February 12, 2003
Brett McCully, P.E.
Assistant City Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: R.M. Dudley Construction — Existing Wastewater Pressure Test
Water Line Improvements - Block One, Lot 42, Harvey Hillside
RME No. 121 -0147
Dear Brett:
In accordance with TCEQ Chapter 290.44(e) — "Location of Water Lines ", the existing 15" VCT
and 6" PVC sanitary sewer that parallels this project's proposed water line was determined not to
shown signs or evidence of leakage by means of a low pressure air test. This pressure test was
performed in accordance with Chapter 317.2(a)(3)(B) — "Low Pressure Air Test" and witnessed
by me. This pressure test was performed on February 5 and 7 for the 6" PVC and 15" VCT
sanitary sewer lines respectively. The reported findings are as follows when a stabilized air
pressure of 5.0 psi was applied to each segment of line. Each segment of sanitary sewer line
exhibited no measurable loss in air pressure. Stationing for each segment of sanitary sewer is
based from the alignment of the proposed 8" PVC water line.
Line Segment Location Length/Min Time Tested Time
15" VCT SS Line Sta. 0 +00 — Sta. 2 +90 294'/1570 sec (26 min) 26 min
6" PVC SS Line Sta. 2 +90 — Sta. 4+01 90'/398 sec (6.6 min) 10 min
6" PVC SS Line Sta. 4 +01 — Sta. 6 +44 244'/398 sec (6.6 min) 10 min
6" PVC SS Line Sta. 6 +44 — Sta. 8 +65 220'/398 sec (6.6 min) 10 min
Please call should you have any questions or require assistance.
Sincerely,
■ ,d i
Ill
-----)
Rabon A. Metcalf, P.E.
CD1-121-0147-L02 Page - 1
ENGINEER'S COST ESTIMATE
WATER LINE IMPROVEMENTS
HARVEY HILLSIDE
BLOCK ONE, LOT 42
COLLEGE STATION, BRAZOS COUNTY, TEXAS
UNIT TOTAL
NO. I DESCRIPTION I QUANTITY I UNIT I COST ( COST
1 Mobilization, Traffic Control, & Trench Safety 1 LS $1,584.25 $1,584.25
2 8" PVC (C900 - DR 14 - Class 200) Water Line 353 LF $17.75 $6,265.75
w/Type "B" Backfill
3 6" PVC (C900 - DR 14 - Class 200) Water Line 384 LF $15.00 $5,760.00
w/Type "B" Backfill
4 8" (MJ) Gate Valve & Box 2 EA $700.00 $1,400.00
5 6" (MJ) Gate Valve & Box 5 EA $525.00 $2,625.00
6 Ductile Iron Fittings (Class 350) 1 LS $3,000.00 $3,000.00
7 Standard Fire Hydrant (Type 1 & 2) & 2 EA $2,150.00 $4,300.00
Appurtenances
8 15" Steel Encasement (Sch 40) w /8" DIP (Class 52) 40 LF $85.00 $3,400.00
Carrier Pipe w /Locking Joints & Casing Spacers
9 12" Steel Encasement (Sch 40) w /6" DIP (Class 52) 20 LF $70.00 $1,400.00
Carrier Pipe w /Locking Joints & Casing Spacers
Creek Crossing (8" DIP Carrier Pipe, Erosion
10 Control Measures, Concrete Structure, Fittings, 20 LF $50.00 $1,000.00
Extra Compaction Effort)
11 Water Services 2 EA $375.00 $750.00
12 Silt Fencing 100 LF $5.00 $500.00
13 Asphalt Patch w /Cement Stabilized Sand Backfill 84 LF $40.00 $3,360.00
SUB -TOTAL = $35,345.00
This Engineer's Cost Estimate was prepared in this office, Q a, ° y,
at the date shown, ub c of a tru ture aid is released
ost projections. for the purpose of :•PTE O Ttr!
•
R a ........ ..1410
Rabon A. Metcalf, P.E Date
411 • •••
:l 88
f' RABON METCALF ENGINEERING = F� •
POST OFFICE BOX 9253 k� ° • • •`' ,
\ COLLEGE STATION, TEXAS 77842 "
CELL (979)219 -4174
E A ' r NF E R 1 G FAX: (979) 690 -0329
E- MAIL: RMIENGINEER@JUNO.COM
CD1- 121 -0147 -E03 1 of 1
ENGINEER'S COST ESTIMATE
WATER LINE IMPROVEMENTS
HARVEY HILLSIDE
BLOCK ONE, LOT 42
COLLEGE STATION, BRAZOS COUNTY, TEXAS
UNIT TOTAL
NO. I DESCRIPTION I QUANTITY I UNIT I COST I COST
1 Mobilization, Traffic Control, & Trench Safety 1 LS $1,584.25 $1,584.25
2 8" PVC (C900 - DR 14 - Class 200) Water Line 353 LF $17.75 $6,265.75
w/Type "B" Backfill
3 6" PVC (C900 - DR 14 - Class 200) Water Line 384 LF $15.00 $5,760.00
w/Type "B" Backfill
4 8" (MJ) Gate Valve & Box 2 EA $700.00 $1,400.00
5 6" (MJ) Gate Valve & Box 5 EA $525.00 $2,625.00
6 Ductile Iron Fittings (Class 350) 1 LS $3,000.00 $3,000.00
7 Standard Fire Hydrant (Type 1 & 2) & 2 EA $2,150.00 $4,300.00
Appurtenances
8 15" Steel Encasement (Sch 40) w /8" DIP (Class 52) 40 LF $85.00 $3,400.00
Carrier Pipe w /Locking Joints & Casing Spacers
9 12" Steel Encasement (Sch 40) w /6" DIP (Class 52) 20 LF $70.00 $1,400.00
Carrier Pipe w /Locking Joints & Casing Spacers
Creek Crossing (8" DIP Carrier Pipe, Erosion
10 Control Measures, Concrete Structure, Fittings, 20 LF $50.00 $1,000.00
Extra Compaction Effort)
11 Water Services 2 EA $375.00 $750.00
12 Silt Fencing 100 LF $5.00 $500.00
13 Asphalt Patch w /Cement Stabilized Sand Backfill 84 LF $40.00 $3,360.00
SUB -TOTAL = $35,345.00
This Engineer's Cost Estimate was prepared in this office,
at the date shown, an is released for the purpose of , `+A
!M. C 1- `
N�
ure e projections. , � �.� �.; .. • F «. ®� � r s
—� * C / fit's
Rabon A. Metcalf, P.E ate RABOs
f f 1T--,, RABON METCALF ENGINEERING J I � , g am : o � "� g , if
/ t -- POST OFFICE BOX 9253
4 ' 1 A ' i _ COT,T,FGE STATION, TEXAS 77842 T �� °
l• Li -- CELL: (979) 219-4174
N
ENL INF E 1 G FAX: (979) 690-0329
E - MAIL: RMENGINffit@JTINO.COM
CD1- 121 -0147 -E03 1 of 1
�' \\ RABPosT o BOX 9253 ENGINEEIiING
19791 690 -0329 - HOME
COLLEGE STATION. TEXAS 77842 19791 620 -0374 - FAX
19791219 -4174 - C'FI.i
z i EMAIL BMFNGINEERLJUNO.COM
January 15, 2003
Brett McCully, P.E.
Assistant City Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: R.M. Dudley Construction — Water Line Improvements — Hydraulic Analysis
Block One, Lot 42, Harvey Hillside
RME No. 121 -0147
Dear Brett:
Please find attached the following findings and calculations for the above referenced project's
water line improvements. This hydraulic analysis and the supporting design methods were
performed in accordance with the City of College Station's development standards and
specifications.
Information used for the design and the resulting calculations, for the water line improvements,
are as follows:
❖ A -1: COCS Public Utilities — Flow Test Report
❖ A -2: Hazen- Williams Evaluation
Hydraulic Analysis
The 5.36 -acre tract, currently platted as Lot 42, Block One of Harvey Hillside subdivision, is
anticipated to be platted into two lots. The southern lot will be reserved for a single family
residential residence. The northern lot, fronting State Highway No. 30, is anticipated to develop
as a commercial /office building. The current conceptual Site Plan, provided by R.M. Dudley,
proposes a two -story office building with a gross floor space of 22,000 ft The water line's
domestic and fire flow demands will be based from this proposed data.
Domestic Demand:
Residential Development — 2,500 ft — Peak Demand = 15 gpm
Commercial /Office Development — 22,000 ft — Appox. Peak Demand = 90 gpm
Filename: CDI- 121 -0I47-L01 Page - 1
Fire Flow Demand:
For residential development a fire flow demand of 500 gpm will be set as the requirement for the
supplying fire hydrant. The Insurance Service Office provides a bases for the calculation of fire
flows for commercial developments. This information is contained in the SPFC, Chapter 13 and
is as follows:
Fire Flow (Q) = 18C(A)
C = Coefficient related to the type of construction —1. for ordinary construction
A = Total floor area — 22,000 f
Therefore, the required fire flow is:
Q = 18 *1.0 *(22,000) = 2,670 gpm (round up or down by increments of 250) = 2,750 gpm
❖ ISO allows for a 50% reduction for buildings with automatic sprinkler systems;
Q = 2,750 *0.50 = 1,375 gpm
❖ ISO requires an exposure protection value added to the fire flow;
North Side >150 ft 0% increase
South Side >150 fl 0% increase
West Side 11 -30 ft 20% increase
East Side 101 -150 ft 5% increase Total Increase = 25%
Q = 1,375 + 1,375 *0.25 = 1,718 gpm (round up or down by increments of 250) = 1,750 gpm
As calculated, the required fire flow for the commercial/office development will be 1,750
gpm.
Design Results:
Using the calculated domestic and fire flow conditions and existing water pressures in the area,
the water line was appropriately sized. A summary of results for each condition is shown below
in Table #1. The results illustrate the residual pressure when the coefficient of friction is equal to
100, therefore using the more conservative figures.
❖ Domestic Supply — This condition illustrates the hydraulic conditions of the water system
improvements with both proposed developments at peak demand;
❖ Condition #1 — This analysis illustrates the results of fire flow conditions for the proposed
commercial development. The fire service to commercial development will be shared by
a proposed fire hydrant located in the middle of the commercial tract and the existing fire
hydrant in the southeast corner of the intersection of S.H. 30 and Pamela Lane;
❖ Condition #2 — This scenario reports the fire flow demands and hydraulic results for the
fire service to the residential development. The required fire flow is delivered completely
at the proposed fire hydrant located and the end of the improvements.
Filename: CD1- 121 -0147 -L01 Page - 2
TABLE #1 - WATER LINE DESIGN SUMMARY
8" Line Segment 6" Line Segment
Demand Velocity Pressure Demand Velocity Pressure
Scenerio (gpm) (fps) (psi) (gpm) (fps) (psi)
Domestic Flow 105 0.67 101.66 15 0.17 95.15
Fire Flow Condition #1 890 5.69 62.80 15 0.17 56.29
Fire Flow Condition #2 590 3.77 64.89 50 5.68 52.09
The attached engineering calculations are issued for the before stated water line improvements
and are issued by me and are applicable to this project. Please call should you have any
questions or require assistance.
Sincerely,
1
Rabon A. Metcalf, P.E. \
Ow --I— • •
N j . . '1:1 .
.41 0 51:11 t 7 5'
dz1/4, .0 . /.40--.. -
Filename: CD1- 121 -0147 -L01 Page - 3
r►1 • 1O uu3 14:07 Fit .979 764 34SX '`OLL€GE .STATION au/ Water is Life
Paver s
S el Pr
Eallege tatiorr
p0101 weak C .4 erc
PUBLIC UTLLITIES DEPARTMENT
1601 GRAHAM ROAD
COr.r.:GE STATION TEXAS 77845
Date: 10 JAN 03
Number pages including cover sheet - 1
Fax ro: 690 -0329
Attention: RAYBURN METCALF
Company:
From. Butch Willis Water Wastewatcl Division
Phone: 979-764 -3435 Fax: 979 - 764 -3452
FLO W TEST REPORT
Location: KOPPIE BRIDGE
Flow hydrant number: G-013
Pitot reading: 75
(GPM): /140
Static hydrant number: G -035
Static PSI: 100
Residual PSI: 65
HARVEY HILLISIDE
WATER LINE IMPROVEMENTS
Hazen - Williams
DOMESTIC SUPPLY
HEAD FRICTION STATIC RESIDUAL 1
FLOW FLOW DIST. ID C LOSS LOSS VELOCITY HEAD TDH PRESSURE i
•.m cfs ft in VALUE ft/100 ft f•s ft ft asi I
105.0 0.23 375 8 140 0.02 0.09 0.67 -4.00 -3.91 101.6
15.0 0.03 430 6 140 0.00 0.01 0.17 11.00 11.01 95.19
105.0 0.23 375 8 100 0.05 0.17 0.67 -4.00 -3.83 101.66
, 15.0 0.03 430 6 100 0.01 0.02 0.17 11.00 11.02 95.15
Static Pressure (psi) = 100.00
FIRE FLOW SUPPLY - CONDITION #1
(1,750 GPM @ OFFICE BUILDING)
HEAD FRICTION STATIC RESIDUAL
FLOW FLOW DIST. ID C LOSS LOSS VELOCITY HEAD TDH PRESSURE
(gpm) (cfs) (ft) (in) VALUE (ft/100) (ft) (fps) (ft) (ft) (psi)
890.0 1.98 375 8 140 1.30 4.87 5.69 -4.00 0.87 64.62
15.0 0.03 430 6 140 0.00 0.01 0.17 11.00 11.01 58.11
890.0 1.98 375 8 100 2.42 9.08 5.69 -4.00 5.08 62.80
15.0 0.03 430 6 100 0.01 0.02 0.17 11.00 11,02 56.2
Residual Pressure (psi) = 65.00
FIRE FLOW SUPPLY - CONDITION #2
(500 GPM @ RESIDENTIAL)
HEAD FRICTION STATIC RESIDUAL
FLOW FLOW DIST. ID C LOSS LOSS VELOCITY HEAD TDH PRESSURE
(gem) (cfs) (ft) (in) VALUE (ft/100) (ft) (fps) (ft) (ft) (psi)
590.0 1.31 375 8 140 0.61 2.28 3.77 -4.00 -1.72 65.75
500.0 1.11 430 6 140 1.82 7.81 5,68 11.00 18.81 55.86
590.0 1.31 375 8 100 1.13 4.24 3.77 -4.00 0.24 64.89'
500.0 1.11 430 6 100 3.38 14.55 5.68 11.00 25.55 52.09
Residual Pressure (psi) = 65.00
121 -0147 Hydraulic Anaylsis
ENGINEER'S COST ESTIMATE
WATER LINE IMPROVEMENTS
HARVEY HILLSIDE
BLOCK ONE, LOT 42
COLLEGE STATION, BRAZOS COUNTY, TEXAS
UNIT TOTAL
NO. I DESCRIPTION I QUANTITY I UNIT I COST I COST
1 Mobilization, Traffic Control, & Trench Safety 1 LS $1,584.25 $1,584.25
2 8" PVC (C900 - DR 14 - Class 200) Water Line 373 LF $17.75 $6,620.75
w/Type "B" Backfill
3 6" PVC (C900 - DR 14 - Class 200) Water Line 384 LF $15.00 $5,760.00
w/Type "B" Backfill
4 8" (MJ) Gate Valve & Box 2 EA $700.00 $1,400.00
5 6" (MJ) Gate Valve & Box 5 EA $525.00 $2,625.00
6 Ductile Iron Fittings (Class 350) 1 LS $3,000.00 $3,000.00
7 Standard Fire Hydrant (Type 1 & 2) & 2 EA $2,150.00 $4,300.00
Appurtenances
8 15" Steel Encasement (Sch 40) w /8" DIP (Class 52) 20 LF $85.00 $1,700.00
Carrier Pipe w /Locking Joints & Casing Spacers
9 12" Steel Encasement (Sch 40) w /6" DIP (Class 52) 20 LF $70.00 $1,400.00
Carrier Pipe w /Locking Joints & Casing Spacers
Creek Crossing (8" DIP Carrier Pipe, Erosion
10 Control Measures, Concrete Structure, Fittings, 20 LF $50.00 $1,000.00
Extra Compaction Effort)
11 Water Services 2 EA $375.00 $750.00
12 Silt Fencing 100 LF $5.00 $500.00
13 Asphalt Patch w /Cement Stabilized Sand Backfill 84 LF $40.00 $3,360.00
SUB -TOTAL = $34,000.00
This Engineer's Cost Est ate was prepared in this office,
\ at the date shown, and . released for the purpose of OF " �
P�. W �'
li Anar • - w ure c • - projections. � ,'� .• • . '
2 0 �
Ra••n A. Metcalf, P.E \ Date' ' '' 1 1�+��
v 1 (` RABON METCALF' ENGINEERING : I' _ ,
® POST OFFICE BOX 9253 ` 1 FS al L E4, a
1
1 COT,T,FGE STATION. TEXAS 77842 ��°
Jr
q �_ ' � : , L CELL (979) 219 -4174
4,,-, N O NF ER
rT crb FAX: (979) 690 -0329
E- MAIL: ' MENGINEER @JITNO.COM
CD1- 121 -0147 -E02 1 of 1
ENGINEER'S COST ESTIMATE
WATER LINE IMPROVEMENTS
HARVEY HILLSIDE
BLOCK ONE, LOT 42
COLLEGE STATION, BRAZOS COUNTY, TEXAS
NO. 1 1 DESCRIPTION QUANTITY UNIT COST TOTAL
t OST
,
1 Mobilization, Traffic Control, & Trench Safety 1 LS $985.00 $985.00
2 8" PVC (C900 - DR 14 - Class 200) Water Line 780 LF $17.75 $13,845.00
w/Type "B" Backfitl
3 8" (MJ) Gate Valve & Box 2 EA $740.00 $1,400.00
4 6" (MJ) Gate Valve & Box 4 EA $525.00 $2,100.00
5 Ductile Iron Fittings (Class 350) 1 LS $1,800.00 $1,800.00 ,
6 Standard Fire Hydrant (Type 1 & 2) & 2 150 $4,300.00
Appurtenances
7 15" Steel Encasement (Sch 40) w18" DIP (Class 52) 10 LF $85.00 $850.00
Carrier Pipe w1Loc king Joints & Casing Spacers
Creek Crossing (8" DIP Carrier Pipe, Erosion Control
8 Measures, Concrete Structure, Fittings, Extra 1 EA $1,750.00 $1,750.00
Compaction Effort)
9 Silt Fencing 114 LF $5.00 $570.00
10 Cement Stabilized Sand Backfill 20 LF $25.00 $500.00
SUB -TOTAL = $28,100.00
This Engineer's Cost Estimate was prepared in this office,
-t the date shown, and 1 _ released for the purpose of
pu • is infras • re co projections.
MIS A
Rabon A. Metcalf, P.E „ a te t . \ ° ° � +
4 ' � �t (� `�.._ RABON METCALF ENGINEERING RABON A. MtETCA F �.
/ '\ POST OFFICE BOX 9253 1
COI I FGE STATION. TEXAS AS 77842 ) F "��' ° • , _; .�'�
�S / ONA ,
�U , v : ti CFI I; 19793 239 -4174 \ X
g � 14
�-� G t NE ER 11'16 FAX: !9?93 690-0329
E-MAIL: RIvfENGINEERi NO.CON4
CD1- 121 -0147 -E01 1 of 1