Loading...
HomeMy WebLinkAbout03-00500176- 00076215 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 18, 2003 TO: Steve Arden, Edelweiss Gartens Venture, Via fax 846.0652 FROM: Bridgette George, Assistant Development Manager SUBJECT: EDELWIESS GARTENS PH 5 (FP) — Construction Documents Staff reviewed the above - mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Two (2) sets of revised construction documents. If you have any questions or need additional information, please call Spencer Thompson at 764.3570. Attachments: Staff Review Comments Cc: Michael McClure, McClure Engineering Inc., Via fax 693.2554 ✓ Case file no. 03- 00500176 Home of Texas ABM University r ENGINEERING REVIEW COMMENTS No. 1 1. All public utilities must be in a PUE. PUE must be submitted to the City for plans approval. 2. Sheet 7: Storm Drain Sta. 20 +90.19 does not meet Drainage Policy and Design Standards (DPDS) § VI, B, 3. 3. Sheet 7: SD -J and SD -I. Riprap in channel as shown constitutes modification to natural water course. When placing riprap in lieu of energy dissipation structure, you must show that velocities are reduced before entering natural channel. 4. Sheet 10: Manholes required at end of sewer line per TNRCC 317. 5. Sheet 10: Remove 6" stub at MH 5. 6. Sheet 11: Manhole 9 is in handicap ramp slope area. 7. Sheet 11: 12" sewer line is less than required 42" burial depth. 8. Sheet 12: Manhole 13 is in handicap ramp slope area. 9. Sheet 13: Manhole 18 does not comply with TNRCC 317. Tops of different size pipes must be aligned. 10. Sheet 14: End of sewer line does not meet TNRCC 317. 11. Sheet 14: 3 -36" culverts do not appear anywhere else in plan set. Remove. 12. Sheet 17: Inset A. Change to 6 "x8" tee and 8" valve. 13. Sheet 19. Remove "Future Reinforced Concrete Flume ". 14. Sheet S1: 2" sand cushion required on sidewalk detail. Reviewed by: Spencer Thompson Date: August 14, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 4, 2003 TO: Steve Arden, Edelweiss Gartens Venture, Via fax 846.0652 - FROM: Bridgette George, Assistant Development Manager SUBJECT: EDELWIESS GARTENS, PHASE 5 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested but had to stop review due to an incomplete submittal. The following page is a preliminary list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by an established deadline to be scheduled for a future Planning & Zoning Commission meeting: Two (2) copies of the revised final plat. If you have any questions or need additional information, please call Spencer Thompson or myself at 764.3570. Attachments: Staff review comments cc: Michael McClure, McClure Engineering Inc., Via fax 693.2554 ✓ Case file #03- 00500176 Home of Texas AB&M University STAFF REVIEW COMMENTS NO. 1 Project: EDELWIESS GARTENS, PHASE 5 (FP) - 03- 00500176 Stop Review for incomplete items. ENGINEERING 1. This phase of Edelweiss is dependent on public sewer service from the Westfield Development. However, the sewer must be in an easement. In order to obtain Final Plat approval, on off -site easement must be dedicated. 2. The Final Plat does not match the approved Preliminary Plat. An 8" waterline connection to Victoria through Phase VI is not shown on the submitted plans. Reviewed by: Spencer Thompson Date: July 31, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer installs street lighting per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2000i version of plat and /or site plan. email to rbolinAcstx.gov 6. Developer provides temporary blanket easement for construction purposes. 7. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date: 7 -30 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 a , CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 26, 2003 TO: Steve Arden, Edelweiss Gartens Venture, Via fax 846.0652 ✓ FROM: Bridgette George, Assistant Development Manager SUBJECT: EDELWEISS GARTENS PH 5 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, September 8, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, September 18, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised final plat; and, One (1) Mylar original with the appropriate signatures. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Michael McClure, McClure Engineering Inc., Via fax 693.2554 Case file #03- 00500176 Home of Texas A &M University 1 STAFF REVIEW COMMENTS NO. 2 Project: EDELWEISS GARTENS PH 5 (FP) - 03- 00500176 ENGINEERING 1. Final Plat does not conform to the Approved Preliminary Plat. The property line along the south boundary has shifted. Please refer to Preliminary Plat approved by P &Z in June of this year. 2. Show all off -site easements for this plat. 3. Change P &Z Certification to be signed by Chairman only. Remove "ATTEST ". Reviewed by: Spencer Thompson Date: August 21, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 16, 2003 TO: Steve Arden, Edelweiss Gartens Venture, Via fax 846.0652 FROM: Bridgette George, Assistant Development Manager SUBJECT: EDELWEISS GARTENS PH 5 (FP) Staff reviewed the above - mentioned engineering documents as requested and is ready to stamp the plans. Please submit the following information for the plans to be stamped approved: One (1) set of construction documents. Thank you. Attachments: Staff Review Comments Cc: Michael McClure, McClure Engineering Inc., Via fax 693.2554 Case file no. 03- 00500176 Home of Texas A&M University EDELWEISS GARTENS PH 5 (FP) (03- 00500176) ENGINEERING REVIEW COMMENTS No. 2 1. Please submit additional plan sets to be stamped. The City currently has 2 sets. The City needs one additional set for its use. Submit additional sets needed for your use. 2. The Development Permit will need to be signed by the property owner or contractor in order to pick -up stamped plans. Reviewed by: Spencer Thompson Date: September 15, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2