HomeMy WebLinkAbout03-00500165- 00076265 CITY OF COLLEGE STATION
c i DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
July 16, 2003
TO: ‘/Randy French, Stylecraft Builders, Via fax 690.6069
FROM: Bridgette George, Assistant Development Manager
SUBJECT: WESTFIELD ADDITION PH 3 -B (FP) - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Monday, July 28,
10:00 a.m., your project will be placed on the next available Planning and Zoning
Commission meeting scheduled for, August 7, 2003, 7:00 p.m. in the City Hall Council
Chambers, 1101 Texas Avenue.
Two (2) copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college- station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will not be scheduled for a Planning &
Zoning Commission meeting. Your project may be placed on a future agenda once all
the revisions have been made and the appropriate fees paid. If you have any questions
or need additional information, please call or myself at 764 -3570.
Attachments: Staff review comments
cc: ✓ Michael McClure, McClure Engineering Inc., Via fax 693.2554
Case file #03- 00500165
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: WESTFIELD ADDITION PH 3 -B (FP) - 03- 00500165
ENGINEERING
1. It was my understanding that this plat would qualify as a Minor Plat as described
under the State statute. However, City Staff has determined that any easement
shown to be dedicated by plat implies "extension of municipal facilities ". Therefore,
it must be approved by the P &Z. Please change the certifications to P &Z and City
Engineer. The plat should be on schedule for P &Z 8/7/03 meeting as a consent
item.
Reviewed by: Spencer Thompson Date: July 16, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
4. Developer provides digital AutoCAD 2002 version of plat and /or site plan.
email to rbolin aacstsx.gov
5. Developer installs street lighting per city specs and design.
6. Developer provides temporary blanket easement for construction
purposes.
7. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date: 7 -16 -03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 2
MEMORANDUM
July 29, 2003
TO: Planning and Zoning Commission
FROM: Spencer Thompson
Email: sthompson @cstx.gov
SUBJECT: FINAL PLAT - for WESTFIELD ADDITION PH 3 -B (FP)
Item: Consideration, discussion, and possible action on a Final Plat for the
Westfield Addition Ph 3 -B (FP) consisting of 4 lots on 0.63 acres, generally
located at Meadow View Drive and Graham Road. (03- 00500165)
Applicant: Randy French for BCS Development Co.
Staff Recommendations: Staff recommends approval as submitted.
Item Summary: These four lots are the remaining portion of Westfield Addition
Phase 3, platted in 2002. The lots were without water service until recently when
it was installed with Westfield Addition Phase 2B, across Meadow View. The lots
now comply with all Subdivision Regulations.
Comprehensive Plan Considerations:
Land Use Plan: Single- family residential
Thoroughfare Plan: Graham Road is a major collector.
Parkland Dedication: Park dedicated with Phase 1.
Open Space Dedication: Greenway dedicated with Phase 3.
Special Area Plans: N/A
Attachments:
1. Area map
2. Application