HomeMy WebLinkAbout10-00500270- 00076334-is_- ins 1> >s - Pnma~v✓k Ctwt:-~-c+ zal- . 4515p i 1 d Jc-el c 1 r ~ i Scott & White CS Meeting Agenda February 1, 2011 Introductions Update on Current Status on o Church Demo P Electric Demo/Relo/Burial/Shared Poles/Site Service, etc Water Tower and Lift Station - TxDOT approvals p 20' PUE abandonment for Rock Prairie Heights/Weingarten Bond Release ,o Release process for easements adjacent to Old Rock Prairie • Review status for Site Plan, Subdivision Improvements • Review status for Final Platting & separate instrument easements • Construction Package Approvals • Next steps/Schedule 1 C' 1\~ ii' . h je ~ 7 y' t CO CS - -T~ . 4.4 cl , tic s OI.AA Jae, / L c~t~ 6thvz wlo ' r f ( f ! ~ ~ PC k .r r Cam--~, , s 5 n t t S } r _ l Y lu, r _ E a, r ` 1 19 1 . F? Y A s _ s ♦y , . c t_ L S&W College Station Site Meeting Agenda March 30, 2011 t~ Introductions n~ Overview of the latest project status from all parties o S&W & Jacobs for Corps permit, Temp Blank~Easement, schedule, etc o City Update (if necessary) • Discuss PDD Zoning Amendment status GLIB Discuss staying on April 7 agenda (Final Plat, Scarmardo, Plans, LOC, etc) v.•' Discuss Lift Station location • Discuss Site Plan comments for screening & signage ly t • Resubmittal schedule • Other items ^Y LE7 _ ~Ltx (~.UC iA 1 lJ (f_ s S&W College Station Site Meeting Agenda March 1, 2011 Introductions ;J✓ Overview of the latest project status from all parties ~ S&W & Jacobs o City Update (if necessary) lo' Discuss NRA & turn bays compromise Discuss Lift Station location Resubmittal schedule 9I"Other items w-cAl ,IC, GKn(;, -C)aA'l S &G'Aj cL Isar ,k~() Y maw za VAZ e3)i7:e, (cuTn iT 7c~ Project: Scott & White Hospital @ College Station Project No: 5603B Meeting Date: March 1, 2011 Meeting Time: 10:00 am Location: KCI Jobsite Conference Room Objective: Review all aspects of the S & W Package No. 1 Sitework AGENDA: OPENING COMMENTS 1) Attendee Introduction 2) Team Member Contact Information 3) Trade Contractor Summary Cen-Tex Hydroseed (Erosion/Sedimentation Controls) - Ranger Excavating, L.P (Mass Excavation & Grading) - Pavements & Hardscape (Brazos Paving, Inc.) - Site Utilities & Drainage (Joslin Construction) - Site Electrical (Prism Electric) - Site Plumbing (TDlndustries) SAFETY 1) Safety Program Basis a) Kitchell Contractors Site Specific Safety Plan b) Applicable OSHA requirements c) Accident/Incident policies d) Miscellaneous Site specific safety plan Competent person assignment Hazard communication program Job hazard analysis Monthly project safety meetings Weekly 'toolbox' talks Periodic safety team site reviews 2) Project Orientation a) Mandatory participation 3) Miscellaneous a) Personal Protective Equipment b) Existing Overhead Utility Lines C) Existing Underground Utilities d) Perimeter Fencing Enclosure e) Exposed Reinforcement f) Trench Safety/Barricades/Covers No spoils within 10' of excavation edge Fall protection Stepped/sloped/shored when excavation is 5' or deeper from adjacent grade Design of shoring systems at discretion of KCI g) Protection of new and existing construction 1 of 3 2/23/2011 C L STAGING AND LOGISITICS 1) Site Access a) Construction Entrances b) Parking C) Gate access 3) Traffic Control a) Trade contractor responsibilities - Development and submission of traffic control plans Adherence to all prevailing jurisdictional authorities Certified flag men 3) Dust Control a) Sole responsibility of trade contractors Street sweeping as required Pressure washing/hosing of haul trucks as required SCHEDULE 1) Construction Milestones a) Site demolition/Clear & grub (Ranger) - 2/28/11 b) Site grading (Ranger) 3/14/11 C) Wet pond rough cut (Ranger) - 3/14/11 I~ d) South detention/Existing Ponds (Ranger) 3/21/11 ~v e) Mass Excavation (Ranger) 4/01/11 (CUP) - G~ f) Building Pad Construction (Ranger) 4/12/11 -Site Utilities (Joslin Construction) - Pr--IvaTo~ h) Site Natural Gas (Owner) 3/28/1 1~- i) Pavements & Hardscape (Brazos Paving) 5/09/11 j) BTU/CSU/Suddenlink Relocation (Prism) 5/16/11 k) Existing Overhead Line Relocation (CSU/BTU) 6/01/11 1) TXDOT State Highway 6 Deceleration Lanes 6/06/11 CITY OF COLLEGE STATION 1) Inspection Procedures a) Notifications/Schedules b) Documentation CONSTRUCTION MATERIALS TESTING 1) Scope a) Observations b) Soil sample analysis c) Field density and moisture testing 2) Procedures a) Notifications/Schedules b) Reporting 2of3 2/23/2011 C LI PERMIT STATUS 1) City of College Station Clearing & Grading Development Permit a) 2/18/11 Issuance 2) TXDOT Deceleration Lane Construction a) 2/15/11 Issuance EROSION & SEDIMENTATION CONTROLS 1) Plan Development a) Jacobs Engineering Group 2) Plan Implementation a) KCI/Cen Tex Hydroseed 3) Plan Record Documentation/Maintenance a) KCI 4) Miscellaneous a) Tree protection Specification section 015639 b) Established plan field modifications MASS EXCAVATION & GRADING 1) Exposed Subgrades a) Moisture conditioning 2) Over-Excavation/Select Fill a) Tower b) CUP C) Utility Tunnel 3) Backfill/Compaction a) Building , b) Site W4) Miscellaneous a) Proctor sampling PAVEMENTS & HARDSCAPE 1) Subgrade Preparation a) Lime stabilization series testing 2) Pavement Systems a) Rigid in lieu of flexible SITE UTILITIES & DRAINAGE 1) Systems a) Site primary and branch electrical service b) Site plumbing (ie fuel oil and medical oxygen C) Storm drainage d) Waste water e) Water service distribution 2) Miscellaneous a) Multiple trade coordination b) Utility crossings c) Bryan/College Station Unified Design Guidelines 3of3 2/23/2011 C~-' I ~