Loading...
HomeMy WebLinkAbout10-00500266- 00075569i December 15, 2010 Ericka Bridges, E.I.T. Graduate Civil Engineer City of College Station Planning & Development Services 1101 Texas Avenue South College, Station, 77840 RE: Creek Meadows, Section 1C, Phase 1B — College Station, TX Fire Flow Letter RME No. 202 -0417 Ericka Bridges: -b ll �UO There is sufficient capacity in the existing water distribution system to support the above referenced development for fire flow protection. The existing and proposed improvements and projected demands, for both water and sanitary sewer, are summarized below and are in accordance with the B /CS Unified Design Guidelines Manual (UDGM): WATER SYSTEM IMPROVEMENTS: ❖ The subject property has accessibility to existing public water for both domestic and fire use at the following locations: o Existing 16" PVC public water line located in an existing 16' PUE, along the right -of -way line of Greens Prairie Road West; o The existing 16" PVC public water line will accommodate fire flows from two (2) existing fire hydrants which are located as follows: ■ FH 1 — SE Corner of A &M Super Storage facility approximately 230 feet west of the subject property; • FH 2 — Common south property corner of Lot 1 and Lot 2 of Creek Meadows, Section 1C, Phase One; Flow tests were obtained from the Wellborn S.UD. from two existing fire hydrants installed along the 16" PVC water line. These flow test were conducted on February 15, 2008, by Wellborn S.U.D. under the direction of Mr. Steven Cast and witnessed by this office. Since this time no changes to the distribution system, in the immediate influential area, have been made. The flow data is summarized below in Table #1 — Flow Test Data. 7607 Eastmark Drive, Ste. 250 -F <77840> P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 764 -0704 email: civil @rmengineer.com CD1- 202 - 0417- L03.docx Page 1 of 2 FLOW TEST DATA Flow Pilot Static Residual Hydrant Reading Flow Pressure Pressure No. Location ( ( m) ( (psi FH 1 SE Cor of A &M Super 55 1250 FH 2 Creek Meadows Office 53 1250 Static FH SW Cor of A &M Super 66 65 7607 Eastmark Drive, Ste. 250 -F <77840> P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 764 -0704 email: civil @rmengineer.com CD1- 202 - 0417- L03.docx Page 1 of 2 t J6!1 Creek Meadows, Section 1C, Ph 1B - College Station, TX Fire Flow Letter December 15, 2010 r � Note: The reported flow is from the 2.5" nozzle of the identified flow hydrant; ❖ Fire Flow requirements and results: • Commercial fire hydrants will be analyzed to provide a fire flow of 2,500 gpm. This flow may be split between two hydrant so long as they are within 600' of one another. This condition is meet for the proposed Lot 3 & 4 of Creek Meadows, Section 1C, Phase 1B; • During fire flow conditions, the proposed system and adjacent infrastructure must provide the required fire flow with a minimum residual pressure of 20 psi. This condition is meet per Table #1 above. The residual pressure was measured 65 psi; • At all analyzed conditions, no water line shall have a velocity greater than 12 fps in both existing and proposed mains. This condition is meet with a calculated velocity of 3.99 fps in the existing 16" water line with a fire flow of 2,500 gpm; Please call should you have any questions or require assistance. Sincerely, Rabon A. Metcalf, P.E. No. 88583 Texas Firm Registration No. F -4695 rabon Ctirinengineer.coni CD 1- 202 - 0417- L03.docx Page 2 of 2