HomeMy WebLinkAbout10-00500121- 00076686RESPONSE TO STAFF REVIEW COMMENTS NO. 1 Project: CASTLE ROCK PH 7 & 8 (FP) - 10- 00500121 �NNING Please reference the PDD rezoning ordinance number in note #3. (Ord. # 2814) Note No. 3 has been revised to reference the PDD ordinance number. Please list the total number of lots in the title block (46 + 1 common area). / The total number of lots has been listed in the title block. "3 label and show volume and page of all existing easements both on site and adjacent to the property. The existing easements have been labeled. Once the Phase 5 plat is fled, the volume and page numbers can be added for those easements. 4. I show a Temporary Access Easement (v8433 p12) off of Castle Rock Parkway. This easement is located at the end of Hollow Stone Drive in Phase 5 not as shown on the GIS. A copy of the easement is attached. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. The following changes have been made at the request of the surveyor. • The note section has been moved up. • The line and curve tables have been enlarged. • The distances in the line table have been rounded to 2 decimal places • The bearings in the line table have been rounded to the nearest second • The leading zeros in the curve table deltas have been removed • All of the boundary labels have been reversed to read clockwise. • Phase 8 has been tied to the College Station Monument No. 138 Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Noted. The construction documents and reports are still under review and may affect the plat. Noted. ENGINEERING COMMENTS NO. 1 1. The scale or labeled dimensions seem to be slightly off (i.e. a 50 -ft right -of -way measures 48 -ft). The scale of the drawing has been corrected. 2. Note #7 should also reference the pending LOMR. The note has been revised to reference the pending LOMR. 3. Engineering documents are still under review and may affect the final plat. Noted. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. All easements on site are existing. Electric facilities will be designed within existing easements Noted. 2. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. Noted. 3. The following easements will be required: ➢ Phase 8 Block 5 (lots 10,11)(13,14) is need 10' PUE ➢ Phase 8 Block 1 (lots 9,10)(13,14) is need 10' PUE The easements have been added as requested. STAFF REVIEW COMMENTS NO. 1 Project: CASTLE ROCK PH 7 & 8 (FP) - 10- 00500121 PLANNING ✓( Please reference the PDD rezoning ordinance number in note #3. (Ord. # 2814) 2. Please list the total number of lots in the title block (46 + 1 common area). 3. Please label and show volume and page of all existing easements both on site and adjacent to the property. 4. 1 show a Temporary Access Easement (v8433 p12) off of Castle Rock Parkway. 5. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 6. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. 7. The construction documents and reports are still under review and may affect the plat. Reviewed by: Jennifer Prochazka Date: June 17, 2010 ENGINEERING COMMENTS NO. 1 1. The scale or labeled dimensions seem to be slightly off (i.e. a 50 -ft right -of -way measures 48 -ft). 2. Note #7 should also reference the pending LOMR. 3. Engineering documents are still under review and may affect the final plat. Reviewed by: Erika Bridges Date: 6/21/10 GREENWAYS No comments Reviewed by: Venessa Garza, Greenways Program Manager Date: June 15, 2010 SANITATION 1. Sanitation is okay with this project. Reviewed by: Wally Urrutia Date: June 16, 2010 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. All easements on site are existing. Electric facilities will be designed within existing easements 2. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 3. The following easements will be required: ➢ Phase 8 Block 5 (lots 10,' 1)(13,14) is need 10' PUE ➢ Phase 8 Block 1 (lots 9,10)(13,14) is need 10' PUE GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review.2 of 3 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: ehorton @cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact at Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date: 06/16/10 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review.3 of 3