Loading...
HomeMy WebLinkAboutMiscMcCLURE & BROWNE ENGINEERING /SURVEYING, INC. 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 (979) 693 -3838 • Fax: (979) 693 -2554 • Email: MCClureRrowne(a�Verizon.net q4 August 3, 2009 Ms. Erika Bridge, EIT City of College Station Post Office Box 9960 College Station, TX 77842 Re.: LETTER ACKNOWLEDGING CITY STANDARDS Pebble Creek Center Sidewalks MBESI No. 1065 -0001 Dear Ms. Bridges: The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above - referenced project, to the best of my knowledge, do not deviate from the B /CS Design Guideline Manual. I also acknowledge, to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan /College Station Standard Details. Sincerely, t L, L. ertson ect Engineer F:\1065 - Davis Young \0009 - 44 Acre Commercial Development \Correspondence \Letter Acknowledging City Standards.wpd