HomeMy WebLinkAbout02-00500273- 00075420 OVERSIZE PARTICIPATION REQUEST CITY Of COLLEGE STATION € 11 _7 111P Development Services Project Name: Southside Plaza Subdivision: Harley Subdivision, Block 1, Lot 2 Developer: Ron Smith Engineer: Rabon Metcalf Project Description: 18' DIP water line extension from Harley Davidson property through Southside Plaza (northern adjacent property), along SH 6 north bound frontage road. Total Construction Cost Estimate: $46,150.00 City Contribution Required: $29,600.00 Anticipated Construction Schedule: In the next 2 to 4 months Approval (Signature & Date): 03....(& Comments: City contribution includes oversize participation for an 18 -inch water line from existing offsite water line to the western -most proposed fire hydrant lead, and 100 % of cost to extend 18 -inch water line from said lead to western property boundary. Service required to support the development is a 40 -foot length of 12 -inch pipe with the remaining line sized to 8 inches in diameter. Public Utilities Division Manager Approval: I1 Aa Director Approval: ^ 0 3 1— S 0 3 Funding Source: ` v lF X38 r 1 g3`6 V1cvte r k -ela(1u —Q- Comments: Finance Approval (Signature & Date): / Y/ // Attachments: Location Map and Engineer's Estimate. 1 of 1 RABON METCALF ENGINEERING - = (979) 690 -0329 - HOME \ POST OFFICE BOX 9253 19791 690 -0379 - FAX COLLEGE STATION, TEXAS 77842 (979) 219 - 4174 - CELL EMAIL RMENGINEFR @JUNO.COM March 25, 2003 Brett McCully, P.E. Assistant City Engineer City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Aggieland Carpet One — Water Line Improvements — O.P. Request Lot 1, Block One, Harley Subdivision RME No. 127 -0150 Dear Brett: Please find attached the Engineer's Cost Estimate for the above referenced project's water line improvements. As shown on the City of College Station Capital Improvements Plan an 18" water line is proposed along the front of this development and plans have been issued for its installation. As supported by the hydraulic analysis, a small portion of 12" water line and the rest being an 8" water line would meet all domestic and fire flow requirements. Therefore, oversize participation is being requested for the cost difference between the two design scenarios with a reimbursement amount of $29,600. This amount includes the ten percent (10 %) contingency as permitted in Section 9 -C.5 of the Subdivision Ordinance. Please call should you have any questions or require assistance. Sincerely, - 1/P P° Rabon A. Metcalf, ' . Filename: CD1- 127 - 0150 -L07 Page - 1 ENGINEER'S COST ESTIMATE (OVERSIZE PARTICIPATION) WATER LINE IMPROVEMENTS AGGIELAND CARPET ONE HARLEY SUBDIVISION COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT COST COST 12" & 8" Water Line Improvements 1 Mobilization & Trench Safety 1 LS $1,325.00 $1,325.00 12" PVC (C900 - DR 14 - Class 200) Water Line 2 w/Type "B" Backfill 40 LF $21.00 $840.00 3 8" PVC (C900 - DR 14 - Class 200) Water Line 378 LF $18.00 $6,804.00 wlType "B" Backfill 4 12" (MJ) Gate Valve & Box 1 EA $1,200.00 $1,200.00 5 8" (MJ) Gate Valve & Box 1 EA $700.00 $700.00 6 8" (MJ) Plug w /2" Tap for 2" (MJ) Blow -Off Valve 1 EA $750.00 $750.00 7 18 "x12" (MJ) Reducer 1 EA $700.00 $700.00 8 12 "x8" (MJ) Reducer 1 EA $500.00 $500.00 9 12 "x12" (MJ) Tee 1 EA $700.00 $700.00 10 8 "x6" (MJ) Tee 1 EA $450.00 $450.00 11 Cement Stabilized Sand Backfill 40 LF $25.00 $1,000.00 SUB -TOTAL = $14,969.00 10% CONTINGENCY = $1,581.00 GRAND TOTAL = $16,550.00 This Engineer's Cost Es 'mate was prepared in this office, at the date shown, and • released for the purpose of Nik•ubl'c infrastructure ', projections. ..••`� ®'ee �/� ,� • if r,1 :::mss 1 Ra , on A. Metcalf, • ate i � / '* ` e , * I r 1 RABON METCALF ENGINEERRING lf.-..."° MET!ALF POST OFFICE BOX 9253 :., • 1 ,11 COLLEGE STATION, TEXAS 77842 ' k ® • , -� • / I �B c Gti CELL: (979) 219 -4174 ‘441101,4" FAX: N� r ivE ER i� FAX: (979) 690 -0329 E -MAIL: RMENGINEER @JUNO.COM CD1- 127 -0150 -E08 1 of 1 ENGINEER'S COST ESTIMATE (OVERSIZE PARTICIPATION) WATER LINE IMPROVEMENTS AGGIELAND CARPET ONE HARLEY SUBDIVISION COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT COST COST 18" Water Line Improvements 1 Mobilization & Trench Safety 1 LS $1,130.00 $1,130.00 18" DIP (AWWA C151/A21.51) Water Line w/Type 2 543 LF $40.00 $21,720.00 "B" Backfill 3 18" Butterfly Valve 2 EA $6,800.00 $13,600.00 4 18" (MJ) Plug w/2" Tap for 2" (MJ) Blow -Off Valve 1 EA $800.00 $800.00 5 18 "x12" (MJ) Tee 1 EA $1,500.00 $1,500.00 6 18 "x6" (MJ) Tee 1 EA $1,200.00 $1,200.00 7 Cement Stabilized Sand Backfill 80 LF $25.00 $2,000.00 SUB -TOTAL = $41,950.00 10% CONTINGENCY = $4,200.00 GRAND TOTAL = $46,150.00 This Engineer's Cost Estimate was prepared in this office, at the date shown, an •/ s released for the purpose of • ublic infrastructure st projections. a/z-5- lam Rabo A. Metcalf, P.1 Date � .,��� ® �� ® yy � -� 00 �, RABON METCALF ENGINEERING osir /otrvi OFFICE BOX 9253 : ' * 1 COLLEGE STATION. TEXAS 77842 / _ R 1 a N-V T c A� CELL (979) • 219 -4174 • FN R GrNEEII -.3 :8 Wit' FAX: (979) 690-0329 9` l / 44, ® E- MAIL: RMENGINEER @JUNO.COMt CD1 -127- 0150 -E08 1 of 1 \- / // a co , \ / / i' i / , U /• \ / /, / \ // /, / / i / // as , Q _O / �. ♦, �'S� Southside ♦, ♦ , Plaza ♦ p� 6' / / p p p s , Harley Davidson i f / p , / Property /` \ / �• / / \` ' + % \ / S, / j 4 / / / ' / / / / / / Ne P , // / / �a ♦, ♦ 4 ,��� �• Allir 1 i, s �� 4�1�1/1� ►� ♦ � / • * / / MMMM . / ��� � / 111 ►, V ��,1/ 1 111 ��♦ / P. �_ �.. .' /. ..... OVERSIZE PARTICIPATION REQUEST CITY Of COLLEGE STATION Development Services Project Name: Southside Plaza Subdivision: Harley Subdivision, Block 1, Lot 2 Developer: Ron Smith Engineer: Rabon Metcalf Project Description: 18' DIP water line extension frorfi Harley Davidson property through Southside Plaza (northern adjacent property), along SIy north bound frontage road. Total Construction Cost Estimate: $47,740.00 City Contribution Required: $32,978.00 Anticipated Construction Schedule: r / 'In the next 2 to 4 months Approval (Signature & Date): C��z-e. C , 63 /06 /D Comments: City contribution includes oversize participation for an 18 -inch water line from existing offsite water line to the western-most prgposed fire hydrant lead, and 100 % of cost to extend 18 -inch water line from said lead to ikestern property boundary. Service required to support the development is a 40 -foot len of 12 -inch pipe with the remaining line sized to 8 inches in diameter. Public Utilities Division Manager Approval: Director Approval: Funding Source: Comments: Finance Approval (Signature & Date): Attachments: Location Map and Engineer's Estimate. l oft - - 03 ? 0. '�� RABON METCALF ENGINEERING (979) 690 -0329 - HOME l 1 "1 '; POST OFFICE BOX 9253 (979) 690 -0329 - FAX Qr9` \ COLLEGE STATION, "TEXAS 77842 (9791 279 -4174 - CELL \ EMAIL RMENGINEER@)UNO.COM March 4, 2003 Brett McCully, P.E. Assistant City Engineer City of College Station 1101 Texas Avenue South // College Station, TX 77842 RE: Aggieland Carpet One — Water Line Improvements — O.P. Request Lot 1, Block One, Harley Subdivision RME No. 127-0150 Dear Brett: Please find attached the Engineer's Cost Estimate for the above referenced project's water line improvements. As shown on the City of College Station Capital Improvements Plan an 18" water line is proposed along the front of this development and plans have been issued for its installation. As supported by the hydraulic analysis, a small portion of 12" water line and the rest being an 8" water line would meet all domestk and fire flow requirements. Therefore, oversize participation is being requested for the cost difference between the two design scenarios with a reimbursement amount of $32,978. This amount includes the ten percent (10 %) contingency as permitted in Section 9 -C.5 of the Ordinance. Please call should you have any questions or require assistance. i Sincerely, /' , 1 i \ , Rabon A. Metcalf, P.E. / z Filename: CD1- 127 -0150 -L06 Page -1 ENGINEER'S COST ESTIMATE (OVERSIZE PARTICIPATION) WATER LINE IMPROVEMENTS AGGIELAND CARPET ONE HARLEY SUBDIVISION COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT TOTAL NO. DESCRIPTION I QUANTITY UNIT I COST COST 8" Water Line Improvements 1 Mobilization & Trench Safety 1 LS $1,176.00 $1,176.00 2 12" PVC (C900 - DR 14 - Class 200) Water Line 40 LF $21.00 $840.00 w/Type "B" Backfill 3 8" PVC (C900 - DR 14 - Class 200) Water Line 378 LF $18.00 $6,804.00 w/Type "B" Backfill 4 8" (MJ) Gate Valve & Box 1 EA $700.00 $700.00 5 6" (MJ) Gate Valve & Box 1 EA $500.00 $500.00 6 8" (MJ) Plug w/2" Tap for 2" (MJ) Blow -Off Valve 1 A $750.00 $750.00 7 12 "x8" (MJ) Reducer / ,-1 EA $500.00 $500.00 8 12 "x12" (MJ) Tee 1 EA $700.00 $700.00 9 8 "x6" (MJ) Tee 1 EA $450.00 $450.00 10 Cement Stabilized Sand Backfill d 40 LF $25.00 $1,000.00 SUB -TOTAL = $13,420.00 � 10% CONTINGENCY = $1,342.00 GRAND TOTAL = $14,762.00 This Engineer's Cost I stimate was prepared ' this office, at the date shown, a d is released for the rpose of i i . : - 1 ., uree ". st projections. .o k% R bon A Metcalf, P.E\ Date • ••• 4". • • � :© � � RABON METCALF ENGINEERIN • ...: * 4[ POST OFFICE BOX 9253 4 /A' ' . 8' • O COLLEGE STATION, TEXAS 77842 , O • E �+ R l� �' �i N E R i� CELL: (979) 219 -4174 �� � °�`� 41"1" FAX: (979) 690 -0329 E -MAIL: RMENGINEER @JUNO.COM CD1- 127- 0150-E07 1 of 1 ENGINEER'S COST ESTIMATE (OVERSIZE PARTICIPATION) WATER LINE IMPROVEMENTS AGGIELAND CARPET ONE HARLEY SUBDIVISION COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT COST COST 18" Water Lme Improvements 1 Mobilization & Trench Safety 1 LS $1,130.00 $1,130.00 18" DIP (AWWA C151/A21.51) Water Line w/Type 543 LF $40.00 $21,720.00 2 "B" Backfill 3 18" Butterfly Valve 2 EA $6,800.00 $13,600.00 4 12" (MJ) Gate Valve & Box 1 EA $960.00 $950.00 5 6" (MJ) Gate Valve & Box 1 EA i / $500.00 $500.00 6 18" (MJ) Plug w/2" Tap for 2" (MJ) Blow -Off Valve 1 EA / $800.00 $800.00 7 18 "x12" (MJ) Tee 1 EA $1,500.00 $1,500.00 8 18 "x6" (MJ) Tee 1 EA $1,200.00 $1,200.00 9 Cement Stabilized Sand Backfill 80 LF $25.00 $2,000.00 SUB -TOTAL = $43,400.00 10% CONTINGENCY = $4,340.00 GRAND TOTAL = $47,740.00 This Engineer's Cost timate was prepared in this office, at the date shown, an s released for the purpose of — lit - 1 " , ' projections. /"A./-5 ,.......a,Ctr:Z OFT Ex Rab■n A. Metcalf, P.E N Date 1 �. �� • e ilk r RAB ON METCALF ENGINEERING �� ......... ' 11 ; -- �� POST OFFICE BOX 9253 ; e . ETC 4 , COLLEGE STATION, TEXAS 77842 ..... L�� RA c J , _ _ C 4 CE (979) 219 -4174 • 0 • E ; e • \� � N, F�'�r ERI�G F 4X: (979) 690 -0329 k -`- ' O E -MAIL: RMENGINEER @JUNO.COM CD1- 127 -0150 -E07 1 of 1 OVERSIZE PARTICIPATION REQUEST CITY Of COLLEGE STATION CI I \04 Development Services () Project Name: Southside Plaza Subdivision: Harley Subdivision, Block 1, Lot 2 Developer: Ron Smith Engineer: Rabon Metcalf Project Description: 18' DIP water line extension from Harlel Davidson property through Southside Plaza (northern adjacent property), along SH 6 north bound frontage road. Total Construction Cost Estimate: $47,740.00 �;' City Contribution Required: $32,978.00 Anticipated Construction Schedule: In the next 2 to 4 months Approval (Signature & Date): 0 1 L b3 / o /04 Comments: City contribution includes oversize participation for an 18 -inch water line from existing offsite water line to the western-most proposed fire/hydrant lead, and 100 % of cost to extend 18 -inch water line from said lead to western property boundary. Service required to support the development is a 40 -foot length of 12 -inch pipe with the remaining line sized to 8 inches in diameter. r� Public Utilities I Division Manager Approval: if Director Approval: Funding Source: Comments: Finance Approval (Signature & Date): Attachments: Location Map and Engineer's Estimate. 1 of 1 .. g - 5 -03 VPA �- ��� �N METCALF ENGIlHFEIItING 19791 690 -0329 - HOME S POST OFFICE BOX 9253 079) 69 0329 FAX Q COLLEGE STATION. TEXAS 77842 19791 0-03 - CELL • / EMAIL: RMENGINEERQJUNO.COM March 4, 2003 Brett McCully, P.E. Assistant City Engineer City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Aggieland Carpet One — Water Line Improvements — O.P. Request Lot 1, Block One, Harley Subdivision RME No. 127 -0150 Dear Brett: Please fmd attached the Engineer's Cost Estimate for the above referenced project's water line improvements. As shown on the City of College Station Capital Improvements Plan an 18" water line is proposed along the front of this development and plans have been issued for its installation. As supported by the hydraulic analysis, a small portion of 12" water line and the rest being an 8" water line would meet all domestic and fire flow requirements. Therefore, oversize participation is being requested for the cost difference between the two design scenarios with a reimbursement amount of $32,978. This amount includes the ten percent (10 %) contingency as permitted in Section 9 -C.5 of the Subdivision Ordinance. Please call should you have any questions or require assistance. Sincerely, 11111 Ai Rabon A. Metcalf, P.E. Filename: CD1- 127 -0150 -L06 Page -1 ENGINEER'S COST ESTIMATE (OVERSIZE PARTICIPATION) WATER LINE IMPROVEMENTS AGGIELAND CARPET ONE HARLEY SUBDIVISION COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT COST COST 8" Water Line Improvements 1 Mobilization & Trench Safety 1 LS $1,176.00 $1,176.00 2 12" PVC (C900 - DR 14 - Class 200) Water Line 40 LF $21.00 $840.00 w/Type "B" Backfill 3 8" PVC (C900 - DR 14 - Class 200) Water Line 378 LF $18.00 $6,804.00 w/Type "B" Backfill 4 8" (MJ) Gate Valve & Box 1 EA $700.00 $700.00 5 6" (MJ) Gate Valve & Box 1 EA $500.00 $500•00 6 8" (MJ) Plug w /2" Tap for 2" (MJ) Blow-Off Valve 1 EA $750.00 $750.00 7 12 "x8" (MJ) Reducer 1 EA $500.00 $500.00 8 12 "x12" (MJ) Tee 1 EA $700.00 $700.00 9 8 "x6" (MJ) Tee 1 EA $450.00 $450.00 10 Cement Stabilized Sand Backfill 40 LF $25.00 $1,000.00 SUB -TOTAL = $13,420.00 10% CONTINGENCY = $1,342.00 GRAND TOTAL = $14,762.00 This Engineer's Cost , stimate was prepared in this office, at the date shown, a d is released for the purpose of I iii • • : : N uree 0• stprojections. . ,0;1 %,.'v Nivq% vii l �( ,,r -1EOFT ` • R. bon A. Metcalf P. E , Date "%V ••• • • • RABON METCALF ENGINEERING � ••. � � , 4 � P OFFICE BOX 9253 �' a' �o • � COLLEGE STATION. TEXAS 77842 4e6:::,/ E •` pB Nmil' t � F CELL: (979) 219 -4174 �` FAX: (979) 690 -0329 E -MAIL: RMENGINEER @JUNO.COM CD1 -127- 0150 -E07 1 of 1 ENGINEER'S COST ESTIMATE (OVERSIZE PARTICIPATION) WATER LINE IMPROVEMENTS AGGIELAND CARPET ONE HARLEY SUBDIVISION COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT _ COST COST 18" Water Line Improvements 1 Mobilization & Trench Safety 1 LS $1,130.00 $1,130.00 2 18" DIP (AWWA C151/A21.51) Water Line w/Type 543 LF $40.00 $21,720.00 "B" Backfill 3 18" Butterfly Valve 2 EA $6,800.00 $13,600.00 4 12" (MJ) Gate Valve & Box 1 EA $950.00 $950.00 5 6" (MJ) Gate Valve & Box 1 EA $500.00 $500.00 6 18" (MJ) Plug w/2" Tap for 2" (MJ) Blow -Off Valve 1 EA $800.00 $800.00 7 18 "x12" (MJ) Tee 1 EA $1,500.00 $1,500.00 8 18 "x6" (MJ) Tee 1 EA $1,200.00 $1,200.00 9 Cement Stabilized Sand Backfill 80 LF $25.00 $2,000.00 SUB -TOTAL = $43,400.00 10% CONTINGENCY = $4,340.00 GRAND TOTAL = $47,740.00 This Engineer's Cost • timate was prepared in this office, at the date shown, an s released for the purpose of ... - projections. `y, ( nx9 , - v 71 Rabin A. Metcalf, P.E \ Date s gi • •• :y gym• I •. r r RABON METCALF ENGINEERING e . ?i� ...... • • 4 . POST OFFICE BOX 9253 ETC \ RAB COLLEGE STATION. TEXAS 77842 ° • • • ° L�irt v , A \-- ___ ,,, , I 4 W: 14 Q • U v ME T E G CELL: (979) 219 -4174 • °•�� FNG I NE ER CN FAX: (9791 690 -0329 ik E -MAIL: RMENGINEER @JUNO.COM co1- 127-0150 -E07 1 of 1