Loading...
HomeMy WebLinkAbout03-00500179- 00076194 ... •••• ., I, rapt; 1 0 Li / ) S F/ CITY OF COLLEGE STATION 6 D1) 6 3 DEVELOPMENT SERVICES IlUvieLciD 1101 Texas Avenue South, PO Box 9960 College Station, COLLEGE S[.111UN Texas 77842 VD` Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 6, 2003 TO: city y May fax 690.3378 FROM: Bette George, Assistant Development Manager SUBJECT: LORDS ACRES - LOT 2 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, August 11, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, August 21, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. only G �.z� j c �o � � 2,4" S J Two (2) copies of the revised final plat; P � .r fr " e x Parkland Dedication in the amount of $ must be submitted prior to the filing of the final plat; — zs �hrs .)////1-44. ? _ car/ w.t- [ s - One (1) Mylar original of the revised final plat; and V One (1) copy of the digital file of the final plat (I" disk or e-mail to nmanhart@ci.college-station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Carol Cotter or myself at 764 -3570. Attachments: Staff review comments cc: Terry Quick, St. Thomas Aquinas Church, Via fax 260.4502 Michael McClure, McClure Enginee•ing Inc., Via fax 693.2554 Tackett - Lodholz Architects, Via fax 71 3.521.0594 Case file #03- 00500179 Home of Texas A& M University MEMORANDUM August 12, 2003 TO: Planning and Zoning Commission FROM: Carol Cotter Email: ccotter @cstx.gov SUBJECT: FINAL PLAT for LORD'S ACRES - LOT 2 Item: Consideration, discussion, and possible action on a Final Plat for the Lord's Acres consisting of 1 lot on 17.56 acres located off State Highway 6 and North Forest Parkway. (03- 00500179) Applicant: Henry Mayo, agent for owner Staff Recommendations: Staff recommends approval of the Final Plat as submitted. Item Summary: This item is for consideration of a Final Plat of Lord's Acres, Lot 2 located off State Highway 6 and North Forest Parkway. The front half of the property is currently zoned R -1, Residential. The remaining portion of the lot is zoned A -O, Agricultural Open. This Final Plat meets zoning and subdivision requirements. Comprehensive Plan Considerations: The Land Use Plan shows this area to be Institutional; however, the current zoning of the property is R -1 Single Family Residential and A -O Agricultural Open. The property owner desires to develop the property as an expansion of St. Thomas Aquinas Church, which is a permitted use in R -1 and A -O districts. The subdivision will take access from North Forest Parkway which is designated a minor collector on the Thoroughfare Plan. The property also fronts on the northbound frontage road of State Highway 6, which the Thoroughfare Plan designates as a Freeway and Expressway. Budgetary & Financial Summary: NA Attachments: 1. Area map 2. Application A CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 6, 2003 TO: Henry Mayo, Via fax 690.3378 FROM: Bridgette George, Assistant Development Manager SUBJECT: LORDS ACRES - LOT 2 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, August 11, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, August 21, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised final plat; Parkland Dedication in the amount of $ must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college- station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Carol Cotter or myself at 764 -3570. Attachments: Staff review comments cc: Terry Quick, St. Thomas Aquinas Church, Via fax 260.4502 V Michael McClure, McClure Engineering Inc., Via fax 693.2554 ✓ Tackett - Lodholz Architects, Via fax 713.521.0594 ✓ Case file #03- 00500179 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: LORDS ACRES - LOT 2 (FP) - 03- 00500179 ENGINEERING 1. The Chairman of the Planning and Zoning Commission is no longer Richard Floyd. The new Chairman is Scott Schafer. 2. Engineering comments on construction documents will be returned under separate cover. Reviewed by: Carol Cotter Date: August 4, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2000i version of plat and /or site plan. email to rbolincstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date: 7 -30 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2