Loading...
HomeMy WebLinkAbout01-00500226- 00076012August 2, 2001 Mr. Bill Marden 6434 Hurta Ln. Bryan, TX 77845 Re: 589 Graham Rd. and Certified Receipt # 7099 3220 0000 5216 2714 589 #B Graham Rd. Return Receipt Requested College Station, TX 77808 Dear Mr. Marden: This letter is to notify you that the above property is in violation of City of College Station Zoning Regulations. A variance of 22 parking spaces was granted in March of 1997. The variance also allowed you t 19 9 9 y to another variance as granted extending the deadline for another compliance. In January of 199 I 9 th o f 30 months from the date of that variance reque T Th e compliance e nc thus; exp to �s in olation this year. The parking spaces have not been broug of Section 9 of the College Station Zoning Ordinance. Section 9.2 states: "In all districts, for all uses, at the time any building or structure is erected or enlarged or increased in capacity, or at any tim vehicles�'n accordancelwith�he requirements specified off - street parking spaces for motor herein. " This correspondence is to serve you notice improvements, t hin forty-five (45) business days p fr approval and to complete the require d receipt of this notification, shall constitute a violation of this section of the Zoni g n ance. citation will be issued and can result in fines of up to $2,000 dollars per day p v Each day can be a separate violation. Thank you for your cooperation in this matter. If you have any questions, or need to receive a copy of the ZBA minutes or the Zoning Ordinance and site planning requirements, please do not hesitate to give me a call at (979) Sincerely, Jessica Jimmerson Development Review Planner Cc: Code Enforcement Mr. White - Owner 589 Graham Road/Bill Marden File, ZBA Meeting 1 -19 -99 2551 Texas Ave. South, Ste. A, College Station, TX 77840 `v " Ofc: 979.693.5359 Fax: 979.693.4243 Email: mdgcs @mdgcs.com Web: www.mdgcs.com O October 5, 2001 Ted Mayo, P.E. Assistant City Engineer Development Services City of College Station 1101 Texas Avenue College Station, TX 77842 RE: B &J Autoworks — Drainage Letter MDG Job No. 000662 -3437 Dear Mr. Mayo: The purpose of this letter is to substantiate drainage design and concerns for the above referenced project with the construction of nine (9) additional parking spaces. These spaces will be constructed with pavement cross - sections, geometry and drainage patterns as illustrated on the Site Plan and its associated detail sheet. In order to comply with the City of College Station's Drainage Policies the following issues were analyzed and are addressed: Drainage Area Hydrolo y The drainage area that contains the nine additional parking spaces constitutes a portion of Lot 1, all of Lots 2 and 3 of the Graham Victoria Subdivis l e followin values B rown here obtain for e both pre and of 2.60 acres. Using the Rational Me -- ot- rt PvPlnnment conditions: , 2 3.99 0.091 5 4.99 0.11 10 5.70 0.12 25 6.55 a 0.14 50 7.46 0.16 100 7.79 0.17 i Detention Facility Based from the above hydrology data it is our determination that detention of increased runoff is not necessary since the runoff effects are negligible. Parking Lot Drainage Structu e bas from the 2.60 acre drainag onstruction of five of the is received by a 15" CMP that discharges into the storm sewer Runoff the c he new parking spaces an area grate drain system from Victoria Drive. Due a with associated conveyance pipe will be necessary to pass runoff to the existing 15" CMP. For Page 1 of 2 000662.c.02 -CD 1(3437) conservative design purposes, the area grate will be designed to pass the discharge of the entire 2.60 acre drainage basin and analyzed likewise during the 100 -year rainfall event. The results of the grate design and conveyance structures are as tabulated below F �ii� S AT rrtr eTI 25 0.05 5.38 6.69 -1.31 -2.58 100 0.05 5.38 7.96 6.69 0.92 25 ]5.00 0.10 7.61 7.61 7.96 -0.35 100 0.10 9.32 6.69 2.63 25 0.15 0.15 932 7.96 1.36 100 The grate design will require two NEENAH model R- 1878 -135G grates. These grates will have sufficient capacity to pass the 25 -year storm at approximately 0. 10 feet of head and ponding of approximately 0. 15 feet will occur at the 100 -year rainfall event. Details of the grate inlet are illustrated on the Site Plan's detail sheet. The existing and proposed 15" drainage pipe will pass the 25 -year storm by free -flow conditions, but during the 100 -year rainfall event now will enter into pressure flow conditions. The flow depth shown during the 100 -year storm reflects the pressure head at the upstream end. The proposed grate inlet box provided room for this surcharge. .�� 'OP TE Please call should you have any question. Sincerely, Rabon A. Metcalf, P. . Senior Vice President rm 000662.c.02 -CD 1(3437) c Page 2 of 2 2551 Texas Ave. South, Ste. A, College Station, TX 77840 � 4,v , Ofc: 979.693.5359 Fax: 979.693.4243 Email: mdgcs @mdgcs.com Web: www.mdgcs.com October 22, 2001 Bridgette George Assistant Development Manager 1101 Texas Avenue South College Station, TX 77842 RE: B &J Autoworks — Revised Site Plan MDG Job No. 000662 - 3437 Dear Bridgette: Per my emails with Jennifer Reeves and phone conversations with Ted Mayo the staff review comments dated October 12, 2001 are as follows: Plannin 1) See screening shrubs along both parking rows at Victoria Street (Sheet 1 of 3); 2) Additional streetscaping and canopy trees have been added along Victoria Street along the complete length of the property. Required landscaping points have be modified appropriately; Curbing has been added along the complete perimeter of the parking lot; Per my phone conversations with Ted Mayo the parking lot is in the process of being bored by CME at the four locations as shown on the Grading Plan (Sheet 2 of 3); 5) Fire lane stripping has been added on the Site Plan (Sheet 1 of 3) with special notation and the pertinent details (Sheet 3 of 3); *n 6) Victoria Street is a minor collector, therefore the driveway design meets ordinance; 7) The chain link fence that should be the storage area is shown on the Site Plan; 8) Please see irrigation notes. We are deferring the responsibility of an irrigation system to the owner and for him to obtain a licensed irrigator. Miscellaneous 1) See irrigation notes (Sheet 1 of 3); p1�2) Attached are the drainage calculations that support my drainage letter dated October 5, 2001. Please feel free to contact me should you have any questions. incerely, Rabon A. Metcalf, P. Rm Xc: Ted Mayo Page 1 of 1 000662.c.03 -CD 1(3437) Ile 3 H r Or- - � �� F- Ma, �, / r r ,' � r _ o� r r � � _ : r 19. is! g '— al AH M, Rational Method Calculations PRE - DEVELOPMENT GENERAL INFORMATION Description: B &J Autoworks Drainage Area (APRE) = 2.60 acres TIME OF CONCENTRATION RESULT GIVEN 31.1 min. Maximum Travel Distance (DPRE) 560 ft Tc(PRE) - Velocity of Runoff NPRE) = 0.30 ft /Sec Coefficient of Runoff (CPRE) = 0.45 —NOTE: Minimum T allowed = 10 min. 2 YEAR FREQUENCY RATE OF DISC HARGE (Q) Rainfall Intensity (1 = 3.385 in /hr t e = fi cl en ( Coefficient of 0.806 Coefficient (b) = 65 Coefficient (d) = 8 5 YEAR FREQUENCY RATE OF DISC HARGE (Q) Rainfall Intensity (15) 4.232 n /hr Coefficient (e) = 0.785 f Coefficient (b) = Coefficient (d) = 8.5 10 YEA FREQUENCY RATE OF DIS CHARGE (ate Rainfall Intensity (I� = (.1 1 :.::.;:.;;:. 4.830 in /hr 0 e ff Icl en t e = C ) ( 0.763 ;;;::.;::.;:;.;:.; :;.;;:.;:.::.;:.;;:.;:.;;;:.;:. :....::.::.::.;,:. : c f ;:.;::: Coefficient (b) = .......... Coefficient (d) = 8.5 25 YEA FREQUENCY RATE OF DISC HARGE (Q) Rainfall Intensity (1 = 5.554 i cient e = Co efficient ffl 0.754 ;, cf Coefficient (b) _ Coefficient (d) = 8.5 50 YEA FREQUENCY R RATE OF DISC HARGE (Q) Rainfall Intensity (150) 6.322 in /hr cl e = Coeffici ff 1 ( 0.745 Coefficient (b) = 98 Coefficient (d) = 8.5 100 YE AR FREQUENCY RATE OF DISC HARGE (Q) Rainfall Intensity (Iloo) 6,605 in /hr Coefficient (e) = 0.73 96 00. " _ 7 Coefficient (b) _ .: Coefficient (d) = 8 B -1 000662 -3437 Rational Method (Simple) Rational Method Calculations POST - DEVELOPMENT Description: -I4+ Drainage Area (A,) _ Drainage Area (A _ 2.55 acres (unchanged area) 0.05 acres (newly developed area) A,,L� s PIA-D TIME OF CONCENTRATION (T,.) GIVEN Maximum Travel Distance (D,) = 560 ft Velocity of Runoff (V = 0.30 ft /sec Coefficient of Runoff (C = 0.45 Maximum Travel Distance (D = 0 ft Velocity of Runoff (V = 1.00 ft /sec Coefficient of Runoff (C = 0.95 — NOTE: Minimum T allowed= 10 min. 2 YEAR FREQUENCY RATE OF DIS CHARGE (Q) Coefficient (e) = 0.806 Coefficient (b) = 65 Coefficient (d) = 8 5 YEAR FR EQUENCY RATE OF DISCHAR (Q Coefficient (e) = 0.785 Coefficient (b) = 76 Coefficient (d) = 8.5 10 YEA FREQUENCY RATE OF DIS CHARGE (Q) Coefficient (e) = 0.763 Coefficient (b) = 80 Coefficient (d) = 8.5 25 YEA FREQUENCY RATE OF DIS CHARGE Coefficient (e) = 0.754 Coefficient (b) = 89 Coefficient (d) = 8.5 50 YEA FREQUENCY RATE OF DISC HARGE (Q) Coefficient (e) = 0.745 Coefficient (b) = 98 Coefficient (d) = 8.5 Rainfall Intensity (1 = 4.232 in /hr QAREA 1 — 4.896 cfs QAREA 2 = 0.203 cfs QA QAREA 1 = ` > 10 Rainfall Intensity (1 = 4.830 'n /hr QAREA 1 = 5.589 cfs QAREA 2 = 0.231 cfs ¢la 5 8� L'€ Rainfall Intensity (1 = 5.554 in /hr QAREA 1 = 6.427 cfs QAREA 2 = 0.266 cfs Rainfall Intensity (1 = 6.322 in /hr QAREA 1 — 7.315 cfs QAREA 2 = 0.303 cfs 762sfs 100 YEA FREQUENCY RATE OF DI (Q 73 Rainfall Intensity (1, = 6.605 in /hr Coefficient (e) = 0. S CHARGE QA QAREA 1 = 7.643 cfs 0.316 cfs Coefficient (b) = 96 QAREA 2 Coefficient (d) = 8 000662 -3437 Rational Method (Simple) RESULT Tc1 = 31.1 min. T = 0.0 min. Tc(POSr) _ 31.1 min. Rainfall Intensity (1 = 3.385 in /hr QAREA 1 = 3.916 cfs QAREA 2 = 0.162 cfs DIG 7'7 l��z B-1 Worksheet Worksheet for Circular Channel Project Description Project File is \projects \600 \3 - autoworks \d.r \3437tl ra.fm2 Worksheet B &J AutoWorks (25 YR) Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 1.15 % Diameter 15.00 in Discharge 6.69 cfs Results Depth 0.99 ft Flow Area 1.04 ft2 Wetted Perimeter 2.74 ft Top Width 1.02 ft Critical Depth 1.04 ft Percent Full 79.04 Critical Slope 0.010448 fdft Velocity 6.43 ft/s Velocity Head 0.64 ft Specific Energy 1.63 ft Froude Number 1.12 Maximum Discharge 7.45 cfs Full Flow Capacity 6.93 cfs Full Flow Slope 0.010727 ft/ft Flow is supercritical. FlowMaster v5.07 10/04/01 Municipal Development Group Page 1 of 1 09:17:27 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Worksheet Worksheet for Pressure Pipe Project Description Project File is \projects \600 \3 - autoworks \d.r \3437t1 ra.fm2 Worksheet B &J Autoworks (100 YR) Flow Element Pressure Pipe Method Hazen - Williams Formula Solve For Pressure at 1 Input Data Pressure at 2 Elevation at 1 Elevation at 2 Length C Coefficient Diameter Discharge Results 0.00 feet H2O 0.50 ft 0.00 ft 50.00 ft 120.0 15.00 in 7.96 ft /s Pressure at 1 0.02 feet H2O Headloss 0.52 ft Energy Grade at 1 1.18 ft Energy Grade at 2 0.65 ft Hydraulic Grade at 1 0.52 ft Hydraulic Grade at 2 0.00 ft Flow Area 1.23 ftZ Wetted Perimeter 3.93 ft Velocity 6.49 fus Velocity Head 0.65 ft Friction Slope 0. ft/ft 1 FlowMaster v5.07 10/02101 Municipal Development Group Page 1 of 1 01:19:46 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 The Ci of Col � � e ge STexas `� / Embracin g the Past, Exploring the Future. P.O. Box 9960 1101 Texas Avenue • College Station, TX 77842 (979) 764 -3500 N station.tx.us May 31, 2002 Attention: Mr. Bill Marden B &J Auto Works 589 Graham Rd. College Station, TX 77845 / Re: 589 Graham Rd. and Hand Delivered `°y L- �, , • o Sn ^ � 13 oL, College Station, TX 77845 Dear Mr. Marden: This letter is to notify you that the above property is in violation of City of College Station Zoning Regulations. A variance of 22 parking spaces was granted in March of 1997. The variance also allowed you two years to bring the remaining 9 required parking spaces into compliance. In January of 1999 another variance was granted extending the deadline for another 30 months from the date of that variance request. The 30 -month extension expired on July 19, 2001 of last year. Since October 8, 2001 there have been two site plans submitted. Staff was unable to perform a complete review due to the incomplete information provided. Staff has made several phone contacts to Municipal Development Group however we still have not received a site plan submittal since October 22, 2001. The subject property still has not been brought into compliance thus; the site is in violation of Section 9 of the College Station Zoning Ordinance. Section 9.2 states: `In all districts, for all uses, at the time any bitilding or structure is erected or enlarged or increased in capacity, or at any tune any other use is established, there shall be provided off - street parking spaces for inotor vehicles in accordance with the requirements specified herein. " This correspondence is to serve you notice of the potential penalties. Failure to submit a site plan for approval and to complete the required improvements, within thirty (30) business days of receipt of this notification, shall constitute a violation of this section of the Zoning Ordinance. A citation will be issued on July 15, 2002 if you fail to comply with this notice, and can result in fines of up to $2,000 dollars per day per violation. Each day can be a separate violation. Thank you for your cooperation in this matter. if you have any questions, or need to receive a copy of the ZBA minutes or the Zoning Ordinance and site planning requirements, please do not hesitate to give me a call at (979) 764 -3570. SinL' ie ly, /ennnifer s S taff Planner Cc: Code Enforcement Home of Texas A&M University Atuoworks 4000 Victoria Ave College Station, Texas 77845 June 17, 2002 Jeenifer Reeves The City of College Station PO Box 9960 College Station Texas 77842 Re: Autoworks Site Plan Dear Miss. Reeves This is my response letter to yours hand delivered to me approxmently June 1, 2002. I was forced to put this project on hold due to severe finical fall Memohandum Oct�1 200 a did not have. an opportunity to respond to your Stop Re that time.. The site has never been expanded. The Storage is the same rea, sd fence from when I moved in 5 years ago, two years before ownership was finally I can only presume it must be when the pipe company leaves some pipe out were they unload and load everyday and have done so for the pass eight y Oct .23 2001 in a letter asking them not Hotel area. I will send a copy of this letter, your to leave pipes out of the storage area over night. I will give then ten days to respond to this letter to get things back where they belong. Please complete the Site Plain Review and tell me was sent to Mayo If you are lac agking e previously requested testing on the pavement and this anything else from their office please write back to me and I will make every effort to get whatever you need out to you. Sincerely: �j� C3'.Q -� - " Bill Marden TAMU Class of 1989 The Ci of Col ge STexas C e Embracin g the Past, Exploring the Future. P.O. Box 9960 • 1101 Texas Avenue 0 College Station, TX 77842 (979) 764 -3500 www.ci.college- station.tx.us June 21, 2002 Attention: Mr. Bill Marden B &J Auto Works 589 Graham Rd. College Station, TX 77845 Re: Notice of noncompliance at 589 Graham Road. Hand Delivered Dear Mr. Marden: This letter is in response to your correspondence dated June 17, 2002. As I stated in the previous letter delivered to you May 31, 2002 (see attached), staff has received two site plans of the subject property since October, 2001. Staff was unable to perform a technical and complete review due to the incomplete information provided. Staff returned written correspondence to that effect and has made several phone contacts to Municipal Development Group. However, to date, our comments have not been addressed and a revised site plan has not been submitted. To clarify, the following is a summary of the recent site plan activity: October 8, 2001 Rabon Metcalf with MDG submitted a site plan for staff October 12, 2001 review. Bridgette George with the City of College Station return ed to Rabon Metcalf with MDG and yourself comments that the information provided was incomplete and stating staff could not perform a complete review. October 22, 2001 Rabon Metcalf with MDG submitted a site plan for staff October 24, 2001 review. ty of College Station again B turned Rabon Metcalf with MDG and yourself comment that the information provided was incomplete and stating staff could not perform a complete review. It has been approximately eight (8) months since we returned comments from your last site plan submittal and you have failed to address our comments and submit a revised site plan. As far as the outside storage area located on your property, I have included a copy of a 1994 aerial photograph of this site (see attached). As evident in the photograph, the small storage area that existed in 1994 has been expanded greatly without the necessary site plan approval and required permits. This was referenced in our correspondence on October 12, 2001 and again on October 24, 2001. This issue was also presented and discussed at the March 4, 1997 meeting of the Zoning Board of Adjustment in which you were in attendance. Home of Texas A &M University I understand that you, as well as other business owners, may have experienced "severe financial fallout from September 11, 2001 ". However, the Zoning Board of Adjustment of the City of College Station in good faith, granted you temporary relief in March of 1997 and again in January of 1999. The extended deadline for the site 11, 2001. improvements approaching 2001, well before the tragic events that occurred on Septe the one year anniversary of your deadline to comply with the minimum standards outlined in the City's Zoning Ordinance. Unfortunately, you have failed to perform the necessary improvements that you represented to the Zoning Board of Adjustment and city staff. The subject property still has not been brought into compliance thus; the site is in violation of Section 9 of the College Station Zoning Ordinance. Section 9.2 states, "In all districts, for all uses, at the time any building or structure is erected or enlarged or increased in capacity, or at any time any other use is established, there shall be provided off - street parking spaces for motor vehicles in accordance with the requirements specified herein." This correspondence is to serve you notice of the potential penalties. Failure to submit a site plan for approval and to complete the required improvements, within thirty (30) business days of receipt of this letter, shall constitute a violation of this section of the Zoning Ordinance. A citation will be issued on July 22, 2002 if you fail to comply with this notice, and can result in fines of up to $2,000 dollars per day per violation. Each day can be a separate violation. Please note that we have extended this deadline OF A CITATION The July 22, THIS IS deadline OUR FINAL NOTICE PRIOR TO ISSUANCE WILL NOT be extended for any reason. Thank you for your cooperation in this matter. We look forward to bringing this entire issue to a close and having the required improvements completed. If you have any questions, or need to receive a copy of the ZBA minutes or the Zoning Ordinance and site planning requirements, please do not hesitate to give me a call at (979) 764 -3570. Sincerely, Jennifer Reeves Staff Planner Cc: Code Enforcement Attachments: 1994 Aerial Fly Over Previous Enforcement Letter dated May 31, 2002 Autoworkers 4000 Victoria Ave. College Station, Texas 77845 Mr. Kelly Temple" n Director of Development Services City of College Station 1101 Texas Ave. College Station, Texas 77842 RE: 589 Graham Rd. Jennifer Reeves Letter of June 21,2002 Mr. Templin I am responding to Ms. Reeves letter in an effort to clear up this miss before it proceeds down a path that will be unpleasant. I have little get treated fairly, and find the tenor of the last letter I received to be purposely insulting. Here are some facts to which I will stipulate: 1) October 8, 2001 MDG submitted the site plan for review. 2) October 12, 2001 Ms. George returned the comments of the staff; stating that the staff could not complete the review due to: Submittal being incomplete, and furthermore it was the staff's opinion that the post - annexation expansion of the storage area trigged " Full Site Pan review ". 3) October 22, 2001 MDG again submitted the site plan, this time revised per the previous comments received from the staff. Accompanying the submission was a punch list letter detailing the changes made. 4) October 24, 2001 Ms. George again returned the comments; reiterating that the review stopped because the Submittal was incomplete for the same reason stated on October 12th; the expansion of the storage area. a 7a I was unable to purN these matters any further other than the core samples requested by Ted Mayo. Reason being that in the wake of September 11th business was so bad that building fund became the survival fund. As I stated in my letter to Ms. Reeves I am not the only business to feel the effect of that tragic event and I no longer had the financial resources to further pursue this issue. M Autoworkers 4000 Victoria Ave. College Station, Texas 77845 The Staff has erred in their refusal to completely review the plans and here is why: The ZBA on March 4, 1997 was fully informed that the storage area in question had been expanded after the annexation in violation of the ordinance. I did not perform the expansion, the previous owners: Lynn and David White did. I have not expanded the storage area since that time. spaces and I was granted a variance which required me only to provide 9 parking ZBA minutes parking lot. ( the appropriate land�capmg and screening arch 4, 1997). The plans submitted do just that but I have not been able to get a s complete review. I have also been told I must provide buffers and screening fences in accord with Section 8.10 of the Zoning Ordinance, whicywas adopted on May 10, 2001, long after I was granted my variance and extension. In other words I have not been able to get my reviews and approvals because I do not comply with an ordinance that was passed four years r y Was granted and two years after my extension was gran January 19, 999 ma orw+ Mr. Templin; want to finish this project in a responsible mauer and ask you to allow for review of the site plans submitted in I have little confidence in the granted. Please contact me in this matter direct, as staff. Sincerely Bill Marden cc: Stephen Hollas Atuoworks 4000 Victoria Ave College Station, Texas 77845 June 17, 2002 Jeenifer Reeves The City of College Station PO Box 9960 College Station Texas 77842 Re: Autoworks Site Plan Dear Miss. Reeves This is my response letter to yours hand delivered to me approxmently June 1, 2002. I was forced to put this project on hold due to severe finical fallout from the September 11, 2001 and did not have an opportunity to respond to your Stop Review Memorandum of Oct. 23, 2001 at that time.. The site has never been expanded. The Storage is the same area, same fence from when I moved in 5 years ago, two years before ownership was finally transferred to me. I can only presume it must be when the pipe company leaves some pipe out were they unload and load everyday and have done so for the pass eight years since they moved from the Ponderosa Hotel area. I will send a copy of this letter, your Oct. 23,2001 letter in a letter asking them not to leave pipes out of the storage area over night. I will give then ten days to respond to this letter to get things back where they belong. Please complete the Site Plain Review and tell me what else needs to be done. MDG did get the previously requested testing on the pavement and this was sent to Mr. Mayo. If you are lacking anything else from their office please write back to me and I will make every effort to get whatever you need out to you. Sincerely: �^ Bill Marden TAMU Class of 1989 " � � The City of `� Colleg a stat Texas \ / Embracin g the Past, Exploring the Future. P.O. Box 9960 1101 Texas Avenue 0 College Station, TX 77842 (979) 764 -3500 ww w.ci.college-station.tx.us 18 July 2002 Mr. Bill Marden 589 Graham Road College Station, TX 77845 RE: 589 Graham Road Dear Mr. Marden: I am in receipt of your undated certified letter regarding Ms. Reeves letter of 21 June. You make it clear that you Bread Mst Reeves letter and find t only to s be u a y [sic] insulting." I have read and restatement of the facts in this case. The first point in your letter that piqued my curiosity is statement that the events of 11 September 2001 financially prevented you from complying with your variance granted in 1997 and extended in 1999 until 19 July 2001. I trust you are aware that the tragedies of last September r�. edate your required compliance by almost two months. Therefore you are stating that you were not in compliance at the end of the extension of the period granted by the Zoning Board of Adjustment (ZBA), originally granted in March of 1997. That amounts to 64 months you have had to comply with the terms of the variance. My staff and I are charged with the enforcement of the City's codes and the determinations of Boards and Commissions such and the ZBA. I am afraid that your inability to comply with the us no the variance recourse but toaefer the matter generous period (64 months) adjudication. rely, Kelly E. lin, AICP Director of Development Services Enclosure cc: Jennifer Reeves, Staff Planner Jon Mies, Code Enforcement Home of Texas A &M University From: Kelly Templin To: Greg @mdgcs.com Date: 7/23/02 3:30PM Subject: BJ Autoworks Greg: I have justpent the past hour with Jennifer Reeves and Natalie Ruiz reviewing this matter The matter of the storage yard is complicated; however, even if we forgo that issue, the plans still do not reflect the entirety of the comments that were sent out after the last two review. This entire case is further complicated by your client inaction despite a variance with a liberal term for compliance AND a twenty -four month extension which was again, not complied with. Staff cannot reward your client's failure to comply by allow him permission to implement 1997 standards after he flagrantly defied the original terms and the extension. At this point he must implement the current standards. Concerning the storage area in particular, staff s perspective is that the use of the yard outside of the fence can be considered an expansion in excess of 25% which could trigger full compliance for the entire site. The yard outside of the fence is often full of pipe, concrete manholes, other such materials. The fact that this portion of the site is utilized by a use not associated with the auto business compounds the problem, but does not alleviate the Mr. Marden's obligations to comply. The pipe and other materials must be placed behind the fence immediately Any future use of the yard outside of the fence will be deemed an expansion and required full compliance for the site. So, as it stands, we are still in need of a plan which addresses all of the last two rounds of comments, minus the storage area (assuming the material storage is confined within the fence entirely and that this is complied with immediately and hereafter). I enjoyed our discussion yesterday. I look forward to seeing you at the Reliant Center on the 18th -Kelly Templin CC: Jennifer Reeves; Natalie Ruiz August 2, 2001 Mr. & Mrs. David White 5605 Polo Rd. College Station, TX 77845 Re: 589 Graham Rd. and Certified Receipt # 7099 3400 0017 6090 1743 589 #B Graham Rd. Return Receipt Requested College Station, TX 77845 Dear Mr. Marden: This letter is to notify you that the above property is in violation of City of College Station Zoning Regulations. A variance of 22 parking spaces was granted in March of 1997. The variance also allowed you two years to bring the remaining 9 required parking spaces into compliance. In January of 1999 another variance was granted extending the deadline for another 30 months from the date of that variance request. The 30 -month extension expired on July 19`" of this year. The parking spaces have not been brought into compliance thus; the site is in violation of Section 9 of the College Station Zoning Ordinance. Section 9.2 states: "In all districts, for all uses, at the time any building or structure is erected or enlarged or increased in capacity, or at any time any other use is established, there shall be provided off - street parking spaces for motor vehicles in accordance with the requirements specified herein. " This correspondence is to serve you notice of the potential penalties. Failure to submit a site plan for approval and to complete the required improvements, within forty-five (45) business days of receipt of this notification, shall constitute a violation of this section of the Zoning Ordinance. A citation will be issued and can result in fines of up to $2,000 dollars per day per violation. Each day can be a separate violation. Thank you for your cooperation in this matter. If you have any questions, or need to receive a copy of the ZBA minutes or the Zoning Ordinance and site planning requirements, please do not hesitate to give me a call at (979) 764 -3570. Sincerely, Jessica Jimmerson Development Review Planner Cc: Code Enforcement Mr. Marden 589 Graham Road/Bill Marden File, ZBA Meeting 1 -19 -99 Municipal Development Group 2551 Texas Avenue, South Suite A College Station, TX 777840 February 20, 2003 City of College Station Development Services 1101 Texas Avenue South P.O. Box 9960 College Station, TX 77842 ATTN: Bridgette George Dear Ms. George; Please find attached one (1) set of prints for the BJ Autoworks project, your Case file #01- 00500226, for review. Our conversation today included my concern that this set of plans will meet the zoning requirements as I have been discussing them with Ms. Jennifer Reeves. In the event time allows a brief review prior to 9 a.m. Monday, February 24 and an oversight on my part is found, please advise me via phone at 693 -5359 immediately so that I might repair the plans and have them submitted by the 10 a.m. deadline. Thank you for your help. Sin rely, Teresa Knight Attachment: 1 set of 3 prints, BJ Autoworks 0;L v. C 2c0 0,EZ 3 S�nN O o?S c °zS � N c g' L $ *F- S m� C ca •— w 01 = _�� c W V dS o- W a �� Oa c c ri t0 � v O L Ui a. s a`, _� � a ri O n IL J J Z 0 J J W V F- V N U W O M . .� . N O, i- z se P4 .4 Ln V 9 X -ch 17, 2003 Igette George Development Services P.O. Box 9960 College Station, TX 77840 Re: Waterwood Condos Dear Bridgette, Attached are ten revised site plans for Waterwood Condominiums. We submitted a preliminary site plan in November of last year and this submittal responds to those documents. Also included are three landscape and irrigation plans, one drainage report, and two sets of construction documents. The site plan, development permit, and infrastructure inspection fees in the amount of $1200.00 have previously been submitted for this project. If you have any questions please give us a call. Veronica J.B. Managing Pai Cc: Jim Stewart File (* // " r4 I CITY OF COPg Seraicu 1101 Texas Avenue South, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.357 / Fax 979.764.349 August 25, 2009 Mr. Bill Marden 612 Brussels Dr College Station, TX 77845 Re: 589 Graham Rd College Station, TX 77845 Dear Mr. Marden, This letter is to notify you that the above property is in violation of the City of College Station's Unified Development Ordinance. Development has occurred on the property without acquiring a development permit and site plan approval. As required by the City's Unified Development Ordinance Section 3.5 Site Plan Review: 1. Prior to se residential al development a sit r plan shall be approved by the p or City in townhouse reside accordance with this Section. 2. No development described in paragraph 1 above shall be lawful or permitted to proceed without final site plan approval. This correspondence is to serve you notice of the potential penalties. Please contact staff to discuss the items that will need to be submitted for approval and the required improvements that will need to be made on the property. Failure to contact staff within ten (10) business days of receipt of this notification shall constitute a violation of this section of the Unified Development Ordinance. A citation will be issued and can result in fines up to $2,000 dollars per day per violation. Each day can be a separate violation. Thank you for your cooperation in this matter. If you have any questions, or need to receive a copy of the site planning requirements, please do not hesitate to give me a call at (979) 764- 3570. Sincerely, Matt Robinson Planner Cc: Code Enforcement Home of Texas A &M University