81.7
83.2
88
83.5
0'
84.2
Exhibit C
WaterCAD Analysis Summary
Pipe Analysis - Domestic Demand
Pipe
Number
i
Length (ft) I Start Node 1
Pipe
End Node Size (in) Material
Hazen -
William C-
Value
Pipe Flow ! Velocity
(GPM) (ft /s)
P -1
P -2
165
EXISTING FH
(FLOW TEST LOCATION)
J1
PROPOSED FH 1
J1 I
J2
J I
PROPOSE FH 3
12
12
8
8
PVC
150
150 0. 42
299
PVC
150
150 0.42
P -5
522
PVC
150
4 0.03
P -8
258
J
PVC
150
-32 0.2
P -9
114
PROPOSED F 3
16
8
PVC
150
-32 0.2
P -17
158
16
4
PVC
150
5 _0
P -1
240
__
J6
_ J13
J7
8
P VC
150
-36 0.23 _
P -10
502
J7
EXISTING FH
8
PVC
150
-36 0.23
P -11
141
EXISTING FH
J8
8
PVC
150
- 0.23
P-13
72
J2
J9
12
PVC
150
122 0.34
P -3
239
J2
J3
8
PVC
150
24 0. 15
P-4
9
J3
PR OPOSE D FH 1
8
PVC
150
4 0.03
P -14
75
13
J10
6
PVC
15 0
20 0
P -15
78
_
J 4
Jl
8
PVC
1_50
17 0.1
P -16
370
J5
J12
8
PVC
150
0 0
P -6
177
J 4
PROPOSED FH 2
6
P VC
15_0
-26 0.29
P -7
548
PROPOSED FH 2
J5 6
R -1 12_
EXISTING FH
(PRESSURE READING
LOCATION) 12
EXISTING FH
(FLOW TEST LOCATION)
12
PVC
150
-26 0.2
P -21
40
J8
PVC
150
-186 0.53
P -22
276
J8
EXISTING FH
(PRESSURE READING
LOCATION)
PVC
150
150 0.42
P -23
618
PVC
150
150 0.42
Exhibit D
WaterCAD Analysis Summary
Junction Analysis - Fire Flow Demand
Junction
Elevation
(ft)
Demand
(GPM)
Pressure
(PSI)
EXISTING FH
(FLOW TEST LOCATION)
2
0
- 69.4
— _ --- - - - - 1 1 - - --
278.5
0
69.7
J2
2 77
570.2
PRO POSED FH 1
_
282
0
67.4
J4
_
2 78.5
14
_67.6
-
J5
2
_6
70.6
PROPOSED FH 3
271.5
_ 0
72
J6
270
0
72.
J13
268
5
73.7
J7
273
071.8
EXISTING FH
274.5
0
71.8
275-
0
71.8
_
J9
27 5.5
122
70.9
_
J3
282
0
67.4
J10
282
20
67.4
J
_ 278.5
1767.6
J12
267.5
0
73.5
PROP F H 2
EXISTING FH
(PRESSURE READING
LOCATION)
278
1000
66.3
276.39
0
71
Exhibit D
WaterCAD Analysis Summary
Pipe Analysis - Fire Flow Demand
Pipe
Number
Length (ft)
Start Node
End Node Size (in)
Pipe
Material
Hazen- j
William C- I
Value
Pipe Flow
(GPM) j
Velocity
(ft /s)
P -1
P -2
165
299
522
EXISTING FH
(FLOW TEST LOCATION) J1
J1 _ J2
P ROPOSED FH 1 J4
12
PVC
150
759
2.15
12
PVC
150
75 9
2.15
P -5
8
PVC
150
614
3.92
P -8
258
J5
PROPOSED FH 3
8
PVC
150
-422
2.69
P -9
114
P ROP O SED F 3
J6
8
PVC
150
-422
2. 69
P -17
158
J6
J13
4
PVC
150
5
0.11
P -10
240
J6
J7
8
PVC
150
-427
2.72
P -10
502
J7
EXISTING FH
8
PVC
150
-427
2.72
P -11
141
EXISTI FH
J8
8
PVC
150
-427
2.72
P -13
72
J2
J9
12
PVC
150
12 2
0.34
P -3
239
J2
J3
_ 8
PVC
150
633
4.04
_
P-4
9
J3
PROPOSED FH 1
8
P VC
150
614
3.92
_
P -14
75
J3
J10
J11
6
PVC
150
20
0.22
P - 15 _
78
J4
8
PVC
150
17
0.1
P -
3
_
J12
8
PVC
150
0
0 _
P -6
177
— J4
PROPOSED FH 2
6
PVC
150
584
6
P -7
548
PROPOSED FH 2
_
J5
6
PVC
150
-416
4.72
P -21
40
J8
R -1
12
PVC
150
-1186
3.36
P -22
P -23
276
618
EXISTING FH
J8 (PRESSURE READING
LOCA TION)_ 12
EXISTING FH EXISTING FH
(PRESSURE READING (FLOW TEST LOCATION)
LOCATION) 12
PVC
150
759 2.
759 2.15
PVC
150
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Saddle Creek Subdivision, Phase 713
Engineer's Estimate of Waterline Construction
Item
Description
Unit
Estimated
Quanti
Unit Price
Total
Water System
1
12" C909 Water Pipe, non - structural backfill
LF
234
30.00
7,012
2
12" C909 Water Pipe, structural backfill
LF
140
32.00
4,480
3
8" C909 Water Pipe, non - structural backfill
LF
1597
24.00
38,335
4
8" C909 Water Pipe, structural backfill
LF
234
26.00
6,071
5
6" C909 Water Pipe, non - structural backfill
LF
798
20.00
15,952
6
4" C909 Water Pipe, non - structural backfill
LF
157
16.00
2,512
7
18" PVC Sleeve for 6" & 8" Waterline
LF
160
20.00
3,200
8
20" PVC Sleeve for 12" Waterline
LF
80
30.00
2,400
9
Fire Hydrant Assembly (w /valve, vert. extension)
EA
3
3000.00
9,000
10
12" x 8" M.J. Tee
EA
1
650.00
650
11
8" x 8" M.J. Tee
EA
3
400.00
1,200
12
8" x 6" M.J. Tee
EA
1
350.00
350
13
8" x 4" M.J. Reducer
EA
1
250.00
250
14
8" x 6" M.J. Reducer
EA
2
275.00
550
15
12" M.J. Gate Valve
EA
1
1,400.00
1,400
16
8" M.J. Gate Valve
EA
8
950.00
7,600
17
6" M.J. Gate Valve
EA
2
750.00
1,500
18
12" 45° M.J. Bend
EA
4
450.00
1,800
19
8" 22.5° M.J. Bend
EA
9
350.00
3,150
20
4" 45° M.J. Bend
EA
3
150.00
450
21
2" Blowoff Assembly
EA
4
550.00
2,200
22
4" Blowoff Assembly
EA
1
650.00
650
23
Connect to Existing Water Line
EA
2
500.00
1,000
24
1" Water Service - short side
EA
3
300.00
900
25
1" Water Service - long side w/PVC sleeve
EA
2
600.00
1,200
26
1.5" Water Service - short side
EA
4
450.00
1,800
27
1.5" Water Service - long side w/PVC sleeve
EA
3
800.00
2,400
28
Meter Boxes
EA
19
75.00
1,425
ESTIMATED WATERLINE CONSTRUCTION
1 $119,437
e OF
* : :*
.............................
JOSEPH P. SCHULTZ
6588 A: n
F -12327
SCHULTZ ENGINEERING, LLC.
Zf N
a � u�