HomeMy WebLinkAboutAppllicationState TX
FOR OFFI USE NLY
CASE NO.:
DATE SUB ITT
TIME: txo
STAFF:
(Check one) ❑ Minor ❑ Amending Z Final ❑ Vacating ❑ Replat
($700) ($700) ($932) ($932) ($932)
Is this plat in the ETJ? ❑ Yes R No Is this plat Commercial ❑ or Residential 0
MINIMUM SUBMITTAL REQUIREMENTS:
0 $700 -$932 Final Plat Application Fee (see above).
$233 Waiver Request to Subdivision Regulations Fee (if applicable).
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
X❑ Application completed in full. This application form provided by the City of College Station must be used and
may not be adjusted or altered. Please attach pages if additional information is provided.
0 Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.)
0 Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
X❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
�Q Copy of original deed restrictions /covenants for replats (if applicable).
0 Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate
current within ninety (90) days. The report must include applicable information such as ownership, liens,
encumbrances, etc.
0 Paid tax certificates from City of College Station, Brazos County and College Station I.S.D.
FXJ The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not.
NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered
complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the
preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff
to be correct, the final plat application will be considered incomplete.
Date of Optional Preapplication or Stormwater Management Conference N/A
NAME OF PROJECT University Heights S ubdivision Phase 1
ADDRESS Holleman Drive South
SPECIFIED LOCATION OF PROPOSED PLAT:
North -West of intersection of Holleman Dr. and Paloma Ridge Dr.
APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Paul Schultz E -mail pschultz @regents- austin.com
Street Address 5704 Travis Green Ln.
City Austin
Phone Number 512 - 413 -8748
1/11 Page 1 of 9
Zip Code 78745
Fax Number 512 - 287 -4935
I
PROPERTY OWNER'S INFGrcMATION (All owners must be identified. I-iease attach an additional sheet for multiple
owners):
Name MJBS Holleman, LTD., a Texas limite partnership E -mail pschultz @regents- austin.com
Street Address 5704 Travis Green Ln.
City
Austin State TX Zip Code 78745
Phone Number 512 - 413 -8748
ARCHITECT OR ENGINEER'S INFORMATION:
Name Schultz Engineering, LLC - Joe Schultz
Street Address 2730 Longmire Drive, Suite A
City College Station
Phone Number ( 764 -3900
State TX Zip Code 77845
Fax Number ( 764 -3910
Do any deed restrictions or covenants exist for this property? ❑ Yes R No
Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No.
Total Acreage 18.318
Existing Use Vacant
Number of Lots By Zoning District
R -1
Total No. of Lots 82 R -O -W Acreage 4.440
Proposed Use Single Family Residential �owr.�yv+
/ 47 R -3 / 35 /
Average Acreage Of Each Residential Lot By Zoning District:
R_ 4 n -17 "2 R_ q () nQ q
Floodplain Acreage N/A
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property?
F Yes [X No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
(X Yes
I�iC
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name: UNIVERSITY HEIGHTS SUBDIVISION (PP)
City Project Number (in known): 11 - 00500064
Date / Timeframe when submitted: 03130/11
E-mail joeschultz84@verizon.net
Fax Number 512-287-4935
1/11 Page 2 of 9
Project Name: Oakland Ridge (CPA)
City Project Number (if known): 8- 500130
Date / Timeframe when Submitted: 06/06/08
Project Name: Oakland Ridge (FP)
City Project Number (if known): 8-500154
Date / Timeframe when Submitted: 07/07/08
Project Name:
City Project Number (if known): 6- 5
Date / Timeframe when Submitted: 06/19/06
Project Name: Oakland Ridge (PP)
City Project Number (if known): 6 -500178
Date / Timeframe when Submitted: 08/21/06
Project Name: Oakland Ridge (REZ)
City Project Number (if known): 8-500151
Date / Timeframe when Submitted: 07/03/08
Project Name: Oakland Ridge PH 1 (FP)
City Project Number (if known): 6 -500225
Date / Timeframe when Submitted: 10/16/06
A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable):
3ommon Area 4 was increased in size to accommodate a larger detention pond.
Requested waiver to subdivision regulations and reason for same (if applicable):
Regarding the waiver request, explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision regulations will deprive the applicant of the reasonable use of his land.
2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant.
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in
accordance with the provisions of the Unified Development Ordinance.
Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable):
1. F An alternative pedestrian way or multi -use path has been or will be provided outside the right -of -way;
2. F The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict
adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the
purposes and goals of the UDO or the City's comprehensive Plan;
3. F A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall
mean the project is funded or projected to commence within twelve (12) months;
4. I Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate /
rural context;
5. F When a sidewalk is required along a street where a multi -use path is shown on the Bicycle, Pedestrian, and
Greenways Master Plan;
1/11 Page 3 of 9
6. !— The proposed development is within an older residential subdivision meeting the criteria in Platting and
Replatting within Older Residential Subdivisions Section of the UDO; or
7. f The proposed development contains frontage on a Freeway 1 Expressway as designated by Map 6.6,
Thoroughfare Plan - Functional Classification, in the City's Comprehensive Plan.
Detailed explanation of condition Identified abo
NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the
same time by the Planning & Zoning Commission.
Requested Oversize Participation /Q C A
Total Linear Footage of
Proposed Public:
4, 575 Streets
4,00 Sidewalks
3,411 Sanitary Sewer Lines
4,500 Water Lines
490 Channels
2,473 Storm Sewers
0 Bike Lanes / Paths
Parkland Dedication due prior to filing the Final Plat
ACREAGE:
No. of acres to be dedicated + $ development fee
No. of acres in ftoodplain
No. of acres in detention
No. of acres in greenways
OR
FEE IN LIEU OF LAND:
No, of SF Dwelling Units X $ = $
(date) Approved by Parks & Recreation Advisory Board
NOTE: DIGITAL COPY OF PLAT MUST BE SUBS MED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are
true, correct, and complete. IF THIS APPLICATION 1S FILED BY ANYONE OTHER THAN THE OWNER OF THE
PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more
than one owner, all owners must sign the application or the power of attorney if the owner Is a company, the application
must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN
HOLDERS Identffled in the title report are also considered owners and the appropriate signatures must be provided as
described above.
b y U 4 c l..e.v�i CU P � Zvti c
L ZOt I
Signature and title vv _ Date
4144 FanPA nEQ
May, 16, 2011 7:42AM Spirit of Texas Bank No, 1036 P. 1
r'
LIEN HOLDER'S INFORMATION (ALL owners must be identified, Please attach an additional sheet for multiple
owners;
Name Spirit of Texas Bank, S.S.B„ a Texas state savings bank
Street Address 825 University Drive City Coilogo Station
State TX Zip Code 77840 E -Mall Address bwiiliomson @spfdtoflexasbank,COm
Phone Number 970-64 Fax Number 9ID- 846-1111
Signature and Title - Office president
Date
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1.
2.
3.
4.
5.
B.
7.
8.
9.
10.
11
12.
13.
No work of any kind may start until a permit is issued.
The permit may be revoked if any false statements are made herein.
If revoked, all work must cease until permit is re- issued.
Developmentshall not be used or.occupled.until a Certificate-of Occupancy.is issued. - -
The permit will expire if no significant work Is progressing within 24 months of issuance.
Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NO] and SWPPP.
If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
Release of plans to (name or firm) Is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HERE=IN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
¢GC,EJRATE
��4
Property Owner(s) Date
Engineer Certification:
Ii
3.
4.
The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and; BCS Unified
Design Guidelines. All development has been designed In accordance with all apgd ordinances
of the City of College Station and State and Federal Regulations. ,S°S� ' ° : -y �p
1, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS Hr A ATY��ENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST O�`,�I`�:kCNfa , j�jn.: E, AND
ACCU TE. JOSEPH, P. SCHULTZ
/ � 65889 040<1
Engineer/) f�hwr�-z 6-5 I-)-r-
Date - � �� rUN AL
f 1 z ,3 T
1111 Page 5 Ora