Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
11-00500077- 00076038
(*41 FINAL FLAT APPLICATION __�- _....,...._ t FOR OFF USE JY i CA3E D TE nn� T ran: T11ME., I STAFF; (Check one) ❑ Minor Amending ❑ Final J Vacating ❑ Repiat Y73C}p ti$700) ($332) ($932) ($932) Is this plat in the ETJ? Yes No Is this plat Commercial Z or Residential ❑i MINIMUM SUBMITTAL REQUIREMENTS: $700 -$932 Final Plat Application Fee (see above). ❑ $233 Waiver Request to Subdivision Regulations Fee (if applicable), $600 (minimum) Development Permit Application l Public infrastructure Review and Inspection Fee. Fee is 1 of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered, Please attach pages if additional information is provided. LxJ Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) El Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). [ Copy of original deed restriction slcovenants for replats (if applicable), Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days, The report must include applicable information such as ownership, liens, encumbrances, etc, Paid tax certificates from City of College Station, Brazos County and College Station I,S,D, The attached Final Plat checklist with ail items checked off or a brief explanation as to why they are not. NOTE. A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preappiication or Stormwater Management Conference At /A NAME OF PROJECT the Aloccllands of College Station, Lot 3R -91? u Park Trani 1R ADDRESS C: Bu Lea A -7, College Station, Brazos Coun Texas SP LOCATION OF PROPOSED PLAT; 't ist co of FM 2154 and Southwes ParisWay in Golletle S ta t ion, B County, Te �. APPLICANT /PROJECT MANAGER'S INFORMATION (P rimary contact for the project): Name Nlarls McAuliffe, Lan Agent for City! of co l lege S tation E -mail n�nxcrt cstx.c�oy Street Address l', 0. Sox 9960 / 11 Texas Avenue Ci collec Station state Texas _ Zip Code 77842 Phone Number 9791764 - Fax Number 97 91764 -3 489 f:' : Nge 1 019 PROPERTY OWNER'S INFORMATION (,411 owners must be identified, Please attach an additional sheet for multiple owners): Name Caddis Emerger, LLC - E -mail kmcgraw @caddl Street Address 4520 N. Gran River Avenu City Lansing _ State Michigan Zip Code 48906 Phone Number 517/7 -2932 Fax Number 517 1703 -2152 w Aff ftTEW - pe Et EffR`tf? > dflN; Name With All Copies To. Chuck E A t t or ne y at Law E-mail chuck a��aHls Street Address 302 Holleman Drive East cit College Station State Texas -- Zip Code 77840 Phone Number 9791696 Fax Number 979 1693-8819 Do any deed restrictions or covenants exist for this property? [ Yes ❑ No Is there a temporary blanket easement on this property? if so, please provide the Volume. N/A and Page No. _N /A Total Acreage 6.195 acres _ Total No, of Lots 2 R -O -W Acreage None Existing Use Vac Land, Access, Park lan Proposed Use NIA Number of Lots By Zoning District I I I Average Acreage Of Each Residential Lot By Zoning District: Tr I R I 0:261 3R- I R 5.934 Floodplain Acreage Lot 3R -9R - 0.1 a cre, (Possibly 1.8 acres prone to shallow flooding): Park Land Tract IR - 0.24 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? ( -, Yes ; y No 'This informao to help staff identity the appropriate standards to review the application and will be used t help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the , application be reviewed under previous ordinance as applicable? f Yes No i If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary); Project Name; The Woodlands of College Station. This is an Amending Plat of Lot 3R.1 (Vol. 9726 Pg. 13) and I City Project Number (in known): Parkland Dedication Tract 1 (Vol, 7420, Pg, 255 - 2571 I Date I Timeframe when submitted: July 2010 Pap 2 of 3 A statement a ddressing any d betwe th e Final Piat and Preliminary Plan (if applicable): Re uec_ w aiver to subdivision re q_ulati ©n and reason for sa me (If applicable): Regarding the waiver request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the ` subdivision regulations ?rill deprive the app licant of the reasonable use of his land. nl /A 2. The waiver is neces for the preservation an enjoyment of a substantial property right of the applicant. Q. tiro giaming of ine waiver win not oe oetnmental to the public health, safety, or welfare, or iniudous to other prope in the area, or to the City in adminis sub re gulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accor dance with the provisions of the Unified Development Ordinance, Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): I. i An alternative pedestrian way or multi -use path has been or will be provided outside the right -of -way: 2. The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is riot in keeping with the purposes and goals of the UDO or the City's comprehensive Plan; 3. F A capital improvement project is Imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12) months; 4, i Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate 1 rural context; 5. F When a sidewalk is required along a street where a multi -use path is shown on the Bicycle, Pedestrian, and Greenways Master Plan; 1f11 Page 3 019 6, I The 'p roposed proposecl development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO: or 7 I The proposed development contains frontage on a Freeway I Expressway as designated by lvlap 6,6, Thoroughfare Plan - Functional Classification, in the City's Comprehensive Plan. Detailed explanation of condition identified above: NIA NOTE; A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. Requested Oversize Participation Total Linear Footage of Proposed Public, Streets Sidewalks Sanitary Sewer Lines Water Lines Channels .—.—,—Storm Sewers Bike Lanes I Paths Parkland Dedication due prior to filing the Final Plat. ACREAGE: No, of acres to be dedicated + development fee No. of acres in floodplain No of acres in d etention No of acres in greenways OR FEE IN LIEU OF LAND: No. of SF Dwelling Units X (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING, The aPPficatd has prepared this application and certifies tIN)t the facts stated herein and exhibits attached hereto are true, correct, and complele. IF THIS AFPL1CA1'!4N IS FILED BY ANYONE OTHER THAN THE OVINER OF THE PROPERTY, this appfication rt)ust be a�c by it poi o f a or , y , t I, t tt 16 �, a wne it from the owner. If there is. mare than one otvner, all owners must sign the application or the power of alt0i'Voy. If the owner is a. company, the application must be accompanied by proof of outhority for the company's reprosentative to sign the application on its behalf LIEN H0LDEf-?S identifled In the title report are a/so considered Owners arid thP, appropriate signatures must be provided as descr ed all Q llf�-, 001, §IgAt6re and title Date Pq 4 o f 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued.. 2. The permit may be revoked if any false statements are made herein, 3, if revoked, all work must cease until permit Is re- issued, 4. Development shall not be used or occupied until a Certificate of Occupancy is issued, 5. The permit will expire if no significant work is progressing within 24 months of issuance, 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. if required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 3; Owner hereby gives consent to City representatives to make reasonable Inspections required to verify compliance. 9. if, stormwater mitigation is required, Including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. in accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project, Ali of the applicable codes and ordinances of the City of College Station shall apply. 11. The Information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12, Release of plans to (name or firm) is authorized for bidding purposes only. i understand that final approval and release of plans and development for construction is contingent on o0ntraOtor signs #ure an approved Development Permit. 13. i, THE WIVER, AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE D VELOP,firIENj PERMIT APPLICATION, ARE, TO THE.BEST OF MY KNOWLEDGE, TRUE, AND ACC RATE, 0000" �w Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence, 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude. compliance with TPDES: i.e., projects over 10 acres may requite a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design; Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations, 4. 1, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL 'STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE, Engineer Date fr�r