Project Manager: Spencer Thompson Date: September 10, 2003
Email: sthompson @cstx.gov
Item: Consideration, discussion, and possible action on a Final Plat for
Edelweiss Gartens PH 5 consisting of 98 lots on 21.3 acres generally located at
Brandenburg Lane and Hartford Drive.
Applicant: Mr. Steve Arden
Staff Recommendations: Staff recommends approval of the Final Plat as
submitted.
Item Summary: The Final Plat is generally compliant with the approved
Preliminary Plat. The Developer has added a drainage ROW along the
southeast property line. All affected lots still meet minimum requirements. The
subject property is zoned R -1 on the west side of Brandenburg. The east side of
Brandenburg is zoned R -3. Block 11 includes an additional area to be dedicated
as parkland contiguous with the existing park.
Comprehensive Plan Considerations:
Land Use Plan: Single- family residential.
Thoroughfare Plan: None in the area.
Parkland Dedication: Dedication requirements have been met with the
dedication of the 7.7 acre park.
Sidewalks: Sidewalks are required on both sides of Brandenburg and one side
of the remaining residential streets. .
Compliance with Preliminary Plat: Compliant except for the drainage ROW.
Compliance with Subdivision Regulations: Plat is in compliance.
Zoned: R -1 and R -3 as noted above.
Budgetary & Financial Summary: No official request has been received to
date. The Project engineer has discussed OP for a sewer line to serve this
developments, the adjacent development and future development across SH 40.
Related Advisory Board Recommendations:
Parks Board: Approved dedicated park.
Commission Action Options: The Commission has final authority over the final
plat. The options regarding the final plat are:
• Approval with conditions;
• Approval as submitted;
Supporting Materials:
1. Location Map
2. Application
3. Infrastructure and Facilities
4. Copy of Final Plat on wall in Council Chambers
INFRASTRUCTURE AND FACILITIES
Water required for plat: 8" water line along Brandenburg, 8" connection
to Phase 4, extension to Phase 6.
Water Service: Domestic and fire service to platted lots.
Sewer required for plat: Sewer extension along Brandenburg.
Sewer Service: Sewer service to platted Tots.
Street(s) required for plat: All streets shown on plat.
Streets /Access: No residential access to Brandenburg.
Off -site Easements required for plat: A PUE is required to supply
sewer service to this site from Westfield Village. The required easement
has been submitted to the City.
Drainage: Drainage is to a branch of Lick Creek through the park. City
staff has requested that construction not impair the natural creek of the
greenway area.
Flood Plain: None shown on plat.
Oversize request: See Budgetary and Financial Summary Section.
Impact Fees: None
Parkland Dedication Fees: The current development fee for single -
family residential is $358 per dwelling unit. The parkland fee is not
applicable due to land dedication.
COLLEGE STATION
•
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: $ e 'e irck n
8Y6- 65
FROM: Susan Hazlett, Staff Assistant
DATE: September 10, 2003
RE: Staff Report
P &Z Meeting, September 18, 2003
Following this coversheet is a copy of the Staff Report that was prepared for the following
project. Please keep in mind that staffs responsibility is to provide the Planning & Zoning
Commission with all pertinent facts of a development case, but that staff is not acting as an
advocate for the applicants. Therefore, it is in the applicant's best interest to send a
representative to the Planning & Zoning Commission meeting to speak on behalf of the
proposal.
This item is scheduled for the Thursday, September 18, 2003 Planning & Zoning
Commission Meeting. This meeting will begin at 7:00 P.M. in City Hall Council
Chambers. I have included a copy of the agenda for this meeting. Please contact our
office at (979)764 -3570 if you should have any questions. Thanks.
STAFF REPORT
Project Manager: Spencer Thompson Date: September 10, 200
Email: sthompson @cstx.gov
Item: Consideration, discussion, and possible action on a Final Plat for
Edelweiss Gartens PH 5 consisting of 98 lots on 21.3 acres generally located at
Brandenburg Lane and Hartford Drive.
Applicant: Mr. Steve Arden
Staff Recommendations: Staff recommends approval of the Final Plat as
submitted.
Item Summary: The Final Plat is generally compliant with the approved
Preliminary Plat. The Developer has added a drainage ROW along the
southeast property line. All affected lots still meet minimum requirements. The
subject property is zoned R -1 on the west side of Brandenburg. The east side of
Brandenburg is zoned R -3. Block 11 includes an additional area to be dedicated
as parkland contiguous with the existing park.
Comprehensive Plan Considerations:
Land Use Plan: Single- family residential.
Thoroughfare Plan: None in the area.
Parkland Dedication: Dedication requirements have been met with the
dedication of the 7.7 acre park.
Sidewalks: Sidewalks are required on both sides of Brandenburg and one side
of the remaining residential streets. .
Compliance with Preliminary Plat Compliant except for the drainage ROW.
Compliance with Subdivision Regulations: Plat is in compliance.
Zoned: R -1 and R -3 as noted above.
Budgetary & Financial Summary: No official request has been received to
date. The Project engineer has discussed OP for a sewer line to serve this
developments, the adjacent development and future development across SH 40.
Related Advisory Board Recommendations:
Parks Board: Approved dedicated park.
Commission Action Options: The Commission has final authority over the final
plat. The options regarding the final plat are:
• Approval with conditions;
• Approval as submitted;
Supporting Materials:
1. Location Map
2. Application
3. Infrastructure and Facilities
4. Copy of Final Plat on wall in Council Chambers
INFRASTRUCTURE AND FACILITIES
Water required for plat: 8" water line along Brandenburg, 8" connecJon
to Phase 4, extension to Phase 6.
Water Service: Domestic and fire service to platted Tots.
Sewer required for plat: Sewer extension along Brandenburg.
Sewer Service: Sewer service to platted lots.
Street(s) required for plat: All streets shown on plat.
Streets /Access: No residential access to Brandenburg.
Off -site Easements required for plat: A PUE is required to supply
sewer service to this site from Westfield Village. The required easement
has been submitted to the City.
Drainage: Drainage is to a branch of Lick Creek through the park. City
staff has requested that construction not impair the natural creek of the
greenway area.
Flood Plain: None shown on plat.
Oversize request: See Budgetary and Financial Summary Section.
Impact Fees: None
Parkland Dedication Fees: The current development fee for single -
family residential is $358 per dwelling unit. The parkland fee is not
applicable due to land dedication.
•
COLLECL ST ATIOP
•
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: LI 6 Al . 6L.,
L93 -A554
FROM: Susan Hazlett, Staff Assistant
DATE: September 10, 2003
RE: Staff Report
P &Z Meeting, September 18, 2003
Following this coversheet is a copy of the Staff Report that was prepared for the following
project. Please keep in mind that staff's responsibility is to provide the Planning & Zoning
Commission with all pertinent facts of a development case, but that staff is not acting as an
advocate for the applicants. Therefore, it is in the applicant's best interest to send a
representative to the Planning & Zoning Commission meeting to speak on behalf of the
proposal.
This item is scheduled for the Thursday, September 18, 2003 Planning & Zoning
Commission Meeting. This meeting will begin at 7:00 P.M. in City Hall Council
Chambers. I have included a copy of the agenda for this meeting. Please contact our
office at (979)764 -3570 if you should have any questions. Thanks.
STAFF REPORT
Project Manager: Spencer Thompson Date: September 10, 200&
Email: sthompson @cstx.gov
Item: Consideration, discussion, and possible action on a Final Plat for
Edelweiss Gartens PH 5 consisting of 98 lots on 21.3 acres generally located at
Brandenburg Lane and Hartford Drive.
Applicant: Mr. Steve Arden
Staff Recommendations: Staff recommends approval of the Final Plat as
submitted.
Item Summary: The Final Plat is generally compliant with the approved
Preliminary Plat. The Developer has added a drainage ROW along the
southeast property line. All affected Tots still meet minimum requirements. The
subject property is zoned R -1 on the west side of Brandenburg. The east side of
Brandenburg is zoned R -3. Block 11 includes an additional area to be dedicated
as parkland contiguous with the existing park.
Comprehensive Plan Considerations:
Land Use Plan: Single- family residential.
Thoroughfare Plan: None in the area.
Parkland Dedication: Dedication requirements have been met with the
dedication of the 7.7 acre park.
Sidewalks: Sidewalks are required on both sides of Brandenburg and one side
of the remaining residential streets. .
Compliance with Preliminary Plat Compliant except for the drainage ROW.
Compliance with Subdivision Regulations: Plat is in compliance.
Zoned: R -1 and R -3 as noted above.
Budgetary & Financial Summary: No official request has been received to
date. The Project engineer has discussed OP for a sewer line to serve this
developments, the adjacent development and future development across SH 40.
Related Advisory Board Recommendations:
Parks Board: Approved dedicated park.
Commission Action Options: The Commission has final authority over the final
plat. The options regarding the final plat are:
• Approval with conditions;
• Approval as submitted;
Supporting Materials:
1. Location Map
2. Application
3. Infrastructure and Facilities
4. Copy of Final Plat on wall in Council Chambers
INFRASTRUCTURE AND FACILITIES
Water required for plat: 8" water line along Brandenburg, 8" connection
to Phase 4, extension to Phase 6.
Water Service: Domestic and fire service to platted lots.
Sewer required for plat: Sewer extension along Brandenburg.
Sewer Service: Sewer service to platted lots.
Street(s) required for plat: All streets shown on plat.
Streets /Access: No residential access to Brandenburg.
Off -site Easements required for plat: A PUE is required to supply
sewer service to this site from Westfield Village. The required easement
has been submitted to the City.
Drainage: Drainage is to a branch of Lick Creek through the park. City
staff has requested that construction not impair the natural creek of the
greenway area.
Flood Plain: None shown on plat.
Oversize request: See Budgetary and Financial Summary Section.
Impact Fees: None
Parkland Dedication Fees: The current development fee for single -
family residential is $358 per dwelling unit. The parkland fee is not