HomeMy WebLinkAbout03-00500179- 00076196 07/28/2003 MON 16:16 FAX 979 693 2554 McClure Engineering Inc. 444 Development Sery ?002/002
ST. THOMAS AQUINAS CHURCH
SEWER LINE EXTENSION
ENGINEER'S ESTIMATE
July 2$, 2003
Estimated
Item Description Unit Quantity Unit )'rice Total
N_ o.
Sewer System Construction
1 8" PVC, D -3034, Non -Str. Backfill L.F. 20 35.00 700.00
2 8" DIP, 18" Steel Casing, Bored L.F. 207 175.00 36,225.00
3 8" Cap EACH 1 75.00 75.00
4 Connect to existing manhole EACH 1 300.00 300.00
5 Trench Safety (sewer) L.P. 20 2.00 40.00
Sewer S em Subtotal $37 40.00
456 at IN
t * n l
659 e
_ _..
7/Zg /Q3'
Page 1 of 1