Loading...
HomeMy WebLinkAbout10-00500208- 00075541RESPONSE TO STAFF COMMENTS - 11/09/10 Case File # 10-00500208 TOWER POINT SUBDIVISION PHASE 8A - FINAL PLAT 11/11/10 - submitted revisions PLANNING: 1) New tax certificates are being submitted. 2) The title report will be revised to include a metes and bounds description on each of the two lots - the 0.94 ac. tr. and the 1.17 ac. tr. 3) Acknowledged and completed. 4) The 15' PUE has been modified on the final plat to be consistent with the preliminary plat. 5) The bearings shown on the plat are correct and the bearings in the metes and bounds have been revised. 6) Acknowledged. Plat Note #7 has been revised to reflect this plat is a part of Building Plot D. X55Ctl~t /S~ i Dcy C) Z . EN INEERING: Acknowledged. Plat Note #9 has been removed. 2)~ Acknowledged. The PUE's have been revised so as to s~pport the utilities along Drive G. 4-k I~5 ufi ru Acknowledged. A 9'x 11 3' PUE has been added dr 'to Sh I I . a storm sewer junction box. -X 5k-~ 14 V I 0~ \N,) C~V) 1?