Loading...
HomeMy WebLinkAboutApplicaton(*O F"" CITY 01: COL LIXA: STATION Home of fi=s A &i 11 un"Veniry FINAL PLAT APPLICATION (Check one) ❑ Minor ❑ Amending ❑X Final ❑ Vacating ❑Replat ($500.00) ($500.00) ($668.00) ($668.00) ($668.00) Is this plat in the ETJ? ❑ Yes FXJ No Is this plat Commercial ❑X or Residential ❑ MINIMUM SUBMITTAL REQUIREMENTS: ❑X $500 -$668 Final Plat Application Fee (see above). ❑ $167 Variance Request to Subdivision Regulations Fee (if applicable). ❑X $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 0.75% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ❑X Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) ❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ❑X Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). ❑ Notice of Intent (NOI) if disturbed area is greater than five (5) acres cumulatively. ❑ Copy of original deed restrictions /covenants for replats (if applicable). ❑X Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. C]] Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. ❑ Proof of parkland dedication consideration by the Parks & Recreation Board or Parks & Recreation Department (if applicable). ❑X The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plat must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plat project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT B elmont Place, Section Three, Lot 1, Block Five ADDRESS SPECIFIED LOCATION OF PROPOSED PLAT: Southeast corner of Birmingham Drive and Longmire Drive APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name A dam Group Mgmt Services & Ada Development Properties E -mail Street Address 1111 Briarcrest Drive, Ste 300 City Bryan State Tx FOR OFFICE US.E ONLY CASE NO.: DATE SUBMITTED TIME: STAFF: Zip Code 77802 Phone Number 979 -776 -1111 10/09 Fax Number 979- 776 -6288 Page 1 of 7 a PROPERTY OWNER'S INFORMATION (ALL owners must be identified. Please attach an additional sheet for multiple owners): Name Same as applicant E -mail Street Address City State Zip Code Phone Number Fax Number ARCHITECT OR ENGINEER'S INFORMATION: Name McClure & Browne Engineering /Surveying, Inc Street Address 1008 Woodcreek Dr., Ste. 103 City College Station Phone Number 979 - 693 -3838 E -mail leffr@mcc/urebrowne.com State Tx Zip Code 77845 Fax Number 979- 693 -2554 Do any deed restrictions or covenants exist for this property? Yes ❑ No QX Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No. Total Acreage 6.423 Total No. of Lots 1 R -O -W Acreage 0.202 Existing Use open Proposed Use commercial Number of Lots By Zoning District 1 / C -1 Average Acreage Of Each Residential Lot By Zoning District: 6.42 / C -1 Floodplain Acreage 0 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? A statement addressing any differences between the Final Plat and Preliminary Plat (if nnniirnhlal- r Yes r No _ots 1 and 2 were combined into a large singe lot. iequested variance to subdivision regulations and reason for same (if applicable): VIA Regarding the variance request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. 2. The waiver is necessary for the preservation and enjoyment of a substantial property riaht of the applicant_ 10/09 Page 2 of 7 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other Drooertv in the area, or to the City in administering subdivision regulations. Requested Oversize Participation N /A Total Linear Footage of Proposed Public: Streets 385 Sidewalks Sanitary Sewer Lines Water Lines Channels Storm Sewers Bike Lanes I Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE: No, of acres to be dedicated + $ development fee No. of acres in floodplain No. of acres in detention No. of acres in greenways OR FEE IN LIEU OF LAND: No. of SF Dwelling Units X $ = $ (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. B ature and title n oel C. Ross Vice President, Adam Group Management Services, Inc. Senior Vice President, Adam Development Properties GP, L.L.C., general partner of Adam Development Properties, L.P. O ctober 30, 2009 Date 10/09 Page 3 of 7 GENERAL PROVISIONS FOR DEVELOPMENT PERMIT 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no work is commenced within 24 months of issuance. 6. Applicant is hereby informed that other permits may be required to fulfill local, state, and federal regulator requirements. 7. Applicant hereby gives consent to the City representatives to make reasonable inspections required to verify compliance. 8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 9. I, THE OWNER, CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. By: G �,�-� ' ' October 30, 2009 Propeyt' wner(s) Joel C. Ross, Vice President Date Ada oup Management Services, Inc., Senior Vice President, Adam Development Properties GP, L.L.C., general partner of Adam Development Properties, L.P. ACKNOWLEDGMENTS (required for all development): Adam Group Management Services, Inc. & Adam Development Properties, L.P. the owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. October 30, 2009 Pr y Owners) Joel C. Ross, Vice President �ate Ada 'oup Mana ement Services, Inc., Senior Vice President Adam Development Prnperties GP. �.L.C.. ceneral partner of Adam Development properties, L.P. 2 I Adam Group Management Services, Inc. & Adam Development Properties, L.P. , certify that all necessary State and Federal permits will be obtained prior to construction. By: L 20 1 October 30, 2 009 Pr y Owner(s) Joel C. Ross, Vice President Ad roup Management Services, Inc., Senior VRce President, Properties GP. L.L.C.. general partner of Adam Development P Adam Development operties. L.P. Adam Group Management Services, Inca & Adam I ' Development Properties, L. P the Owner, authorize release of plans to for bidding purposes only. I understand that final approval and release of plans for construction is contingent on contractor signature on approved Development Permit. B October 30, 2009 Pr rtyOwner(s) Joel C. Ross, Vice President Date Adam Group Management Services, Inc., Senior Vice President, Adam Development erties GP, L.L.C., general partner o roperti.es, L.r. 10/09 Page 4 of 7 ENGINEERING CERTIFICATIONS (required for development in Special Flood Hazard Areas): A. 1, certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 -year storm. Engineer Date B. 1, certify that the finished floor elevation of the lowest floor including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and map, as amended. Engineer Date C. 1, certify that the alterations or development covered by this permit shall not diminish the flood - carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodway fringes. Engineer Date D. 1, certify that the proposed alterations do not raise the level of the 100 -year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval: 10/09 Page 5 of 7 Ci - svra -C;xa e.i0 tirceum FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) ❑X Drawn on 24" x 36" sheet to scale of 100' per inch. 0 Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. ❑X Title Block with the following information: ❑X Name and address of subdivider, recorded owner, planner, engineer and surveyor. 0 Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos County 911.) 0 Date of preparation. X❑ Engineer's scale in feet. ❑X Total area intended to be developed. 0 North Arrow. ❑X Subdivision boundary indicated by heavy lines. ❑ If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. 0 All applicable certifications based on the type of final plat. 0 Ownership and Dedication 0 Surveyor and /or Engineer 0 City Engineer (and City Planner, if a minor plat) 0 Planning and Zoning Commission (delete if minor plat) ❑X Brazos County Clerk ❑ Brazos County Commissioners Court Approval (ETJ Plats only) ❑ If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. ❑ If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant to the provisions of Section 21.004 of the Texas Water Code. ❑ Location of the 100 -Year Floodplain and floodway, if applicable, according to the most recent available data. ❑X Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. ❑X Matches the approved preliminary plat. n The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Existing Proposed n ❑ Streets. Continuous or end in a cul -de -sac, stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. 0 0 Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s sufficient to meet Thoroughfare Plan.) 0 ❑ Street offsets and /or intersection angles meet ordinance. 10/09 Page 6 of 7 Existing Proposed ❑ ❑ Alleys. ❑R Easements. ❑X Q A number or letter to identify each lot or site and each block (numbered sequentially). ❑ ❑ Parkland dedication /greenbelt area /park linkages. All proposed dedications must be reviewed by the Parks and Recreation Board and documentation of their recommendation provided prior to being scheduled for P & Z Commission consideration. It is the responsibility of the applicant to provide documentation from the Parks Department of the Board's recommendation. 0 Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following: ©❑ Street, alley and sidewalk plans, profiles and street, alley and /or sidewalk layout of the utilities). Sewer Design Report. sections. One sheet must show the overall subdivision. (may be combined with other Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision. (Utilities of sufficient size /depth to meet the utility master plan and any future growth areas.) Water Design Report and /or Fire Flow Report. Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient size /depth to meet the utility master plan and any future growth areas.) ❑ Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage channels, with profiles and sections. Drainage and runoff areas, and runoff based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention if used. One sheet must show the overall drainage layout of the subdivision. Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. ❑ Drainage Report with a Technical Design Summary. ❑ Erosion Control Plan (must be included in construction plans). ❑ All off -site easements necessary for infrastructure construction must be shown on the final plat witha volume and page listed to indicate where the separate instrument easements were filed. Separate instrument easements must be executed prior to being scheduled for P &Z Commission consideration. XJ Are there impact fees associated with this development? ❑ Yes ❑X No Impact fees must be paid prior to building permit. ❑x Will any construction occur in TxDOT rights -of -way? ❑ Yes FXj No If yes, TxDOT permit must be submitted along with the construction documents. NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat at the Courthouse. 2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOI) must be submitted prior to issuance of a development permit. 10/09 Print=Form Page 7 of 7