HomeMy WebLinkAboutStaff ReportCITY OF COLLEGE STATION
FINAL PLAT
for
Gateway Subdivision
Phase 1, Block 1,
Lots 9R-1 A thru 9R-1C
Being a Replat
of the
Gateway Subdivision
Phase 1, Block 1, Lot 9R-1
11-00500011
SCALE: 3 lots totaling 3.27 acres
LOCATION: 500 Earl Rudder Freeway South, generally located behind Home
Depot near the intersection of State Highway 6 and University
Drive
ZONING: R-4 Multi-Family and A-O Agricultural Open
APPLICANT: David Scarmado, DWS Development Inc.
PROJECT MANAGER: Matthew Hilgemeier, Staff Planner
mhilgemeier@cstx.gov
RECOMMENDATION: Approval with the condition that the attached Staff Review
Comments are addressed.
Planning & Zoning Commission Page 1 of 3
March 3, 2010
Planning & Zoning Commission Page 2 of 3
March 3, 2010
DEVELOPMENT HISTORY
Annexation: February 1971
Zoning: R-1, Single-Family Residential upon annexation, R-1, Single-
Family Residential to C-B, Commercial Business (1995), C-B
Commercial Business to C-1 General Commercial (2003), C-1
General Commercial to R-4 Multi-Family Residential and A-O
Agricultural Open (2007)
Preliminary Plat: Preliminary Plat -The Gateway (1999)
Final Plat: Final Plat - Gateway Phase 1 (1999)
Final Plat (Replat) - Gateway Phase 1, Block 1, Lots 1 A, 5A, 9, 10,
&11 (2002)
Final Plat (Replat) - Gateway Phase 1, Block 1, Lot 9R (2007)
Final Plat (Replat) - Gateway Phase 1, Block 1, Lot 9R-1 and Lot
9R-2 (2009)
Site Development: This site has an approved site plan for 32 multi-family units
(2009). Currently, all necessary infrastructure required of the
approved site plan is installed and the parking lot is constructed.
COMMENTS
Parkland Dedication: This development is proposed to have 32 single-family dwelling
units within Park Zone 2. A dedication of $14,464 will be required
prior the issuance of a building permit.
Greenways: N/A
Pedestrian Connectivity: Sidewalks are not required for this replat.
Bicycle Connectivity: N/A
Impact Fees: N/A
REVIEW CRITERIA
Compliance with Subdivision Regulations: This proposed subdivision is in compliance with
the Subdivision Regulations except for the attached Staff Review Comments which will need to
be addressed before the plat can be filed for record.
STAFF RECOMMENDATIONS
Staff recommends approval with the condition that the attached Staff Review Comments are
addressed.
SUPPORTING MATERIALS
1. Application
2. Copy of Staff Review Comments
3. Copy of Final Plat (provided in packet)
Planning & Zoning Commission Page 3 of 3
March 3, 2010